2. Pay attention to the order of door and floor installation. It is suggested to install the door first, and then install the floor.
After foundation treatment, other projects can be carried out. When the construction period draws to a close, it's time to install the floor and wooden door. Who should install the wooden door and floor first? Let's analyze it.
If the floor is installed first, some problems cannot be solved.
(1) The position of the buckle at the transition between the living room and the bedroom cannot be determined. The process requires that the buckle must be directly below the wooden door, and the buckle can't be seen inside and outside after closing.
(2) After the floor is installed, do the baseboard. If the door cover is not installed, the skirting lines on both sides will not be fixed, and the workers who install the floor will have to come and repair it, wasting both sides' time.
Install the door first, the door cover can reach the ground directly, and when installing the floor, you can use the chainsaw to saw a reasonable space under the door cover to lay the floor.