Introduction of Ningxia project bidding information network?

Ningxia project bidding information network belongs to Ningxia Hui Autonomous Region public resources trading network, which is a professional website for trading services in the fields of project bidding, government procurement and construction project bidding information management. Ningxia Bidding Network actively performs its corresponding duties and maintains the order of all kinds of engineering procurement projects.

General situation of public resources trading network in Ningxia Hui Autonomous Region;

Ningxia Hui Autonomous Region Public Resources Trading Administration was established in 1959, formerly known as the Autonomous Region Machinery and Equipment Bureau. It is a deputy department-level institution in Nanjing, which was once under the vertical management of several central ministries and commissions. From June 5438 to February 2000, the central ministries and commissions were reformed and handed over to local management. In April of 200 1 year, it was renamed as the Equipment Tendering Bureau of the Autonomous Region and upgraded to a departmental institution directly under the People's Government of the Autonomous Region. In August, 2003, it was renamed as the Bidding Bureau of the autonomous region (the procurement center of the autonomous region government), and the management of "one institution, two brands" was implemented. In February 2008, it was renamed as the bidding management service bureau of the autonomous region, and in February 20 1 1, it was renamed as the public resources trading administration of the autonomous region.

In order to standardize the bidding market in Ningxia, combined with the actual situation of bidding in this region, the Regulations on Building Management in Ningxia Hui Autonomous Region is formulated. The basic contents include: (1) general provisions (2) qualification management and building permit (3) contract awarding and contracting management (4) intermediary service management (5) cost management and other related contents, among which the basic contents of construction project quality management are as follows:

Forty-eighth construction quality responsibility system for life.

The project quality of a construction project shall be the responsibility of the administrative leaders of the relevant industry departments of the people's government of the autonomous region or the administrative leaders of the cities and counties (districts) where the project is located according to the affiliation of the construction project. The legal representative of the project and the legal representatives of the survey, design and supervision units shall be responsible for the project quality according to their respective responsibilities.

The administrative person in charge of the project, the legal representative of the project and the legal representatives of the survey, design and supervision units shall be responsible for the quality of the project for life according to their respective responsibilities.

Construction administrative departments, relevant professional management departments and engineering quality management institutions must strengthen the quality management of construction projects, supervise the units and personnel engaged in construction activities to carry out construction activities according to law, and ensure the quality of construction projects.

Article 49 The quality of survey, design, construction, materials and equipment of a construction project must meet the requirements of laws, regulations and relevant engineering technical standards, quality inspection and evaluation standards, safety standards and seismic standards.

Fiftieth construction engineering survey and design units must be responsible for the quality of their survey and design technical achievements and survey and design documents, and abide by the provisions of relevant laws and regulations, technical standards and specifications for engineering survey and design, and contractual agreements.

Survey and design units shall not undertake survey and design tasks beyond the qualification level and scope, shall not transfer drawings and seals, shall not designate suppliers of building materials, building components and equipment, and shall not undertake survey and design tasks without a license or in the name of individuals.

Fifty-first construction units shall not change the design documents without authorization, and the construction project contracting units shall organize the construction according to the design documents and be responsible for the quality of the contracted projects. Construction units and project contractors must be responsible for the quality of the building materials and equipment they purchase, and may not purchase or use building materials, building components and equipment that do not meet the design requirements.

Fifty-second building materials, building components and equipment manufacturers must meet product standards and be responsible for the quality of their products.

Fifty-third engineering supervision units should be equipped with enough qualified supervision personnel, follow up in place immediately according to the operating procedures, and supervise and inspect the construction projects.

Without the signature and approval of the relevant supervisors, building materials, building components and equipment shall not be used or installed in the project, shall not enter the next project construction, shall not allocate the project progress payment, and shall not carry out the completion acceptance; Those who do not meet the quality requirements of the project shall not sign, and shall have the right to order them to make corrections and report to the relevant competent departments.

Article 54 The construction unit shall go through the project quality supervision procedures before the project starts, and the construction project quality supervision institution must supervise the construction project quality and its structural design.

The construction project must be accepted by the construction project quality supervision institution and obtain the use license before it can be delivered for use. Without acceptance or unqualified acceptance or without obtaining a license, it shall not be used or sold, and shall not apply for a property right certificate.

If the quality of the tested construction project does not meet the requirements and there are defects, the contractor shall repair it within a time limit; The resulting repair costs and economic losses shall be borne by the responsible party.

When the construction project is delivered for final acceptance, the contractor shall provide the construction unit with complete engineering technical files and relevant materials such as project use, warranty and maintenance.

In accordance with the provisions, the project completion files and other materials shall be submitted, and the employer shall submit them to the construction administrative department of the people's government at or above the county level within six months after the project is delivered.

Fifty-fifth construction projects should be guaranteed in accordance with state regulations. The warranty period of engineering quality shall be calculated from the date of acceptance, and the maintenance expenses during the warranty period shall be borne by the responsible party; For the engineering damage caused by force majeure, the maintenance cost shall be borne by the construction unit. The quality of the project after the warranty shall be qualified by the construction project quality supervision institution.

Article 56 Any unit or individual has the right to report, accuse and complain about quality accidents and quality defects of construction projects to the construction administrative department and other relevant departments.

Construction administrative departments and other relevant departments shall establish a system of accepting reports, complaints and appeals, and the complaints, accusations and reports of quality accidents and quality defects in construction projects must be investigated and handled in a timely manner according to law.

Zhong Da Consulting Reminder: Relevant construction enterprise personnel who want to know the management methods, government procurement law and bidding law of government procurement can log in to Zhong Da Consulting architectural knowledge column to inquire about the corresponding strategies.

Basic information of Ningxia Bidding Network: