Party B (supplier): _ _ _ _ _ _ Tel: _ _ _ _ _ _ _
Party A and Party B shall, according to the bidding results of _ _ _ _ _ _ _ _ _
Article 1 Contents and transaction price of goods purchased by Party A: (unit: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Project Name, Specification, Model, Quality Standard _ Quantity, Transaction Price (RMB) _ Total (in words) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 2 Quality and technical standards of articles, after-sales service of Party B and damages.
1. The quality and technical standards of the goods shall be implemented in accordance with the standards stipulated by national laws and regulations, the technical standards required by the bidding documents and Party B's bidding documents.
2. Ensure that it is the original product produced in the country of origin, otherwise it will be treated as a return.
3. During the free warranty period, if there are more than three failures due to quality problems, our company is responsible for replacing similar new products.
4. Party B shall provide free warranty and other services according to the manufacturer's warranty provisions and service commitments specified in the bidding documents, with a free warranty period of _ _ _ _ _ _; However, normal and reasonable losses shall be borne by Party A. ..
5. Under normal use, the goods are guaranteed to have a service life of _ _ _ _ _ _ years.
6. Response time of Party B's after-sales service: _ _ _ _ _ _. Otherwise, Party A can organize maintenance by itself, and the expenses shall be borne by Party B, which can be deducted from the payment for goods and other funds payable to Party B. ..
7. If Party A suffers losses due to the quality problems of Party B's goods, Party B shall compensate it.
Article 3 Delivery and Acceptance
1. Delivery time: _ _ _ _ _ _; Delivery place: _ _ _ _ _ _.
2. Party B is responsible for the transportation, installation, debugging and operation training of the goods until the goods can be used normally and the operators can operate skillfully; Be responsible for providing the Chinese instruction manual, Chinese user manual, Chinese maintenance manual and circuit schematic diagram of the goods, and bear all expenses arising therefrom.
3. Acceptance time: Party A must organize the acceptance within _ _ working days after Party B submits the acceptance application. After the acceptance, Party A shall issue an acceptance report.
4. Acceptance criteria: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1. Complete certificates: product certificate (or quality certificate), instruction manual, warranty, invoice and other necessary certificates are required;
2. The quality meets the requirements of national laws and regulations, bidding documents and bidding documents.
Article 4 Payment settlement
1. Settlement basis: purchase contract, sales invoice of Party B and acceptance report of Party A.
2. Settlement method: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 5 Party B's liability for breach of contract
1. If Party B fails to deliver the goods, Party A will not pay Party B. Party B shall pay Party A the liquidated damages equivalent to 10% of the undelivered part;
2. If the variety, quantity, specification and quality of the goods delivered by Party B do not conform to the national laws and regulations and the provisions of this contract, Party B shall be responsible for repairing, replacing or returning the goods, and bear the actual expenses arising therefrom;
3. If Party B fails to deliver the goods on time, it shall pay 0.5 ‰ of the liquidated damages to Party A every day on the basis of the overdue payment, and bear the losses suffered by Party A as a result.
Article 6 Party A's liability for breach of contract
1. If Party A delays payment, it shall pay Party B a penalty of 0.5 ‰ per day;
2. If Party A refuses to accept the goods in violation of the contract, it shall bear the losses caused to Party B. ..
Article 7 Force Majeure
If either party is unable to perform the contract due to force majeure, it shall promptly notify the other party of the reasons for its inability to perform or its inability to fully perform, so as to reduce the possible losses suffered by the other party. After obtaining the certificate from the relevant authorities, it is allowed to postpone, partially perform or not perform the contract, and may be exempted from the liability for breach of contract in part or in whole according to the circumstances.
Article 8 Settlement of disputes
1. In case of any dispute over the quality of goods, the technical unit designated by laws and relevant regulations shall conduct quality appraisal, and both parties shall unconditionally obey the appraisal conclusion;
2. Any dispute arising from the execution of this contract shall be settled by both parties through consultation in time. If negotiation fails, either party may bring a lawsuit to the people's court where the contract is signed.
Article 9 Supervision and management
1. After the conclusion of the contract, if both parties need to change the substantive terms of the contract or conclude a supplementary contract through consultation, they should first obtain the consent of the government procurement supervision and management department and submit it for the record.
2. Party A and Party B shall consciously cooperate with the relevant supervision and management departments to supervise and inspect the performance of the contract, truthfully reflect the situation and provide relevant information; Otherwise, the relevant units and parties will be punished in accordance with relevant regulations.
Article 10 Invalid contracts
If Party A and Party B are declared invalid for violating the provisions of the Government Procurement Law and relevant laws and regulations, all responsibilities shall be borne by the party at fault.
Article 11 Supplementary Provisions
1, _ _ _ _ _ _ _ _ _ _ tender documents, bid-winning notice, Party B's tender documents and clarification documents are integral parts of this contract, and both parties must fully abide by them. If there is any violation, it shall be liable for breach of contract.
2. This contract is made in triplicate, with Party A, Party B and _ _ _ _ _ _ _ each holding one copy.
3. This contract shall come into effect as of the date of signing.
Purchasing unit (Party A): _ _ _ _ Supplier (Party B): _ _ _ _ _ _
Legal representative: _ _ _ _ _ _ _ Legal representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Authorized Agent: _ _ _ _ _ _ _ Authorized Agent: _ _ _ _ _ _ _ _
Bank of deposit: _ _ _ _ _ _ _ Bank of deposit: _ _ _ _ _ _ _
Account number: _ _ _ _ _ _ _ _ _ _ _ Account number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Tel: _ _ _ _ _ _ Tel: _ _ _ _ _ _ _ _
Signing address: _ _ _ _ _ _ _ _ _ _ _
Signing time: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _