Is the all-inclusive decoration company reliable? Matters needing attention in all-inclusive decoration.

All-inclusive decoration is a common form of decoration companies now. All-inclusive decoration has many advantages, which can save a lot of energy and budget for the owners and make them feel more at ease. So how much do you know about all-inclusive decoration precautions? Let's give you a detailed introduction to the all-inclusive decoration company. Matters needing attention in all-inclusive decoration?

First, is the decoration company all-inclusive?

1. First of all, it includes all wall modifications, including wall laying, trunking and demolition of old walls.

2. Supply and installation of all water pipes, wires and trachea materials.

3. Bathroom water pipes are laid, and light materials are backfilled and leveled.

4, kitchen, balcony and bathroom floor waterproof processing work.

5. All rooms shall be leveled and floor tiles shall be laid.

6, metope grassroots putty processing and latex paint coating.

7. Installation of bathroom sanitary ware and all indoor lamps.

8. The modeling part includes all auxiliary materials and labor for TV background wall, living room, master bedroom, entrance and cloakroom ceiling.

9. Woodworking mainly includes wardrobes, kitchens, TV cabinets and shoe cabinets. This can be omitted if you buy it yourself.

10. All-inclusive decoration means contracting for work and materials, and all the decoration contents are undertaken by the decoration company, and the materials used for decoration. Owners who choose all-inclusive decoration are generally not very professional and need to rely entirely on the decoration company to complete it. Therefore, when choosing the all-inclusive package, we must first negotiate the price with the decoration company, and then we can entrust it to decorate our house.

1 1, infrastructure renovation and wall renovation; Layout of indoor pipes; Structural arrangement and waterproof treatment of toilet. Waterproof treatment of water-rich space; Ground treatment of lamp space in bedroom and living room; Floor tiles are laid on the ground and wall tiles are laid on the wall; Install lamps in all rooms.

12, modeling part (including all accessories and labor) TV wall modeling; Living room, dining room, master bedroom, master bedroom porch, cloakroom ceiling. Woodworking mainly includes kitchen cabinets, wardrobes, shoe cabinets or TV cabinets. You can save this link if you buy it yourself.

Second, the decoration package matters needing attention

1. After the decoration company is selected, it is necessary to communicate with the designers of the decoration company in the early stage. Designers will make preliminary design ideas after understanding the design needs and use needs of the owners.

It is best to measure the house on the spot before design, because there will be some errors and omissions in the drawings provided by the developer. At the same time, designers should understand the indoor scene and surrounding environment, and then further improve and revise the previous design concept.

3. The scheme diagram designed by the designer shall include the drawing catalogue, room layout, effect diagram, elevation diagram, top view, node diagram and budget quotation for home improvement.

If you are satisfied with the company's design scheme, you can sign a contract. If the contract is not fully stated or there are other places that need to be supplemented, a supplementary agreement needs to be signed and a down payment needs to be paid after the home improvement contract is signed.

5. Some decoration companies will pay a return visit to the owners after signing the contract again, and a customer service specialist will remind the owners of relevant precautions in time.

6. The owner and the designer, including the person in charge of on-site construction, shall make disclosure at the construction site and communicate with the drawings and construction projects. If the design scheme needs to be changed during the disclosure, it shall be registered at the site and signed by relevant personnel for confirmation.

7. After the decoration company sends the materials to the construction site, the owner shall accept the materials.

The above contents are related contents introduced to you in this issue of Bian Xiao, and you should know something about them.