Unit type: two rooms and two halls
Building area: 104
Use area: 80
Decoration budget: 9W for hard decoration
Mode of contract: less than half contract
Decoration company fee: 3.5W
Style: concise and warm-hearted
Decoration company: Yuan Bing.
Designer: He
Supervision: Zhou Supervision
Construction Team: Team Leader Cui
Commencement date: July 20, 2009
Lianlian Yuan Bing Decoration Model House Experts
Renovation progress:
On May 24th, I participated in a free visit to a model house organized by Shangtuan.com, and made a decision on the spot.
At the end of May, I introduced two companies to my friends through the last tour. Then I went to negotiate.
On June 14, we finally decided to choose Yuan Bing and sign the design contract.
The construction contract was signed on July 5.
School officially started on July 20th.
On July 23, the wires came into the site and the wiring was excavated.
On July 27th, water pipes were installed.
Water and electricity acceptance in August 1
Finish carpentry on August 25th.
On August 28th, the painter entered the scene.
September 1, bricklayers began to lay floor tiles.
Paint the wall on September 23rd.
On September 27th, bricklayers and carpenters accepted.
Click to participate in the activity and visit the model house for free.
Graduation day
On the day of commencement, Mr. Peng came to my house with He Design, Director Zhou and Captain Cui for on-site disclosure. Manager Peng is very punctual. Even if the road is blocked, he still waits for us in the community first.
From the initial contact with decoration to the start of construction, I have been very satisfied with General Manager Peng's way of doing things. He is considerate and practical, and has solved many problems we were worried about before, and patiently and meticulously discussed and explained the apartment type and budget with our family. Let me feel confused about decorating the house and gradually gain confidence.
Knocking on the wall in the early stage, hydropower positioning
Xiao Cui, the captain of the construction team, is in his thirties. He has been engaged in decoration for more than ten years. He did things carefully and neatly, and spent a day knocking on the wall. He gave us a lot of advice when wiring the switch according to the construction drawing, and he was very capable. Our family is very satisfied with this captain.
Hydropower engineering
Water pipe installation
There are many water pipe shops in the market, each of which claims to be genuine, which brings difficulties to many students when choosing. I bought the "Tian Li" water pipe from Shanghai Groupon. My friend's house is a water pipe shop. He told me that the best is of course the Pirsa water pipe made in Turkey, but the price is also high. Tian Li made in Shanghai uses the same materials, that is, one is processed in Shanghai and the other is processed in Turkey, which can save a lot in price and installation cost.
Building materials shopping mall Tian Li conduit
Wall and floor tiles are all bought in Asia, and also bought by Shanghai Group Buying Network. The floor price difference is 600*600.
Building materials shopping mall Yaxiya tile
Terrace window
In response to the typhoon, the master of Dikai balcony window came to install it yesterday and ordered a well-known Dikai on the Shanghai group purchase website. It was measured at the end of July and officially installed yesterday.
Because of the slight deviation in the size of the site, the window of the small balcony was installed first, and the window of the large balcony continued to be installed at 9: 00 this morning.
Give some suggestions to the netizens who decorate Rilong. My balcony is a little curved. If you make a hot bend-that is, the curvature of the glass is 280 square meters, it is 180, that is, 100.
I'm a straight man, so it's ok to use a post to recess an angled interface where you need to bend. When installing, I observed the windows of other owners in the next community. There are not many hot bends, so save it if you can!
Dikai doors and windows and sun room Dikai doors and windows and sun room Dikai doors and windows and sun room Dikai doors and windows and sun room
Remind you that Rilong decoration users:
Acceptance after installation (root cause eliminated, no residual disease)
First, the installation acceptance should be based on whether the selected aluminum material is qualified.
Second, check whether the hardware is flexible. The lower part of the push-pull window frame should have an aluminum slide rail for easy replacement. The sealing strip of casement window should be freely replaceable.
Third, the protective film must be removed after installation, otherwise it will reduce the service life of doors and windows.
Solid wood flooring
Set of "Hefeng Floor" borneol incense, unit price 152, solid wood skirting line 20 yuan/meter. It was a big deal when it was on sale before. After shopping around, I still think this one is more in line with our needs, so I decided. The color was a little dark, so I found a similar picture and sent it up.
Ou Lin shuicao
OLY202' s bucket and sink are big and easy to use.
