Summary of professional and technical work of senior engineers in road and bridge specialty

My name is He, male, Han nationality. I was born in Guiping, Guangxi on July 198 10. I got my bachelor's degree in civil engineering from Guangxi Institute of Technology in July 20xx and my master's degree in engineering from Wuhan University of Technology in February 20xx. I have been working in Guangxi Qinzhou Bonded Port Development and Investment Co., Ltd. and Guangxi Taiyuan Real Estate Investment Co., Ltd. since I obtained the professional technical qualification of an engineer in June 20xx, and I am responsible for the technical management of the projects, and I am the project supervision engineer of the construction unit in the joint inspection building project of Guangxi Qinzhou Bonded Port and the second and third reclamation projects of Guangxi Qinzhou Bonded Port. In the civil engineering of joint inspection facilities such as bayonet in Qinzhou Bonded Port Area, Guangxi, the liquor trading center project in Qinzhou Bonded Port Area, and the staff residential building project in the land consolidation center of the Department of Land and Resources of Guangxi Zhuang Autonomous Region, he served as the project leader of the construction unit. Over the past four years, I have worked hard to learn professional and technical knowledge and constantly strengthened my study. In the process of technical management of engineering projects, I have been doing a good job in technical management of engineering projects meticulously, strictly controlling the safety and quality management of engineering projects, being strict with myself in my work, being serious and responsible, being proactive and innovative, and constantly improving the level and quality of technical management of engineering projects.

After more than four years of project management experience, I have improved my ability to deal with various problems and organize and coordinate in the process of project management, and accumulated rich experience and knowledge in technical management, cost management and quality and safety management. Now as an engineer, I am responsible for the professional and technical work of project management.

First, the consciousness of technological innovation of serious responsibility, overall planning and active exploration.

From July 20xx to February 20xx, 12, in the civil engineering project management of joint inspection facilities such as joint inspection building and bayonet in Qinzhou Bonded Port Area, which was undertaken by Guangxi Qinzhou Bonded Port Area Investment and Development Co., Ltd., I meticulously managed the technology, strictly controlled the project quality, strictly demanded myself in my work, was serious and responsible, and constantly improved my technical management level and my own quality; Before the project construction, carefully study the contract, be familiar with the drawings, and control the whole quality process in strict accordance with the design drawings and construction specifications during the project construction.

1. At work, whether you are professional or non-professional, you should learn from your colleagues, ask questions you don't understand, constantly enrich yourself and strive to improve your work and business level. The civil engineering of joint inspection facilities in Qinzhou Bonded Port Area, such as joint inspection building and bayonet, involves many related majors. In addition to the structural knowledge of civil engineering, there are related hydropower engineering, smart card port monitoring engineering, inspection and quarantine equipment installation engineering, etc. The whole project construction is a complete system. When I did my last job, I fully considered the needs of my next job. The construction of joint inspection facilities in bonded port area, such as bayonet, has short construction period, many procedures and complicated equipment installation. If it is not enough, then in the process of construction, I constantly learn the knowledge of related majors, consult experienced engineers, and do a lot of preparatory work in advance, laying a good foundation for the comprehensive completion of the joint inspection facilities construction.

2. In the course of work, the civil works of joint inspection facilities such as bayonets in Qinzhou Bonded Port Area specifically include the construction coordination and management of thirteen single projects such as the main bayonets of No.2 Road, the inspection and monitoring center and the customs supervision room. Because the construction of bayonet and other projects involves many construction units, including civil construction units, intelligent monitoring construction units and equipment installation units. There are also many teams working, and cross-construction is frequent. In order to make the project go smoothly, we can contact the design institute, relevant government departments and other units in time to give timely answers and solutions to the construction units. In addition, we also actively communicate with construction units and teams, make overall plans, improve service awareness, and carefully coordinate on-site work.

3. Pay attention to technological innovation, give full play to the application advantages of new technologies, and serve the project management. In the civil engineering of joint inspection facilities in Qinzhou Bonded Port Area, Guangxi, facing the installation of large-scale steel structures with a span of1.20m and a height of 40m in Qinzhou Bonded Port Area, technologies such as integral prefabrication, sectional transportation, sectional splicing and synthesis, and positioning and installation of double large cranes were adopted to ensure the quality and safety of the project.

