When will eastern Handan be developed?

Is the eastern part of Handan a new city or several counties in the east?

First of all, talk about Chengdong New Town. Now many real estate developers are here, and most of them pay the house on 20 19. Hebei University of Engineering is also under construction, and the hospital is here. The most important thing is that Handan high-speed railway station is here, so it is very convenient to travel! Don't be happy at first, and then it will drive up house prices (which is hard for many working-class people to accept). It would be more perfect if Handan had another subway! Personally, I feel that the East New Town of Handan will develop in five years!

Let's talk about several counties in eastern Handan, such as Guangping County, Guantao County and daming county. To develop rapidly, the first thing is convenient transportation!

1: Handa Expressway and Daguang Expressway pass through Daming County, and there are many exits. Shandong section of Handa-Dalian Expressway is under construction, which will greatly facilitate daming county.

2. There is only one Qinglan Expressway in Guantao County, which is the easternmost county in Handan. Several "characteristic towns" in Guantao County are not bad! It can promote local tourism. If the planned "long talk about high-speed rail" can be approved, it will be better for Guantao County!

3. Not far from the north of Guangping County is Feixiang District, and not far from the south is wei county. It's far from expressway. Can only rely on "long talk about high-speed rail"!

Handan East New District (referred to as "Handan East District", referred to as "East District") is the dominant development direction of the city determined by the fourth urban master plan approved by the State Council, and it is the main space to undertake emerging industries and urban functions of Handan in the future. The East New District officially started construction from 20 13, with a total population of about 500,000. As a key development area in Handan, the East District is generally defined as "three districts and one center", namely, the core area of modern service industry, high-tech industrial cluster area, ecological livable demonstration area and administrative, cultural, sports and science and education centers. It has become an important node city for the integration of Beijing, Tianjin and Hebei. [10] According to the requirements of the master plan, the development of the eastern region is the key development and construction area of Handan during the Tenth Five-Year Plan period and in the next few years, and it is a comprehensive new urban area that highlights the vitality and urban characteristics of Handan as a modern megacity. The East New District will be built into a demonstration area of low-carbon economy and circular economy, leading the sustainable development of Handan metropolitan area.

The planning scope of the East District starts from Qinhuang Street in the west, Wei Wu Street in the east, Suhuang Road and Fuyang River in the north, and the planned South Ring Road extends eastward in the south, with a total area of about 96 square kilometers. From north to south, it consists of three parts, namely, the national Handan Economic and Technological Development Zone in the north, the core area in the east and the provincial Handan Industrial Park in the south.

The landmark projects in the East District are larger in scale and carry more service functions. For example, a youth activity center that satisfies citizens and students to understand the unknown world; A number of municipal infrastructure projects, such as the Passenger Transport Center, Handan East Station and Media Center, are convenient for citizens to travel. Among them, the completed projects include a new campus of No.1 Middle School in Hanshan District, a science and technology center, a youth science and technology center, Hebei University of Engineering, three centers in Handan City, a new media industrial park in Handan City, and a sports center in Handan City.

Handan municipal government's 202 1 investment plan shows that the key projects under construction mainly include:

1. Comprehensive road network of central business district and underground common ditch of Cishan Road. Comprehensive road network of central business district: 6.12km of underground road, 2.9km of underground common ditch and 6.27km of surface road are mainly built.

2. Underground common ditch of Cishan Road: The total length of the road is 5.43km, and the red line is 30 m. It is mainly used for the construction of common ditch, road, bridge, rainwater and sewage, lighting, traffic safety and other projects. It is expected to be completed in 2022. 12. 202 1 year construction content: complete the construction tasks of the main gallery and underground and surface roads of this project.

3. The new East Campus (medical area) project of Handan First Hospital, with a planned total construction area of 430,000 square meters and 2000 beds. The construction contents include outpatient building, inpatient building, administrative office building and ancillary buildings, which started in June 20021year and was completed in February 2024.

4. Chunhua Qiushi Junior High School, with a total construction area of about 20,000 square meters and a 300-meter circular runway playground, stadium, stands and greening, started in 2022 and was completed in February 2023.

