The specific contracting contents include all survey, design, equipment and material procurement, construction and installation, project management, equipment supervision, commissioning, acceptance, training, production handover, performance and quality assurance and general contracting of engineering quality warranty period.
Scope of work of the project owner
1. Land requisition (including demolition and compensation).
2. The location is Pingji.
3. Engineering supervision and engineering quality supervision.
4. Participate in and assist the contractor in debugging, and organize trial production and debugging.
5. Performance evaluation.
6, environmental protection, soil and water conservation, safety report evaluation.
7. Apply for project commencement, bidding and completion permit, etc.
8. Ensure the external coordination of normal engineering construction.
9. Connect external water supply and power supply lines.
10. Recruit and organize production personnel to enter the factory in advance to participate in production preparation and personnel training.
The project owner shall bear the land use fee, pre-project fee, construction management fee, construction supervision fee and pre-project consulting service fee, accounting for 8 ~ 10% of the photovoltaic power generation project. However, the specific scope of work between the contractor and the project owner depends on the specific provisions of the contract terms.