In the busy new house, decoration has become the distress of every new owner, so what are the steps to decorate the house? What should I pay attention to when I close the house?
Decorating the house is a headache. After buying a house, I don't know how to find a decoration company. Looking for a decoration company, I am afraid that the decoration company will not do well and run to the construction site every day.
After I installed it, I was not at ease. I asked a third-party supervisor to inspect the house everywhere.
In fact, the steps of decoration are the same, which can be subdivided into the following points:
First, the preliminary preparation
In the preliminary design, one thing we have to do is to make a detailed measurement of our own room, which will not only make you accurate in building materials, but also avoid being hacked when settling accounts.
Need to be clear about the area involved in the renovation process.
Especially tile area, wall paint area, wallpaper area and floor area.
And that size of the main wall.
Especially it is necessary to design the wall size of furniture in the future.
Second, the main body of demolition and transformation
Entering the construction stage, the main body demolition and transformation is the first project, which mainly includes wall demolition, wall peeling, heating installation, plastic steel window replacement and so on.
To put it bluntly, it is to set up the framework of the construction site first.
Third, hydropower transformation.
Between the hydropower transformation and the main body demolition and transformation, the first measurement of cabinets is generally carried out. The main work is to measure the position of the lampblack machine socket, the position of the water meter and the position of the upper water inlet reserved by the developer.
After the water circuit transformation is completed, it is best to waterproof the bathroom immediately, while the kitchen generally does not need waterproofing.
Four, carpentry, brick and tile, wall paint.
Woodworking, bricklayer and painter are the "three brothers" in the construction process, and the basic order of appearance is: woodworking, bricklayer (bricklayer) and painter.
The basic entry principle is that whoever is dirty will go first.
Generally speaking, tiling will start before the end of carpentry, because the two will not conflict.
When the two are finished and the hood is installed, the measurement of the second cabinet can be started.
Finally, the wall base treatment, paint, plan to paste wallpaper wall base treatment.
Five, the kitchen ceiling and cabinet installation
The kitchen and bathroom ceiling can be said to be the first line in the installation process. At the same time, install the moisture-proof ceiling lamp and exhaust fan of the cabinet, or leave threads and openings.
After that, the installation of cabinets will begin. At the same time, there are sinks (water supply and drainage parts may not be included) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.
Six, wooden door installation, floor installation, wallpaper, switch socket installation and lamps installation.
The five aspects of this step, the installation is generally carried out in one day, and attention should be paid to cleaning up the decoration residue on the ground in time.
Seven, hardware installation, curtain rod installation and furniture appliances into the room.
Hardware installation is plumbing fittings, bathroom accessories, toilets, clothes hangers, etc. After the curtain installation is completed, it marks the basic end of home improvement. Finally, choose your favorite furniture, electrical appliances and decorations to decorate the new house.
After renovation, the house should be closed, so pay special attention to the circuit situation in the room when closing the house, and check whether the telephone socket and network cable socket reserved by the developer have modules and leads. Some housing developers have only one wire reserved for telephone sockets, which need to be led by the owners themselves. These owners should check it out and write it down in advance so as to prepare for the decoration in advance. If it is a hardcover room, the owner needs to check whether the quality of the wires embedded by the developer is qualified and whether the construction is in place, such as whether the wires embedded in the wall are threaded and whether each wire can twitch. In short, the circuit situation is a project that the owner should carefully check when collecting the house.
At this point, a perfect house is about to be born in your hands. Do you have a sense of accomplishment? Go and make your new house more beautiful and vivid.