Level 1 qualification standard:
1. Construction enterprises have undertaken two or more airport air traffic control projects (including communication, navigation, meteorological and air traffic control equipment installation projects) or terminal weak current system projects in recent five years, and the project quality is qualified.
2. The manager of the construction enterprise has more than 5 years of project management experience or has an intermediate title or above; The chief engineer has more than 8 years working experience in construction technology management and has a senior title; The chief accountant has an accounting title above the intermediate level.
There are not less than 40 engineering economic managers with professional titles in construction enterprises, including not less than 30 engineering technicians; Among the engineering and technical personnel, there are not less than 8 senior professional titles and not less than 12 intermediate professional titles, and the specialties such as communication, navigation, meteorology, electronics and computer are complete.
The construction unit shall have at least three first-class qualified project managers.
3. The registered capital of the construction unit is more than100000 yuan, and the net assets of the enterprise are more than120000 yuan.
4. The highest annual project settlement income of construction enterprises in recent 3 years is more than 20 million yuan.
5. The construction enterprise has construction machinery and quality inspection equipment suitable for the scope of contracted projects.
Secondary qualification standard:
1. Construction enterprises have undertaken two or more airport air traffic control projects (including communication, navigation, meteorological and air traffic control equipment installation projects) or terminal weak current system projects in recent five years, and the project quality is qualified.
2. The manager of the construction enterprise has more than 3 years of project management experience or intermediate title or above; The technical director has more than 5 years experience in construction technology management and has a senior title; The person in charge of finance has an intermediate or above accounting title.
The construction unit shall have not less than 30 engineers and economic managers with professional titles, including not less than 20 engineers and technicians; Among the engineering and technical personnel, there are no less than 5 senior titles and no less than 10 intermediate titles, and the specialties such as communication, navigation, meteorology, electronics and computer are complete.
The construction enterprise shall have at least 3 project managers with the qualification of Grade II or above.
3. The registered capital of the construction unit is more than 5 million yuan, and the net assets are more than 6 million yuan.
4. The highest annual project settlement income of construction enterprises in recent 3 years is more than 8 million yuan.
5. The construction enterprise has construction machinery and quality inspection equipment suitable for the scope of contracted projects.
Scope of contracted works:
First-class construction enterprise: it can undertake the construction of all kinds of airport air traffic control projects and terminal weak current system projects.
Secondary construction enterprise: it can undertake the construction of airport air traffic control project and terminal weak current system project with the single contract amount not exceeding 5 times of the registered capital of the enterprise and the flight zone index of 4D or below.
Note: Airport air traffic control works include: control centers such as area, approach and tower; Ground-to-air communication, automatic transmission, satellite ground station, airport wired communication, mobile communication and other communication systems; Navigation systems, such as radar, automatic correlation surveillance (ADS), instrument landing system and route navigation station; Navigation information system; Aviation meteorological engineering such as conventional meteorological observation system, automatic meteorological observation system, meteorological radar, meteorological network, satellite cloud image reception, etc.
The weak current system project of the terminal building includes: integrated wiring, building automation, flight dynamic display, departure system, closed-circuit television monitoring system, broadcasting system, computer ground information system, clock system and other subsystem projects.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.