Introduction of Jingping Expressway?

Jingping Expressway, abbreviated as Jingping Expressway (code name: S32), is a expressway connecting Beijing and Pinggu District, with a total length of 70.33 kilometers. Construction started at the end of 2006 and was completed in June 2008. Zhong Da consults CBI Construction Network for information about Jingping Expressway:

Jingping Expressway is a two-way 4/6 lane, passing through Huanggang Bridge-Wenyu Bridge (Expressway Airport)-Guantou Bridge (Second Expressway Airport)-Beiwu Town-Dasungezhuang Town-Pinggu City-Xiagezhuang-Dalinghou Tunnel (Jixian County) and other areas. The speed limit of the whole line is 80- 100 km/h, which is a toll road. The first phase of the project was started in 2005, and fees were charged in 2006. It officially opened on June 2, 20081. In 2005, the first phase (starting point to Misan Road) was opened to traffic. Fees began to be charged in 2006. In 2007, the second phase (Misan Road to Terminal) was opened to traffic. It was opened to traffic on June 2, 20081day. Jingping Expressway is divided into Phase I, Phase II and Tianjin. The first phase of the project starts from Huanggang Bridge in the west and ends at Misan Road in Pinggu in the east. The second phase of the project starts from Misan Road in the west and ends at Dalinghou Tunnel at the junction of Beijing and Tianjin in the east. Tianjin is the part from Dalinghou Tunnel to Jixian County, Tianjin.

Jingping Expressway is the first expressway in Pinggu District of Beijing. At 20: 00 on June 2, 2008, expressway was officially opened to traffic.

The project starts from Liqiao, Shunyi District, ends at the pass of Lianggang Mountain in Pinggu District, and reaches the city boundary through the tunnel. The total length of the road is about 53.9 kilometers. The grade of the road is expressway, the design speed of the plain section is 100 km/h, the width of the red line of the road in mountainous and hilly areas is 80 meters, and the design speed of the road in mountainous and hilly areas is 80 km/h. The total investment of the Jingping expressway project is 410.3 billion yuan, which is planned to be completed in two years. The first phase of the project started in 2005, and the project from the starting point to Pinggu Misan Road was completed ahead of schedule, and the tunnel project in the terminal area started at the same time. At the beginning of 2006, the first phase was completed and opened to traffic, and at the same time, the construction of other sections began, striving to complete the civil construction by the end of 2006, and the whole line was open to traffic in early 2007. Jingping expressway will be connected with the proposed Jiping expressway.

After the completion of expressway, you can enter the Jingping Expressway from the entrance of Liqiao in Shunyi section of the Sixth Ring Road, which greatly shortens the distance and time. According to the development and reform commission of Pinggu District, the construction of Jingping expressway will place Pinggu in the "1 hour economic circle" with Beijing as the center and a radius of 100 km, and connect Tianjin, Hebei and expressway to the southeast, only 130 km away from Tianjin Port, thus becoming another important channel connecting Beijing and Tianjin.

Jingping (Beijing to Pinggu) expressway approved the charge 15 years, and the charging standard is:

● Charging standard 19 passenger cars and below 5 yuan, 40 passenger cars and above 10 yuan;

● 0.50 yuan per kilometer for buses with 7 seats or less,10.00 yuan per kilometer for buses with 9 seats or less, and 40 seats or more per kilometer 1.80 yuan;

● The toll mantissa is based on 5 yuan, and "two houses and eight incomes, three and seven are five" is collected. The charging standard shall be implemented from the date of the opening of Jingping Expressway.

The above is the introduction of Zhong Da Consulting to Jingping Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.