The geological conditions of the construction site will also have more or less influence on the construction price. If the geology is hard, it will be more difficult for ground source heat pump to drill wells, and the price of drilling wells will also rise, such as bedrock and coarse sand. Due to different geological conditions and drilling difficulties, the price of drilling wells will be different.
general description of construction
The drilling depth of ground source heat pump should be between 80- 120m, and the drilling depth should be controlled within this range, which will not affect the greening environment. The soil temperature at underground 10- 100m is very stable. If the economic and reasonable scheme is pursued, the drilling depth can be controlled at about 80m, which is not only convenient for construction, but also less risky.
Large wells can be seen everywhere in rural areas, but many people don't know how to construct them when drilling wells. First of all, it is very important to determine the depth of well drilling. Once something goes wrong, the construction effect of ground source heat pump well drilling will be affected.