5. Zhaowang Street Road Project in Handan City (Hanlin Road-Renmin Road), with a total length of 6.5 kilometers. The route crosses the road plane at 17, with extra large bridge 1 seat, 3 small bridges and culvert 1 seat. Greening, lighting, rainwater and sewage pipelines and traffic safety facilities were set up on the whole line, which was completed in 2028+02. 202 1 construction content: installation of superstructure, upper tower column, main girder, pedestrian passage, upper structure of approach bridge and approach foundation of Zhanghe Bridge.

6. Renmin Road Street Lamp Project (expressway East Exit-Century Street)

7. Newly-built Fire Command Center in East District of Handan City (part of special fire station)

202 1 key projects of Handan municipal government investment reserve plan mainly include:

1. Add the southeast ring branch line of Beijing-Hong Kong-Macao Expressway and the interchange project of G309 National Road, and build Feixiang West Interchange, which is about 4.9 kilometers away from Handan East Interchange in the north and 13 kilometers away from Hesha Town in the south. The intersection is G309 national highway, and the interchange adopts double horn type. The total length of the main line in the interchange area is about 10 14m, the design speed of the main line is 120km/h, and the subgrade width is 28m. The length of the opposite two-lane ramp is about 132 1m, the design speed is 40km/h, and the subgrade width is16.5m. The length of the one-way one-lane ramp is about 4319m, the design speed is 40km/h, and the subgrade width is10.5m.. Three new ramp bridges will be built at the interchange, and 5-in and 5-out *** 10 lane toll station and 1 residential building will be built.

2. The road project of Zhaowang Street (from Renmin Road to the east extension of South Ring Road) starts from Renmin East Road and ends at the east extension of South Ring Road, with a total length of 4.95 kilometers. The first-class highway is expanded into a municipal road with a design speed of 60km/h, a red line width of 60m and a green line width of110m. The project includes subgrade, pavement, bridges and culverts, rainwater and sewage pipes, intersections, lighting, traffic safety facilities and greening. There are two interchanges on the whole line, which are expected to start in 2022 and be completed in 2023.

3. The road project of Maosui Street (Congtai Road-Huang Yu Road) is expected to be completed in 2022.6438+02;

4. Lian Fang Road East Extension (Maosui Street-Wei Wu Street) is expected to be completed on 2022.438+02;

5. The road project of Yedu Road (Maosui Street-Wei Wu Street) is expected to be completed on 202 1. 12;

6. Ping Yuanjun Avenue (Lian Fang Road-Huang Yu Road) road project, which is expected to be completed in February, 2022.5438+02;

7. Ximen Bao Street (Lian Fang Road-Huang Yu Road) road project and Gongsunlong Street (Lian Fang Road-Huang Yu Road) road project are expected to be completed in 2028+02;

8. Drainage and flood control area in the east of Handan City;

9. Handan Dongjiang Phase II Project, the planning and construction scheme of Dongjiang Phase II Project starts from the intersection of Zhaowang Street and Dongjiang Phase I, and the river extends eastward to Maosui Street along the north side of Hebei University of Engineering, passes through Maosui Street, passes through Hanlin Road to the north, and finally discharges into Fuyang River. The length is about 4.2 kilometers, not including village demolition.

10. Limu Street (Lian Fang Road-Beicang Road) road works, with total length of about 1 km and red line width of 30m. The construction contents mainly include: roads, drainage, reclaimed water, lighting, traffic safety facilities and greening projects. This project adopts EPC mode, which started in June 20021year and ended in February 2022.

1 1. The road project of Qinhuang Street (Renmin Road-He Zhizhang Bridge) started in June 20021year and ended in February 20021.1year.

12. The pipe gallery project of Zhaowang Street (Hanlin Road-Huang Yu Road) and the underground pipe gallery project of Lianpo Street (Hanlin Road-Shuntong Road and Yongtong Road-Renmin Road) are expected to be completed in 2023+08.

