1. When signing the contract, it was said that the company had trainers, the project was scheduled, and every step had a process. As a matter of fact, all the workers were randomly found by the engineering manager in the market. Workers have no training and are arranged by the engineering manager. Every step of the process can not be carried out in place, because a decoration can not really monitor the following project managers and workers, nor can it be seen from time to time. All kinds of bad processes in the middle, the last project acceptance. The person being inspected is a decoration, not a third party. You know, as long as the inspection passes, the project is over. Will it fail?
2. The progress is mixed and there is no installation. It was all arranged by the engineering manager. As a result, the engineering manager arranged the construction when he found the workers, but it was empty when he didn't find them. On the other hand, all their engineering materials need to be customized, and the process of taking the company is particularly slow. It takes three to five working days to get a tile casually. I installed a door, waited for a month and said that the door was wrong, and then continued to wait. All the items have been consumed.
3, the material is very poor, there is no choice of materials, the choice of washbasin means that the faucet and flowers are scattered, and the toilet is tied. This floor is for engineering. The skin thickness of icon floor is much thinner than that bought outside. But it looks good.
4. There are many routines. When calculating the area, add the purchased area and what external wall to add. Then say how much it costs, the price is too high. Looks like the balcony has to be counted.
5, the quality of the project is not flattering, the brush is waterproof, and you can see the color of the bottom wall after brushing twice.
6. The project site is a mess, and people can't get in at all.