4. The joint inspection building project of Qinzhou Bonded Port Area in Guangxi won the 20xx Guangxi Quality Engineering Award and the 20xx National Luban Award.

Second, strictly control, strengthen management, and strive to improve project management capabilities.

20xx 165438+ 10 to 20xx March, I strictly implemented the national construction specifications, conscientiously implemented the company's quality and safety management policy, strengthened management, ensured the quality of the project, ensured that no major quality and safety accidents occurred in the project, and successfully completed various management objectives.

1, strengthen the management of the early stage of the project and the project site.

There is a lot of preliminary work for construction projects, which is very important. Before the project started, I successfully completed the project planning permit and construction permit as required, which laid the foundation for the timely start of the project.

After the project started, the project site management became the focus of management. In order to carry out the work better, I insisted on going deep into the site, carefully consulting relevant technical data, being familiar with the construction drawings, analyzing the key points and difficulties of the project, and making full preparations and objective predictions for the implementation of the project. In the process of project management, the management methods of "three controls (time limit control, quality control and cost control), two controls (contract and data management) and one coordination (coordination among contractors)" were strictly implemented, and effective management measures were formulated, which overcame difficulties such as typhoons and rainstorms in August and September, insufficient investment by construction units and poor supervision, and successfully completed the established project work.

2. Formulate and improve the on-site project management system.

In order to complete the project management according to the target, I require all participating units of the project to formulate the project schedule, formulate management rules and regulations, improve preventive measures, clarify post responsibilities, and improve the regular meeting assessment mechanism to provide guarantee for project management. In the process of management, weekly meeting, monthly meeting and project assessment mechanism are implemented. Each participating project team will hold a monthly meeting at the end of each month, mainly to summarize the completion of last month's work objectives and jointly formulate next month's work objectives. In order to ensure the realization of monthly work objectives, the monthly work plan is decomposed into weekly work plans, and the completion of project objectives is tracked and monitored in the form of weekly meetings.

Through these management systems, it is found in the process of implementation that there is always a gap between the planned objectives and the overall realization, mainly for several reasons. First, individual control nodes are not considerate when making plans or adjusting plans, and are not sensitive and forward-looking enough for possible problems in plan operation; Second, the impact of objective factors such as rainstorm season and bad weather environment, especially the typhoon in September; Third, unfavorable factors such as more designs increase the difficulty of plan implementation; Fourth, the construction unit is poorly organized, the labor force is insufficient, the discipline is slack, the on-site management is not in place, and the plan is not implemented; Fifth, the materials and equipment entering the site are affected by many factors, such as testing time and site protection. Faced with the existing problems and reasons, I organized the participating units to have a special discussion on each problem. Through the discussion at the meeting, the problems existing in the plan were comprehensively sorted out, and the corresponding adjustment methods and ideas were put forward to ensure the smooth progress of the project.

3. Pay attention to the role of contract in project management.

The construction project contract plays a very important role in the concrete implementation of the project, which comprehensively stipulates the rights, obligations and responsibilities of all parties involved in the survey, design, construction and supervision of the project. In the concrete implementation process of engineering construction, I carefully studied the contract, strictly abided by the contract, and well implemented the system of quality responsibility, demarcation, procurement of materials and equipment, drawing design, and recognition and approval of process use stipulated in the contract. By studying the problems related to the contract execution raised by all parties, the solutions to the problems related to the project progress are put forward in time and implemented by the supervision engineer. When necessary, adjust the construction means, construction resources, construction organization and contract period.

4, strengthen the basic management, the safety work as the top priority.

In the whole project management process, I strengthen management from the system and implement the work, especially the safety work, which is a key point of my work. Fully realize that the responsibility of safety work is more important than Mount Tai, always put safety work in the first place, emphasize the implementation of the policy of "safety first, prevention first", and improve the safety awareness of personnel of all participating units.

