Summary of personal work in annual water conservancy examination form

Summary of personal work in annual water conservancy examination form

Time flies, and a period of work has come to an end. I believe that everyone has gained a lot since this time. I think you need to write a work summary. How should I write a work summary? The following is my personal work summary in the annual water conservancy examination form, hoping to help everyone.

Summary of Personal Work in Annual Assessment Form of Water Conservancy 1 1. Development of Water Conservancy Management

In recent years, we have adhered to the guiding ideology of "scientific planning, water control according to law and standardized management" and actively explored the development mechanism of "self-maintenance and self-development" in accordance with the working objectives of "improving management level, improving service quality and improving operation efficiency", and achieved certain results in water conservancy construction.

(a), adhere to the construction management, ensure the safe operation of the project.

Most of the water conservancy projects in Gubai Town were built in 1960s and 1970s. With low construction standards and long operation time, most of the original projects have become problem reservoirs. In addition, the canal system is not matched, the standard is low, and irrigation efficiency is not big. After on-the-spot investigation, under the leadership of the government and the Water Conservancy Bureau, work was actively carried out, scientific planning and careful construction were carried out. In recent years, the investment in reservoir construction has increased year by year, and the construction of reservoir reinforcement project has provided favorable conditions for improving the present situation of reservoir. In recent years, the two reservoirs have been rebuilt, which can basically guarantee the tasks of flood control in summer and drought prevention in winter. The renovation of 28 Sanpingtang has also been completed. According to preliminary estimation, nearly 1,000 mu of farmland can be effectively irrigated.

In 2006 and 2007, nearly 13 kilometers of canals were repaired and built, which greatly improved the canal coverage in Gubai Township. At the same time of project construction, we began to consider the management of reservoir projects. In order to fully mobilize the enthusiasm of villagers in various water conservancy areas, we have formulated detailed management methods, and paid special attention to village cadres, so that they can patiently and meticulously do the ideological work of villagers in water conservancy management and realize the importance of water conservancy construction. Strengthen publicity, control water according to law and create a good working environment. On the one hand, strengthen the publicity of water laws and regulations, educate the masses to put safety first and protect water conservancy projects; On the other hand, strengthen law enforcement, stop and seriously deal with violations in time; At the same time, win the support of leaders at all levels and local village cadres to help coordinate and handle local contradictions. After long-term and meticulous work, the management environment has been greatly improved. Especially through demarcation, the scope of reservoir management has been clarified, water management units have legal management rights, and the external conditions of reservoir management have been completely improved. And establish a "self-sufficiency, self-sufficiency" operation mechanism. We make full use of surface resources, vigorously develop water conservancy and fisheries, and strive to improve operating efficiency and income-generating capacity.

(2) Make full use of tap water resources and strive to improve operational efficiency.

In the tap water project, after the overall consideration of the government and the Water Conservancy Bureau, we actively explored a new mode of tap water management in villages and towns, and revitalized water resources through the combination of individual contracting and water pipe station management, which truly achieved effective utilization and management. Since I became the stationmaster of the water pipe station, the number of tap water users in Gubai Township has gradually expanded from less than 200 to more than 400. We fully tap the potential and rationally develop and utilize water resources. This new mechanism to speed up the reform of water conservancy investment and financing system has broadened the channels of water conservancy construction funds, actively supported the combination of individual contracting and water management stations, and further broadened the channels of township water conservancy development.

I am in my thirties, healthy, energetic and enterprising, and I can devote myself wholeheartedly to the work I love. So I am also full of hope for my future work.

Second, the future work plan

1, strengthen study, actively do daily work, and strive to improve service quality. Only by constantly strengthening the study of various management systems and related business knowledge of water management units and constantly enriching themselves can we be competent for the post requirements. The personnel of the water pipe station should be responsible for implementing the policy and communicating internally and externally. At the same time, plumbing work is actually a service work. Therefore, the plumber is both glorious and hard, and needs a strong sense of professionalism and responsibility; I need to have strong working ability and work art. In addition, I will strengthen the cultivation of party spirit, obey the arrangement, match words with deeds, take the overall situation into account, resolutely safeguard the unity of the leading group and maintain the image of the leader. At the same time, give full play to the enthusiasm of the staff of the water pipe station, make them strive for perfection, continuously improve the service quality and do a good job in water conservancy service.

2. Be a good staff assistant and serve the decision-making of superior leaders. I will timely and accurately grasp all aspects of the work dynamics, and timely feedback all aspects of information to the leadership; And pay attention to investigation and analysis, take the initiative to offer suggestions, make scientific analysis and judgment on various situations, and provide reliable basis for leadership decision-making.

3. Further do a good job in flood control and drought relief. Flood control and drought relief work is a long-term and important work, which must be highly valued and unremittingly grasped. Local rainstorm and flood are inevitable every year in Yibin county, and the water storage of water conservancy projects is insufficient, so the drought may develop. It is necessary to establish ideological preparations for flood control and drought relief, further implement the responsibility system for flood control and drought relief, do a good job in the construction of the annual inspection system for reservoirs, continue to improve the flood control plan, continue to do a good job in the construction of the three-prevention command system in various places, ensure the safety of flood control, water supply and food production, safeguard people's lives and property, and minimize disaster losses.

