1, engineering cost engineer, project manager, cost engineer, cost engineer, etc.
2, construction engineering consulting, evaluation, supervision and other related work.
3, architectural design, bidding, construction, acceptance and other related work.
4. Computer software, building informatization, virtual reality, AI building and other related applications.
5, building materials market research, data analysis and marketing and other related work.
6. Other work related to project cost and construction economy.
It should be noted that the work scope of engineering cost specialty is very wide, and there are some sub-fields, such as high-rise buildings, highways, water conservancy projects, railways and so on. And different fields need different professional knowledge and skills.
Brief introduction of project cost:
Project cost has two meanings. The first meaning: the project cost refers to the expected or actual expenditure of the construction project. That is, the sum of one-time expenses required for a project to form corresponding fixed assets and intangible assets through construction. This meaning is defined from the perspective of investor-owner.
College degree or above in civil engineering, civil engineering, construction economic management, engineering cost, construction engineering and budget is required.
A qualified project budgeter needs to know the general construction procedures, construction methods, project quality and safety standards; Familiar with the basic knowledge of architectural drawing, building structure and building structure, familiar with commonly used building materials, components, products and commonly used mechanical equipment; Familiar with the composition of quota, labor cost, budget price of materials, machine shift fee and charging standard.
Understand the laws and regulations of construction economy, be familiar with the terms of project contract, and be able to participate in bidding, tendering and contract negotiation; To have some basic knowledge of computer application, you can use computers to work out the construction budget.
Able to independently complete project budget estimate, estimation, budget and settlement. In addition, you also need to have good communication skills, coordination skills and work execution skills.