100% well, the actual exploitation of groundwater is 4507 tons, accounting for 94.7% of the annual exploitation plan.
The continuous downward trend of groundwater level in Changwu groundwater overexploitation area has been initially controlled, and the groundwater level in most areas has stopped falling.
length
Changzhou restricted groundwater exploitation by engineering, adjusting water supply structure and gradually replacing groundwater with surface water.
Water, overcome the decentralized water supply that has been used in history, and do everything possible to speed up the construction of water supply projects. For two years,
The total length of urban water supply network reconstruction and expansion is 42.15km, with a total investment of 87.37 million yuan.
Wujin Yangtze River Water Diversion Project, Changzhou Weicun Waterworks Project and Henglin Alternative Water Source Project are being implemented.
Stone.
In order to effectively guide enterprises to switch to tap water or river water, Changzhou adopted a "three-pronged" strategy. One is
Adjust the charging standard of groundwater resources fee by using economic leverage to reduce groundwater resources fee and tap water fee.
Price gap. The groundwater resource fee within the scope of the tap water pipe network is charged according to the 0.6 yuan per cubic meter.
The whole to 0.85 yuan, not within the scope of the tap water pipe network of 0.45 yuan per cubic meter to 0.6 yuan.
Yuan. Second, in order to reduce enterprise reform, all units that change groundwater into tap water will be exempted from tap water capacity increase fees.
Water charges, encourage enterprises to adjust the water structure within the prescribed time limit. The third is to take it from the collected groundwater resource fee.
A certain proportion of funds will be used to subsidize enterprises to save water and improve water use. It is clearly stipulated that each well should be subsidized by 500 yuan.
0 yuan. 1997, enterprises and governments in the city have invested a total of 21300,000 yuan in water improvement funds.
75 water-saving investment and renovation projects were completed, forming an annual water-saving capacity of 59.276 million cubic meters.
In the management of water intake, Changzhou actively promotes the "four ones" system, that is, each water intake well issues one copy.
Water intake permit, hanging deep well license plate, installing electricity meter, building ledger, making the city underground.
The installation rate of water metering facilities reaches 100%, and at the same time, the technical standards and operating procedures for well sealing are formulated, stipulating that every
All well sealing units shall conduct well sealing operations in strict accordance with regulations to avoid improper well sealing and pollution of groundwater resources. The city also
According to the principle of unified management of water affairs, the groundwater management system in urban areas has been straightened out and the water administrative law enforcement has been strengthened.
A reward system for reporting illegal shaft sinking has been formulated to mobilize the whole society to participate in supervision.