13. Landscape lake in the central business district, with a water area of about 62,000 square meters and an average lake depth of 2.5 meters. The main construction contents include lake digging, greening and pipeline laying. It is expected to start in 2022 and end in 2023.

14. The road project of Lianpo Avenue (Hanlin Road-National Highway 309) is expected to start in 2022 and end in 2023.

In the past, the development of Handan actually relied on the primary industry. Steel, coal and half a textile. Not now, let alone real estate. The price of so many uncompleted residential flats is still too high. It is not enough to build universities and hospitals. The real attraction is that this place can make money. Therefore, without a large number of factories, enterprises and businesses, development is impossible.

Whether it can be developed depends on the orientation of the eastern new district. It is true that urban planning can be ahead of schedule, but it is more important to solve the problems existing in Handan's primary, secondary and tertiary industries. When the industry is prosperous, people can flow and logistics can be improved. It is easy to build a city, but it is not so easy to attract people.

How to develop Handan is a good topic. Handan's development is not empty talk. First of all, it is flat to develop eastward, which is convenient for planning, construction and political achievements. However, there are no granaries in southern Hebei, and the main grain, cotton and oil producing areas are gone ... Instead, there are many high-rise buildings, spacious roads and large squares covered with reinforced concrete, while the western part is a semi-hilly area. If we can consider the Chongqing model, is it comparable? The mountain city can still be used effectively, but Handan is developing to the west, benefiting the people and the country, and it can also leave land for the descendants of Handan to live in.

Which district in the east of Handan do you mean? Geographically, the mountainous area in the west of Handan, which is short in the north and short in the south and long in the east and west, has reached the bottleneck. Developing the east is the only choice. The North China Plain in the west can be developed for tourism and vacation, and Handan in the east will take off. Because the region is doomed, as long as the eastern part develops the whole Handan economy, it will rise. Developing eastward, radiating all districts and counties in the north and south.

Handan East District stands proudly in the east of the city, with convenient external transportation and complete public facilities. As a new industrial zone approved by the State Council, the East District of Handan City takes "three districts and one center" as its overall orientation, and plans to build a modern service industry core area, a high-tech industrial cluster area, an ecologically livable demonstration area and an administrative, cultural, sports, scientific and educational center.

In addition, it is planned to build the first underground pipe gallery project, the first passenger hub, the first financial and business district, the first underground city that never sleeps, the first high-standard sports center, the first university town with large investment, and a number of modern high standards.

The development trend of the eastern district is like the rising sun, and the grand urban blueprint is realizing the development dream of this city and leading the future development of this city.

The eastern part of Handan is very similar to the previous high-tech zone. Six years ago, Century Street was basically empty, and huge 4S stores were tested on Century Street, but now, there are three small jams every day. In five or six years, the East District will be as prosperous as the high-tech zone now!

There should be several prefecture-level cities in Hebei Province. For example, a prefecture-level city should be set up in the central part of Hebei Province, mainly in cities and counties such as Renqiu Hejian, Levin, Li Xiaoning County and Boye, xian county; a prefecture-level city should be set up in the southeastern part of Hebei Province, and Taoqiu County should be set up in daming county. There are prefecture-level cities in Huanghua Port Area, including Huanghua Yanshan Port Area and Zhongjie Agricultural Area. This proposal is to revitalize Hebei's economic construction. There are almost eighteen prefecture-level cities in Henan Province and Hebei Province.

To develop the east, it is necessary to demolish and replace the old city in the west. The development of the East is to draw on the whiteboard. First, improve the ecological environment, standardize roads, build a sponge city, and build urban green lungs and wetland parks. When the environment is well developed, people will be willing to go. There is too little green space in the old western city, and the living density of water system noise and exhaust gas is very worrying. Land and economic development have encountered bottlenecks, and some functions need to be transferred to the eastern cities. Under the guidance of xiong'an new area's urban development model, it should take about ten years to develop rapidly by continuously optimizing the industrial structure, retaining the population and letting people live and work in peace and contentment.

The east lacks matching facilities.

A friend of mine who pulls building materials told me that the sewers of local houses all lead to a temporary pit.