Team safety management in centralized control center?

Team safety management 1 safety production objective: no personal death or serious injury accident, no minor injury accident, no abnormality or attempt, no habitual violation, no first-class obstacle of team responsibility, no error-free operation accident, no short circuit accident of small animals, qualified rate of working ticket 100%, qualified rate of operating ticket 100%, no fire accident, and no equivalence. 2.2 The place and form of safety activities are not limited, and practical results are emphasized. The main contents should include: learning safety regulations, conveying safety production documents, notices, instructions and meeting spirit, arranging and summarizing safety production work, analyzing safety situation, conducting safety discussions, conducting accident prediction and anti-accident drills, and learning fire control knowledge to carry out fire control drills. 2.3 Safety activities shall be recorded by audio recording. For those that are not suitable for recording, such as fire drills and anti-accident drills, pictures or videos can be used for recording. 3 temporary employment management 3. 1 The team needs temporary employment and must go through the examination and approval procedures. 3.2 Temporary workers used by the team must have a valid safety agreement. 3.3 The temporary workers used must comply with the provisions of the Labor Law of People's Republic of China (PRC). 3.4 Before construction, the team must make disclosure of safety technical measures for temporary workers, make clear the dangerous points, matters needing attention and work scope, and make clear that the special person is responsible for the monitoring management at work. 4. Safety management of foreign personnel and construction personnel 4. 1 Construction personnel entering the substation construction site shall abide by the safety management regulations of the substation, and must go through the formalities of working ticket when entering the production area, and shall not change the safety measures without authorization. 4.2 For foreign construction workers and their temporary workers, corresponding procedures must be handled. After passing the safety training and examination, enter the substation under the leadership of the person in charge of the work. In case of violation of substation safety management regulations during construction, operators have the right to order them to leave the substation. 4.3 Leaders at all levels and outsiders must enter the equipment site under the guidance of team members and wear safety helmets. 4.4 When the substation power supply is used in the construction operation, it must be approved by the substation operators, and the introduction position must be clearly defined. 4.5 Construction personnel shall not enter the equipment interval outside the scope listed in the working ticket. When there is any doubt in the operation, stop the operation first and report to the operator immediately. 5 working ticket management working ticket should use the standard format of "Power Safety Work Regulations of State Grid Corporation", and the working ticket management should be implemented according to the new regulations of Production Technology Department of Henan Electric Power Company 20 10. 6 Operation ticket management Operation ticket should be in the standard format of "Power Safety Work Regulations of State Grid Corporation", and the filling of operation ticket should meet the requirements of "Operation Ticket Management Specification for Substation Working Tickets of Henan Electric Power Company" (Yudian Biotechnology [2006] No.664). It is not allowed to use ordinary micro-mechanism tickets, but the expert system of error-proof operating system can be used to make tickets, but it must be strictly audited. 7 Anti-misoperation locking device management Anti-misoperation locking is an important technical measure to prevent misoperation accidents, and its devices must be managed as electrical equipment. Management regulations should be strictly implemented in accordance with the relevant requirements of Henan Electric Power Company. 8. Fire management 8. 1 fire management 8. 1. 1 The team shall formulate fire control measures according to the fire control laws and regulations promulgated by the state and earnestly implement them. 8. 1.2 The team should strengthen the management of fire-fighting equipment and facilities to ensure that it is in a normal state. 8. 1.3 The cable tunnel and interlayer of unmanned station should have fire-fighting facilities, and the cable perforations such as control panel, switchboard and junction box in the switch yard area should be blocked with fireproof materials. 8. 1.4 inflammable and explosive articles shall not be stored in the equipment room or equipment area of unmanned station. Strengthen the management of inflammable and explosive articles placed in the equipment area due to construction needs, use them according to the specified requirements, and transport them away immediately after the construction. 8. 1.5 Hot work is prohibited in inflammable and explosive areas in unmanned stations. Under special circumstances, hot work procedures must be handled with the competent department, and safe and reliable measures must be taken. 8. 1.6 Operators should learn fire fighting knowledge and the use of fire fighting facilities and fire fighting appliances in unmanned stations under their jurisdiction, and be familiar with fire alarm telephone (1 19) and alarm methods. 8.2 Anti-theft management 8.2. 1 Foreign personnel entering the substation must go through relevant formalities with relevant departments, show relevant certificates and register. 8.2.2 Substation shall regularly check the integrity of burglar alarm system and test alarm device every month, and handle problems in time when found. 8.2.3 Operators should pay attention to the patrol of safety facilities when patrolling equipment. 8.2.4 The fence of substation shall not be dismantled at will. If it is really necessary to dismantle it because of work needs, it must contact the relevant departments in advance, obtain consent and formulate effective anti-theft measures before dismantling and modifying it. 8.2.5 The perimeter alarm system of substation should be included in the equipment patrol inspection, and the problems found should be recorded in the equipment defect record. 9. Prevention and management of small animals 9. 1 The team should formulate measures to prevent small animals, check the implementation regularly once a month, handle problems in time and make records. 9.2 The doors and windows of each computer room shall be intact and tight, and the doors and windows shall be closed at any time when entering and leaving. Facilities (such as baffles, net doors, etc.). ) Prevent small animals from entering all switch cabinets, electrical rooms, junction boxes and mechanism boxes. 9.3 The cable trench and tunnel leading to the outside in the machine room shall be tightly closed, and shall be closed in time after construction demolition. 