1. Ensure the cleanliness and maintenance of the cold core machine and ensure that the equipment is in good working condition. Prepare new mold design drawings and related technical documents.
2, according to the product geometry and size requirements, design the mold drawings. Consider the material selection of the mold, the design of the cooling system, the demoulding mode and other factors.
3. Submit the design drawings to professional mold manufacturers for mold processing and manufacturing. The manufacturing process will include cutting, grinding, heat treatment and other processes.
4. After receiving the mold, make a detailed inspection to ensure that the mold quality meets the requirements. Check the dimensional accuracy, surface quality and damage of the mold.
5. Install the mold on the machine according to the instructions and operating procedures of the cold core machine. Ensure the accurate positioning of the mold and good cooperation with the machine.