Building materials mall Ou Lin sink Ou Lin sink Ou Lin sink Ou Lin sink Ou Lin sink
cloakroom
There is a small storage room next to the master bedroom. After the designer's design, the wall was removed and connected to the master bedroom. There is a walk-in cloakroom with a length of 2m 1 and a width of 1m 7. Awesome! You can hang your clothes as you like.
I have been doing activities in Hauser wardrobe recently, so I decided.
The sliding door is also set for his wave sliding door. This color is called Brazilian style, which is a little dark coffee.
Building materials shopping mall Shi Hao sliding door/wardrobe
The tiles on the kitchen wall are almost pasted, and the effect is good. I bought it from Wells, a group-buying network in Shanghai, and it was Guangfang.
Building materials shopping mall weiersi tile
Toilet tiles, light yellow tiles, from Asia.
Building materials shopping mall Yaxiya tile
I bought 16 tiles at the back of the toilet and laid two rows. After laying, the effect is not bad.
Kitchen fruit wall brick
The photos of foreman Cui after tearing down the new house have begun to take shape.
The last group learned a lot, and the design should be adjusted according to the actual operation. Now I'm making the ceiling. Some gypsum boards are prone to crack at the joints of the top beams, so I have to wrap them all up, or let the workers approve them first, and then paste them with gauze for the second time when the painters come in to approve the walls. This is more beautiful and more importantly practical.
Woodworking is done in the closet.
There are many things at home these two days, and carpentry is fine. Masons are laying floor tiles and sending pictures of wardrobes entering the door. Below are shoes, clothes and things hanging on them.
Generally, when decorating, let the decoration company make cabinets, which can't be bought outside. It is especially important to note that the shoe cabinet should be set aside with high squares and put on boots for the wife.
The dome of the master bedroom has also been hung, and the effect is good. They are all E 1 grade Chinese fir integrated boards.
The bay window is also very beautiful. Marble is paved with new Shana, and the effect is good. Unfortunately, it was taken with a mobile phone. I don't know.
And the small ceiling derived from it. Decorated, get a cushion to sit on, drink coffee, and look out of the window, as if you were out of the world.
lamps and lanterns
I visited the furniture market on weekends, selected lamps and ordered a dining room lamp and a bedroom ceiling lamp. The lamp is purple and long, with a long dining table for six people and a light blue wall.
I've seen several ceiling lamps in the guest room, but I still think they look good, with detailed style and taste.
Wall bandage
Painters should put gauze and bandages on all cracks and joints before painting walls. Our painter Xiao Chai works steadily and meticulously!
whitewash a wall
When the room was painted for the first time, the ceiling and roof were all white after painting, which was very different from that before painting powder, and the feeling in the hall came out. It's a step closer to completion, and the health work on site is also good. I am looking forward to the effect after painting!
Kitchen & bath electrical appliances
Forest+exhaust+gas stove+yuba+sink
All the kitchen appliances ordered last Sunday were delivered home, and I called the water heater in the forest for workers to install. The ingredients cost about 100, which went well!
Building materials shopping mall linnei water heater
The carpentry in the bar has been completed.
It was ready before carpentry. After a week's visit, the supervisor suggested that the board on the bar was too narrow and should be widened, otherwise the marble table on it would be unstable, so it should be carefully considered. After the floor tiles are laid, the carpenter will come back to repair them.
The last order of Dulux paint was delivered home. The painter Xiao Chai is honest and practical. Before buying paint, he checked the specific quantity with me. There are many colors used at home. Plus white * * * There are five colors, dark blue and dark yellow. Because it is a dark series, people who buy paint take special care of it. You can't add water when you brush, and the price is more expensive than ordinary paint.
One ***9 cans of 5 liters, two cans 1 liter.
Building materials shopping mall dulux
Hall floor tile
The hall used 600*600 floor tiles, and the paving effect was very good. Master Wang, a mason, fought for several days and finally finished!
The skirting line is also done. My baseboard is the same as a floor tile. Don't spread the door cover first, it's empty, and then spread it when the door cover is ready, otherwise the size is not well grasped, and there is a gap in the middle, which will be ugly. Remember the order when installing.
Pave the floor of the room first-install the door cover (if the skirting line of the floor is bought from the manufacturer of the floor, also leave a piece from the position of the door cover, and then install it after installing the door cover)-pave the marble skirting line of the hall.
The highlight of my family, the TV cabinet with unique shape, finally made a gorgeous appearance.