In the safe and civilized construction management of this project, I mainly carry out it from several aspects. 1. I make scientific planning and arrangement with the construction unit, rationally allocate and use the on-site construction site to ensure a harmonious environment, and require the construction unit to carry out construction in accordance with safe, civilized and standardized construction sites; The second is to urge the supervision engineer to do a good job in safety control, focus on preventing dangerous sources, strengthen inspection and rectification, and ensure the safe implementation of the project construction; The third is to urge the supervision engineer and the construction unit to make the construction site and temporary land area orderly, civilized and safe, the environment is protected, the traffic is smooth, the fire-fighting facilities are complete, and the site capacity and environmental sanitation meet the requirements; The fourth is to coordinate the relationship between the site construction unit, the supervision unit and the surrounding units to create a good internal and external environment for the project construction.

Through a series of measures, the safety management of the project was ensured, which laid a solid foundation for the timely completion of the project. So far, there has been no safety accident in this project.

5, strict quality management, the implementation of QC management methods.

Fully implement the quality management policy, focus on controlling sub-projects and implement QC management. Responsible for the project of wine trading center in Qinzhou Bonded Port Area, Guangxi, organized and set up a QC team to ensure the quality of thermal insulation outside the warehouse, and served as the deputy head of the QC team. Through the implementation of technical measures, the external insulation construction quality of the whole warehouse has achieved good results. This achievement also won the third prize of Guangxi Engineering Construction 20xx Excellent QC Group.

Third, strengthen learning, be good at summing up and constantly improve the level of business management.

20xx Since March, I have worked in Guangxi Taiyuan Real Estate Investment Co., Ltd. as the manager of the engineering department, mainly responsible for the comprehensive engineering and technical management of the staff residential building project of the Land Consolidation Center of the Department of Land and Resources of Guangxi Zhuang Autonomous Region. As the manager of the engineering department, I feel the importance of learning new knowledge, not only to master the knowledge of engineering technology management, but also to understand the knowledge of engineering economy and engineering finance. To this end, during my tenure as an engineer, I participated in the study and training organized by relevant departments and obtained the advanced project management division certificate (national vocational qualification level 1); Through my own efforts, I studied for a master's degree on the job and successfully obtained a master's degree in architectural and civil engineering from Wuhan University of Technology. In the process of continuous learning, I have always maintained a strong thirst for knowledge, and my professional and technical level has been continuously improved.

1, focusing on quality control and doing all kinds of control in an all-round way.

Quality control is the focus of project management, especially the prevention and control of common quality defects should be strictly controlled. I pay attention to this point in project management and set out to do the following work. First, I actively cooperate with the preliminary work of the project design and actively put forward reasonable suggestions; Second, do a good job of internal drawing review and the blue prints.the design, and find and solve problems in design in time; Third, do a good job in the preparation of the project management plan. According to the project situation, prepare the project management plan, management objectives and control priorities before the project starts; Fourth, carefully review the construction organization design of the construction unit and the supervision plan and implementation details of the supervision unit to ensure the pertinence of the construction plan and supervision plan; Fifth, do a good job in positioning and line inspection management; Sixth, establish a system of acceptance of materials entering the site, and resolutely prohibit the use of unqualified materials; Seventh, implement the model system of partial projects, and each partial project must pass the model acceptance organized by the supervision unit, the construction unit and the construction unit before it can be fully launched; Eighth, do a good job in the acceptance control of sub-projects during project construction. If the partial project is unqualified, the next working procedure is not allowed to start; Nine, according to the progress of the project, organize internal engineering quality inspection and evaluation and joint investigation of the project, reward the excellent and punish the poor, and fully mobilize the enthusiasm of the construction unit; Tenth, in view of the common quality defects, the control requirements for common quality defects are issued before construction, and the construction unit and supervision unit are required to formulate special control schemes according to the engineering conditions and strictly supervise them during construction.

2, to strengthen the progress management as the main measure, comprehensively promote the progress of the project.

