Transitional labor price

1. Each side of prefabrication process is about 170 yuan, and the contents of the construction contract are about: operation and maintenance of portal crane, trial assembly and dismantling of box girder formwork, formwork painting and maintenance, fabrication and installation of embedded parts, concrete transportation, concrete feeding, pouring, vibrating, decoration and maintenance, leveling, pre-embedding of prestressed pipes, anchoring concrete, etc. (The project department will supply concrete according to the quota, provide a full set of templates, bolts and other corresponding accessories, and hand them over to Party B after the portal crane test. )

2. Each side of the cast-in-place process is about 500-550 yuan, and the construction contents are about: manufacturing, assembly, erection, disassembly, maintenance, maintenance, transportation, storage, stacking, coating release agent (including the raw material cost of release agent), and installing vibrators attached to internal and external formwork systems; Procurement, unloading, laying, processing and transshipment of square timber from support to box girder bottom formwork; Manufacture of anchor pad and saw-tooth template, and manufacture, installation and removal of all small steel structures and wooden models; Manually cooperate with preloading; Concrete pouring, tamping, surface closing, curing, roughening, trimming, mending and sealing; Manufacture, installation and material transfer of various embedded parts and ironware (including materials of drainage pipes, exhaust holes and other pipelines); Installation and disassembly of upper and lower bridge steps and lighting frames, reserved manholes, roughening of tensioning notches, straightening and restoring reinforcement and sealing ends; Manual and mechanical water bag preloading (individual parts are jack-up steel preloading, etc.). ) and all other matters.