4. Do a good job in various water conservancy work focusing on rural water conservancy. Water conservancy work should focus on serving agriculture, countryside and farmers, closely focus on the strategic deployment of building a new socialist countryside, and continuously strengthen the construction of rural water conservancy infrastructure with the goal of improving comprehensive agricultural production capacity, promoting rural economic development and increasing farmers' income. Today, we should sum up the experience and lessons, consolidate the achievements of rural drinking water, and further solve the problem of rural drinking water safety.

Summary of Personal Work in Annual Assessment Form of Water Conservancy 2 Linxian Water Conservancy Bureau has always attached great importance to the construction of political style in water conservancy system as an important measure to promote water conservancy reform and development, serve the economy and society and realize the fundamental interests of the people. In strict accordance with the requirements of the superior for xxx's political style evaluation, focusing on the goal of building a service-oriented water administrative department, focusing on people's livelihood and serving the people, insisting on paying equal attention to rectification and construction, focusing on construction. In-depth publicity and mobilization, continuous strengthening of work responsibilities, extensive solicitation of opinions and suggestions, serious search for existing problems, and practical improvement of work style, through the joint efforts of the cadres and workers in Linxian water conservancy system, xxx political style appraisal work has achieved remarkable results.

First, do a good job in the opening work and do a solid job in mobilization and deployment.

Linxian Water Conservancy Bureau has always attached great importance to the construction of water conservancy system as an important measure to promote the reform and development of water conservancy, serve the economy and society and realize the fundamental interests of the people. The general party branch of the bureau attached great importance to the evaluation of political style, acted quickly, carefully planned, and solidly publicized and launched, which made a good start.

1, study hard and make plans.

At the beginning of Linxian Water Conservancy Bureau, our bureau conducted a special study on the evaluation of xxx's political style, studied and formulated the implementation plan of xxX's political style evaluation of Linxian Water Conservancy Bureau system in XX years, and reported it to the county government's folkway evaluation office, which achieved early departure, early deployment and early arrangement, laying a good foundation for the start of the evaluation work.

2. Strengthen leadership and set up institutions.

In order to implement the assessment work, Linxian Water Conservancy Bureau set up a leading group for xxx assessment of Linxian Water Conservancy System, headed by the director and attended by other bureau leaders. The people's evaluation office was established, and five capable personnel were transferred to be responsible for the daily affairs, publicity, investigation and statistics, liaison and supervision of xxx's political style evaluation, and a monthly work plan was formulated; Implement the work responsibilities, make it clear that the main person in charge of each stock office and grass-roots unit of the county bureau is the first person in charge of people's evaluation, and divide the tasks into each leader and stock office, so as to carry out their respective duties, so that the evaluation of political ethics in water conservancy system has achieved organized leadership, specialized institutions, full-time personnel and work plans, which provides a strong organizational guarantee for the evaluation work.

3, in-depth launch, extensive publicity.

As early as March, Linxian Water Conservancy Bureau held a mobilization meeting for xxx appraisal political work style of the city's water conservancy system, and fully deployed xxx appraisal political work style. All cadres and workers of water conservancy system/kloc-more than 0/00 people attended the meeting. The meeting studied the relevant documents of cities and counties and put forward clear requirements for the evaluation of political style. On this basis, our bureau further intensified its publicity, printed leaflets on political style and set up special topics on people's evaluation information; Made a publicity board for political style, set up a suggestion box, and issued a publicity bulletin for people's evaluation, which created a good xxx atmosphere for political style evaluation.

4, careful, implement the survey object.

Linxian Water Conservancy Bureau recently, our bureau plans to hold a xxx appraisal work arrangement meeting to decompose and implement the sample task of mass satisfaction survey. Fully implement the survey objects, and initially plan 2 major projects, 40 livelihood projects and 40 clients.

Second, open the door to counseling, self-examination and self-correction.

In order to find out the shortcomings existing in the construction of political style and morals in Linxian water conservancy system, our bureau has formulated the Work Plan for Self-examination and Self-correction of xXX Political Style and Morality Evaluation in Linxian Water Conservancy System in XX, adopting various forms, broadening channels, opening the door, and earnestly carrying out self-examination and self-correction activities.

1. Send and receive letters.

Through a letter to customers, together with a letter asking for advice, it was distributed to customers, and 30 letters were sent out successively.

2. Ask in person.

Our bureau held a forum to solicit opinions on political style appraisal, and invited more than 30 assessors and clients from water conservancy law enforcement, water resources management, water and soil conservation supervision and water conservancy construction management to solicit opinions and suggestions.

3. Ask about the stall on the spot.

It is planned to set up a stall in the county square in late August. All members of the bureau and the section chief attended the activities on time, solicited opinions on the spot, answered questions, planned to distribute xx publicity materials, and accepted consultations from people from all walks of life.

