Project management goal and merit planning of drainage pumping station
1 time limit for a project target:
Complete this project in 6 calendar months. That is, the project started on June 30th, 2000+10/October 1, and was completed on June 30th, 2010.
2 quality objectives:
The first acceptance rate of the unit project is 100%, and the excellent rate is over 80%, striving for high-quality projects.
3 security objectives:
Conscientiously implement the construction safety and rules and regulations, and put an end to accidents of death in the line of duty; Put an end to major traffic, machine damage, fire, drowning and falling accidents.
4. Excellence plan:
4. 1 Firmly establish the guiding ideology of "quality for the centenary" and strengthen the quality awareness of all staff, with a high starting point and strict requirements. The first acceptance rate of the project reaches 100% and the excellent rate reaches over 80%.
4.2 Put forward a clear goal of creating excellence and set up a leading group for creating excellence. The team leader shall be the project manager, the deputy team leader shall be the technical director and the deputy project manager, and the members shall be the managers of the project management department.
4.3 Establish the responsibility system for creating excellence, strengthen the management, supervision, inspection and reward and punishment mechanism of creating excellence projects, and implement the system of inspection, assessment and appraisal step by step according to the principle of vertical to the end, horizontal to the edge and responsibility to people, rewarding the excellent and punishing the poor, and strengthening management.
4.4 Strengthen the basic work of technical management, seriously implement the "three inspections" and strictly control the "five customs" during construction. "Three inspections" refers to the inspections before, during and after construction; "Five passes" include technical drawing review, measurement review, technical disclosure, engineering test and concealed engineering inspection and visa.
4.5 Strengthen the strict implementation of technical specifications, quantitatively evaluate engineering entities with engineering tests and related test results, and obey the quality supervision of supervision engineers and government quality inspectors.
4.6 Carry out technical research on key and difficult projects and mass QC group activities, standardize operations through process control and process control, put an end to all kinds of common quality defects, eliminate weak links in operations, and achieve the goal of creating excellence as planned.