How much is the construction cost of self-built houses in rural areas of Zhongshan?
1. Material cost mainly refers to the cost of various raw materials, auxiliary materials, components and semi-finished products that constitute the housing entity. For self-built villas, material cost is one of the big expenses, which can basically account for 50% ~ 60% of the total cost. The algorithm is material consumption x material unit price.
2. Labor cost is the wages of workers directly engaged in engineering production and auxiliary production, accounting for about 30% ~ 40% of the total cost. Calculating wages by working hours will inevitably lead to delays in the project. Only by paying wages according to the actual workload of each worker can we speed up the construction progress and effectively control the cost! The labor price is still obtained from the local construction Committee.
3. The machinery fee is the rental fee for equipment such as mixers and elevators. The key to saving money is to negotiate with the construction team to control the entry time of all kinds of equipment, and don't rent it all at once to waste resources.
4. The cost of measures is a variety of costs in the construction process of non-construction entity projects, which is becoming more and more complicated. Generally, the budget is based on 20% ~ 30% of the labor cost.
What should be paid attention to in the construction of rural self-built houses in Zhongshan
1, preparation before construction, selection of construction team, investigation of local construction team before construction, selection of professional construction team with good technology, construction machinery, construction experience and comprehensive quality, so it is a qualified construction company.
2. Select design drawings and special general atlas. Construction drawing is an important basis for construction projects, which directly determines whether the structural safety and use function of the project are reasonable. In addition, the supervision, acceptance and dispute settlement in construction should be based on drawings. Before construction, design drawings or select special construction atlas. For those who choose atlas, their foundation should be checked by professionals to ensure structural safety.
3. Site selection: Before Lecong builds a house, it is necessary to investigate the surrounding geological environment. We should try to avoid building houses in ditches, ponds and places with cesspits and graves. In order to prevent the uneven settlement of the foundation, the house will crack or even collapse.
4. After signing the contract in Lecong and selecting the construction team, both parties should sign a formal contract to stipulate related matters (especially the project site selection, construction period, materials and quality requirements, project quality, safety responsibility, warranty period, dispute settlement and project cost settlement, etc.). ) in the contract.
The above is the construction cost of self-built houses in rural areas of Zhongshan. What should be paid attention to in the construction of rural self-built houses in Zhongshan? Because private houses involve the scope of land use rights and the use of surrounding space, rural residents are particularly concerned. In the process of building construction, such as foundation excavation, material stacking, noise, etc., it is easy to bring adverse effects to the surrounding area. After the house is built, sunshine, wall, drainage and lighting are all factors that are easy to cause disputes.