Is there a relationship between consulting design and engineering cost specialty?

Yes Different construction stages have different effects on the project cost. Consulting design is related to engineering cost specialty, and the influence of design stage on engineering cost is far greater than that of project implementation stage. Researchers believe that the project cost is only an estimate and estimate in the design institute, and the quality and accuracy are not high, so the status of the project cost specialty in the design industry is low and the development of the specialty is too slow.