I carefully organized the preparation of the schedule control plan before the project started, and asked the construction unit to submit the schedule control plan not later than the company's schedule control plan; In the process of construction, the plan is divided into monthly plan and weekly plan, and the implementation of the construction unit is strictly supervised. During the implementation of the plan, it is necessary to improve foresight, predict the factors affecting the project progress in time, and propose solutions in time. When the construction progress lags behind the project plan, the construction unit is required to specify a catch-up plan to ensure the realization of the schedule control plan.

3, do a good job in safety and civilized construction management, and comprehensively improve the level of civilized construction.

Safe and civilized construction is the embodiment of project management level, and I require that all started projects must meet the standards of safe and civilized construction sites. Before the project starts, the construction unit is required to report the special plan for safe and civilized construction, and organize a construction site inspection every half month. If the project does not meet the requirements, the construction unit must rectify it. Organize a safety and civilized construction inspection once a month, and punish those who do not meet the requirements in strict accordance with the contract.

4. Strictly control the cost to make the project cost controllable.

For cost control, I will actively participate in the project budget preparation stage, and strive for the accuracy of the project budget according to the project characteristics and project positioning combined with the previous project cost; After the project starts, we should fully study and understand the terms of the contract, be familiar with the contract and strictly abide by it; During the construction process, carry out site visa and design changes in strict accordance with the company system, and regularly review the site visa and design changes; At the same time, when the site visa and design changes occur, the engineering administrator shall be notified to arrive at the site in time; At the time of completion acceptance, the settlement personnel shall be organized to participate and the quantities shall be carefully checked.

5. Seriously implement the contract management system.

In each contract approval process of project management, the engineering department should carefully review the technical requirements and fully consider the quality standards and time limit for a project; After the contract is signed, the contract shall be disclosed to the management personnel of the engineering department, so that the project management personnel can fully understand the contents of the contract; In the process of contract execution, supplier evaluation should be organized in time to grasp the performance of the contract in time and avoid contract claims.

7. Do a good job in information management.

For the information communication with all contractors, it is necessary to establish a written form, and the information exchange of major events in the middle should be registered in detail, and ledgers and documents should be established to prepare for the performance evaluation of the contract and avoid contract disputes. In the process of project construction, the data should be synchronized with the engineering entity, and the construction data and supervision data should be checked regularly every week.

Four, there are shortcomings, dare to improve, and promote the all-round development of management level.

1, the communication mechanism is not perfect and resources are not fully utilized.

In the process of work, due to the single and incomplete major, I can't take the initiative to ask other colleagues for advice, which leads to reduced work efficiency or even mistakes, and I can't make full use of superior resources. In the future work, I will take the initiative to strengthen communication with colleagues in other departments and strive to achieve "more coordination and more communication"; "Plan early, arrange early"; "Active learning", through the company's platform to improve their business level.

2. The work plan is not detailed and lacks practical guiding significance.

In the process of work, especially in the construction stage of project construction, because the work plan is not detailed enough, the purpose of work is not clear enough, and the contradiction between primary and secondary is unclear, it is often half the effort. In the future work process, I will make a work plan carefully, strengthen the understanding of the purpose, distinguish between primary and secondary contradictions, further improve and refine the work plan and work objectives, and make the project management more smooth and efficient. Clarify their respective responsibilities, strive to achieve upload and release, unity and cooperation, standardization and order, and more effectively promote the smooth development of their respective work.

3. The professional skills are not comprehensive, and the learning ability needs to be improved.

As a modern talent, he should be versatile, and such talents meet the needs of the times and the company. My professional scope is narrow, and I don't understand other majors such as business planning, which limits my own development. In the future work process, I will strengthen the study of other majors, make full use of company and social resources, improve subjective initiative, and strive to become a versatile compound talent.

The above is a summary of my main technical work in recent years. Through years of hard work, I have accumulated rich experience, made some achievements, and made some gains and progress. At the same time, there are also shortcomings, and experience and lessons go hand in hand. In the future work, I will continue to learn and improve according to my own work characteristics, establish new ideas, be pragmatic, play more roles in my work and do my work better.

All the application materials submitted by me are true and valid, otherwise, I am willing to bear the corresponding responsibilities according to law.