The factory building of the enterprise needs to be built. Which department should I look for?

Engineering technology department. According to relevant information, the cost consultation unit belongs to the engineering technical service unit, and the competent department is the local housing and urban-rural construction administration. The business license, qualification grade and business scope of the unit are handled by the Housing and Construction Bureau. Read the project approval first, and then pass the design drawings, drawing review, fire protection examination and approval, lightning protection design examination and approval, red line topographic map (stamped by the urban construction department of the local government) and planning examination and approval department of the Construction Bureau, and the factory building can be built normally.