9.4 Food shall not be stored in each work area, and it is forbidden to grow food crops in the station. Rodenticide or mousetrap and mousetrap glue should be put in according to regulations. 10 management of flood control, lightning protection, wind prevention, cold prevention and earthquake prevention10/0/The team shall formulate corresponding measures for lightning protection, flood prevention, wind prevention, cold prevention, earthquake prevention and high temperature prevention of the equipment according to the climatic characteristics, geographical location and actual situation of the substation. 10.2 The substation shall be equipped with corresponding flood control equipment and flood control materials as required, and the flood control equipment shall be comprehensively inspected and tested before the flood season every year to ensure that it is in good condition; Flood control materials should be kept by special personnel and special accounts. 10.3 during the flood season, check the equipment box door, rain-proof facilities and drainage facilities in good condition. 10.4 check the water accumulation in the basement, cable trench and cable tunnel after the rain. , and timely drainage. When the humidity in the machine room is too high, do a good job of ventilation. 10.5 when there is wind, it is important to check whether there is any abnormality in the equipment drainage line, lightning arrester and gas relay rain cover. 10.6 regularly check and clean up the floating objects in the equipment area, fence and surrounding area of the substation to prevent the running equipment from being blown by strong wind and failing. 10.7 when the temperature is low in winter, it is important to check whether the heater in the switch mechanism works well, handle the problems in time when found, and take cold-proof and heat-insulation measures for the mechanism box. 10.8 before the thunderstorm season, strengthen the inspection of lightning protection facilities and grounding devices, and report and handle any abnormality immediately. 10.9 strengthen the implementation and management of earthquake emergency plans and carry out the investigation of hidden dangers of equipment after the earthquake. 1 1 management of safety instruments 1 1 The substation shall be equipped with a sufficient number of effective safety instruments according to the Regulations on Standardized Configuration of Instruments of Henan Electric Power Company, and all kinds of safety instruments shall have appropriate qualified spare parts; Substation operators should correctly use and keep all kinds of safety instruments. 1 1.2 All kinds of safety instruments shall have clear numbers. Insulating devices such as insulating rods and electroscope must be marked with voltage grade and test date, and should have rain cover. Safety tools should be stored in a clean, dry, moisture-proof and dew-proof place in the substation (it is forbidden to put them on the ground or against the wall). The insulation tool room should have a test cycle table for wet and dry thermometers, ventilation and dehumidification devices and insulation safety instruments. 1 1.3 substation operators should carefully check the safety tools during shift change and before use, and stop using them if they find any damage, and supplement them as soon as possible. 1 1.4 All kinds of safety tools shall be inspected according to the cycle specified in the safety regulations, and can only be used after passing the inspection, and shall not be used beyond the time limit. 1 1.5 portable grounding wire should be composed of multiple strands of transparent sheathed soft copper wire, and its cross section should not be less than 25mm2. At the same time, it should meet the requirements of short-circuit current at the installation site. The conductor is not broken, the sheath is intact, the two ends of the grounding wire are firmly contacted, the clamp is not damaged or loose, and the spring is effective. Both the storage location and the ground wire body are numbered, and the storage should be carried out accordingly. 1 1.6 The specifications of all kinds of signboards shall meet the requirements of Appendix 1 of the Code of Practice for Power Safety of State Grid Corporation, with complete types and orderly storage, and the quantity can meet the work needs. 1 1.7 When working in the substation, outsiders are not allowed to bring any form of grounding wire into the substation. The grounding wire provided in the substation shall be used to hang the grounding wire when working. Operators should record the grounding wire of the lending team in the Duty Record and the Grounding Wire Installation Record Book, and be responsible for the location and correctness of the grounding wire installed and disassembled in the substation. 12 Traffic Safety Management Station 12. 1 Make clear the vehicle passage and mark it. 12.2 The station must be equipped with speed limit, height limit, stop sign and corresponding station sign, and the specific limit should be comprehensively determined according to the actual situation of the station, safe distance and other factors. 12.3 when going out for equipment inspection and brake switching, pay attention to the driver's physical and mental condition and remind the driver to pay attention to driving safety. Fatigue driving and drunk driving are strictly prohibited. 12.4 The vehicles configured by the fleet shall meet the requirements of simultaneous operation of at least two operation groups, and be equipped with full-time drivers. Assign a special person to manage the vehicle and check it regularly to keep it in good condition. 13 management of dangerous goods 13. 1 All items in the substation that may endanger personal safety and health are collectively referred to as dangerous goods. All kinds of dangerous goods in the substation should be kept by special personnel, and the use regulations should be formulated, and the special personnel should be responsible for supervising the use. 13.2 all kinds of combustible gases and oils shall be kept in a unified way according to the requirements of product storage regulations, and shall not be stored in the substation for a long time. 13.3 the waste toxic and harmful substances in the substation shall be treated according to the relevant regulations of the state environmental protection department. 14 installation and use of low-voltage leakage protector 14. 1 The power supply for all maintenance work in the station should have a special power box (box), and various low-voltage appliances that are in direct contact with the human body should be equipped with leakage protectors; Each fuse can only carry one load. 14.2 mobile low-voltage appliances and leakage protectors shall be installed on the mobile low-voltage power board. 14.3 the low-voltage leakage protector in use should be tested regularly, and the leakage protector with incorrect function should be replaced in time.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd