As a developer, there are several things you need to do before building, in turn:
First of all, bid for land and pay land payment (deed tax, etc.). ), and then sign a land transfer contract, handle land certificates, handle land planning permits and site selection opinions;
Second, handle the examination and approval of the National Development and Reform Commission;
Third, the survey, design, supervision and construction units are determined through bidding, and they are required to perform their respective duties, and the design units are required to produce design drawings (I won't describe them one by one);
Four, design drawings with fire approval and project planning permit;
V. Construction permit and construction site.
The above are some big node processes, and the small steps are omitted.