It used to be fixed with film, but now everything it supports has been removed, just waiting for the painter to paint.
The bar is in place.
A custom-made acrylic bar table has been installed, with acrylic content of 15%, white shading and white dots on it. Nice shape.
Bay window, shoe cabinet door panel and bar have all been sent home. The handle of the shoe cabinet is embedded and has lines, which looks very nice.
Wall grinding
There will always be some minor problems in the decoration. My family had a smooth journey, but the bricklayer's progress was a little slow, which led to the delay of the whole project. The craft was good. It has been unanimously recognized by the family, and it is slow to work hard. Now that the plasterer is finally well, the painter has begun to paint. Xiaochai, a conscientious and meticulous painter, is polishing the wall with a searchlight in one hand and sand skin in the other.
Dulux coating material family mart fu
Building materials shopping mall dulux
Start perfusion. Xiaochai put a circle of adhesive tape on the baseboard to prevent the paint from falling and splashing elsewhere. Not sloppy at all.
The effect is not bad, is it
The painter Xiao Chai has painted all the pigments.
Customized doors purchased through Yuan Bing were also sent for installation, including bars, shoe cabinets and bay windows. The background wall behind the bar is dark yellow, which is very emotional.
The bay window is turned over, so it is equipped with a hidden handle made of aluminum alloy.
The height of the left and right hidden handles at the door of the shoe cabinet is wrong, with a deviation of 4 cm. At that time, director Zhou made the second acceptance settlement in my home, and immediately pointed out to the workers that the manufacturer had to modify it before installing it.
shoe cabinet
Masonry and woodworking acceptance
Finally, the final acceptance settlement was made. Because the bricklayer's progress was a little slow before, coupled with problems such as rework and replenishment, the whole progress was affected. Teacher Peng also communicated with me. There are some reasons for this, but fortunately, my house is not in a hurry to move in, and the quality of bricklaying skills of workers is really good. I said that the supervisor came to my house early on Saturday and had detailed acceptance work, which was understandable.
One: The supervisor Zhou took out a metal stick and beat every tile to see if there was any hollowing, and his work attitude was meticulous.
Two: I found that the edge seam of the paint on the skirting line was not straightened, so I helped clean it up on the spot. I also said that the next time the painter came to repair it, he would supervise it on the spot and let him do a good job.
Three: Work with me to measure and record the woodworkers, pendants, lamp slots and other parts at home, and always remind us of some details and future maintenance problems.
Four: Some problems found in the whole acceptance process are written on the acceptance sheet one by one, which is convenient for workers to maintain in the future, and records are made as evidence for future maintenance.
Yuba, please ask Op workers to install it.
Building materials shopping mall aopu
Fry the door cover and install the door cover.
Installing door cover
After the door cover is completed, let the floor manufacturer install the baseboard.
Curtain racks have been installed, all of which are monorails.
The master bedroom uses a straight track.
I bought a clothes hanger and the rocker was equipped with a gear. Compared with several, it is found that it is less stressed and more durable when rotating.
Building materials shopping mall drying rack
Cabinet method
The installation master of the cabinet came and installed it from 9 am to 6 pm. It was a wine red cabinet.
Water heater cabinet with drain hole
Artificial stone countertops, scattered when brought, spliced on site. There is a lot of dust on the countertop, and the master wears a mask, which is very professional.
The feet under the cabinet were also installed on site, but after the cabinet was completed, the master was asked to install the sink, gas and exhaust, which were all small tasks of splicing and soon installed.
The doors of the kitchen and bathroom are all Xinhui door industry. The bathroom is very beautiful and can dance, sand mold, 240/ square. The kitchen uses the full version of Four Seasons Rainbow 180/ square.
Painted wall
Owner's experience: I thought I met the ice sheet in the activity of looking at the model house on Shanghai Group Buying Network, and now it has become a model house. I hope more netizens can find a suitable decoration company by looking at the model houses.
Bian Xiao concluded: Shanghai Group Buying Network visits the model houses for free in each issue, and provides professional lecturers to explain to netizens. Model houses are very useful for netizens who are ready to decorate. They can not only learn from experience, but also appreciate regrets. They can not only see the overall effect of the space after completion, but also get some ideas suitable for their own homes. I hope netizens can take part in the last group's activities and share the story of your's decoration with you!
Activities: Free visit to model houses.
Activity: Free apartment design.