4. Internal inspection.

This paper analyzes the outstanding problems existing in the internal organs of Linxian Water Conservancy Bureau in self-examination and self-correction at different levels, analyzes the causes of the problems and looks for solutions.

The Water Conservancy Bureau also hired five comrades from the Commission for Discipline Inspection, the National People's Congress, the Chinese People's Political Consultative Conference, the client and other relevant units as reviewers to participate in the evaluation of xxx's political style and accept supervision from all walks of life.

Third, strengthen responsibilities and strictly implement rectification measures.

While doing a good job in political work in xx, our bureau has carefully combed and summarized opinions and suggestions in various aspects of xx, involving water conservancy law enforcement, water conservancy publicity, team building, water conservancy construction, water conservancy management and so on. To this end, our bureau has formulated a rectification plan, designated a responsible leader and responsible unit room for each opinion and suggestion, and set a rectification time limit to ensure that every opinion and suggestion can be rectified in place.

Summary of Personal Work in Annual Assessment Form of Water Conservancy 3 (1) The reservoir project in our city has been comprehensively cultivated and developed rapidly.

First, the flood control and disaster relief work was successfully completed this year. Ensure the agricultural production and domestic water demand in the irrigation area, and effectively guarantee the normal agricultural production in the reservoir irrigation area. Second, the reservoir reinforcement has achieved remarkable results. There are 29 dangerous reservoirs in our city, of which 10 (2 large, 4 medium and 4 small) has been included in the first and second batch of dangerous reservoirs reinforcement planning in China, and 15 (1 medium and 65438+ small) is planned to be included in the third batch of dangerous reservoirs reinforcement planning invested by the central government. So far, the foundation of the first batch of dangerous reservoir reinforcement projects invested by the center has been completed.

The second batch of dangerous reservoir reinforcement projects invested by the center has been fully launched, with a total investment of 654.38+0.2 billion yuan. All the plans have been issued and the project implementation is progressing smoothly. The planned investment of Shagang Reservoir is 262 1 10,000 yuan, which has been issued, and the implementation plan is currently being prepared. The third is to cultivate some rules and regulations to further standardize. According to the principle of hierarchical management, the job responsibilities are clear, the funds are harsh, and the cultivation is standardized. Fourth, the continuous construction of reservoir irrigation areas and water-saving refresh have been steadily promoted. The supporting facilities for the continuous construction and the cultivation of the water-saving renovation project in the irrigation area of dangerous reservoirs have all been completed, with an investment of 54.4 million yuan, and the action measures of the irrigation area project have been greatly improved. At the same time, we attach great importance to the management of irrigation test stations. This year, the provincial water resources department approved the xxx drainage experimental station in our city as a provincial key station. The station actively cooperates with universities and scientific research units to carry out special research on agricultural irrigation, and many scientific research effects have won national and provincial awards; The xxx irrigation experimental station of dangerous water is connected with the water-saving refreshing project of reservoir irrigation area, and the action measures of the observation station are completely updated.

(2) The Municipal Water Conservancy Bureau will continue to increase investment attraction.

First, attract investment. At the beginning of the year, the city's water conservancy system investment conference was held, the investment promotion work was arranged, and the investment promotion symposium was held on schedule to supervise the investment promotion work, which effectively promoted the development of investment promotion work. The city's water conservancy system attracted nearly 500 million yuan, and the Municipal Water Conservancy Bureau introduced five investment projects with an investment of 1, 0 1 ten thousand yuan. Actively involved in the water supply project of cooperation between xx Water Supply Company and xxx Co., Ltd., and fully introduced Hongyuan Titanium Project invested by xxx merchants, with a total investment of 80 million yuan and a first-phase investment of 30 million yuan, which has been officially put into production. Assist Wudi County to introduce Tianjin merchants to invest in planting fertilizer processing projects, and introduce planting funds of180,000 yuan, which will be completed and put into operation in 10. Assist Zou Liming Town Shandong Zeyong Industry and Trade Technology Co., Ltd. to introduce a jet weaving project with an investment of 55.7 million yuan.

(3) At present, there are still many difficulties and problems in reservoir reinforcement and cultivation.

The reservoir project management unit is a quasi-public welfare institution, and the daily management of the reservoir and the maintenance of culverts have never been included in the local financial budget. Competent departments and reservoir engineering management units must face up to this work and actively strive for it. All reservoir project management units should overcome their fear of difficulties and wait-and-see expectations, do everything possible to make the system work of reservoir project management units have a new start, and lay a solid foundation for the benign operation of reservoir projects. Next year, all units of the Water Conservancy Bureau should conscientiously do a good job in reservoir flood control and drought relief. Second, we must continue to do a good job in reservoir reinforcement. Third, we should vigorously supervise the work of irrigation areas and experimental stations. Fourth, we should check the project management policy slowly. Fifth, strive to improve the modern means of project management. Sixth, strive to promote a new starting point of the project management system.

;