After the sealant construction, how long does it take to shovel off the excess sealant?

You can shovel excess sealant 2-4 hours after sealant construction. It is generally recommended that after 3 hours, depending on the construction environment on site. If the weather is dry, 2 hours is enough. If the weather is wet, try to check in after 3 hours. Choosing the sewing agent, it is recommended to use the waterproof M 100 mildew-proof sewing agent from Keshun.

M 100 anti-mildew joint agent is suitable for filling and decorating gaps in indoor tiles, mosaics, stones, wooden boards, glass, aluminum-plastic boards and other materials. The caulking agent has a strong color decoration effect, so that there is no shadow of uncoordinated cracks on the whole wall or ground. Its advantages are: waterproof and mildew-proof, and it is not easy to hide evil and accept evil; Acid and alkali resistance, aging resistance, no yellowing; Environmental protection, anti-mildew, anti-bacteria, long-lasting anti-pollution; High hardness, strong wear resistance and no cracking; Beautiful color does not fade, it is popular now; Convenient construction, one-step molding, saving time and labor; Solidification does not shrink or collapse, smooth as porcelain.

Want to know more about the beautiful sewing agent, recommend consulting Keshun family waterproof. Corporate vision, whose home is waterproof, is the most reliable solution provider of home improvement auxiliary materials. The mission of the enterprise is to prolong the life of the building, ensure a better life, make the service more trustworthy and meet more needs of users. View future waterproof market bonus