Yunnan has both expressway.
Kunshi expressway (Kunming-Shilin)
Kun 'an Expressway (Kunming-Anning)
Kunqu Opera expressway (Kunming to Qujing)
Kunyu expressway (Kunming-Yuxi)
Kunchu expressway (Anning-Chuxiong)
Chu Da expressway (Chuxiong-Dali)
Dabao expressway (Dali-Baoshan)
Yuyuan expressway (Yuxi-Yuanjiang)
Yuanmo Expressway (Yuanjiang-Mohei)
Expressway, Xiao Si (Mohe-Mohan)
Pingshuo expressway (Mile-Plain)
Expressway, Baorui (Baoshan-Ruili)
Application of BIM in Yunnan 1 1 expressway Project
Yunnan Province has developed a BIM-based cloud management platform for project construction, which has been applied in Ma Zhao, Xuanpu and Long Rui 1 1 expressway and achieved remarkable results. Because Yunnan Province is located in Yunnan-Guizhou Plateau, with steep mountains and complicated geology, the proportion of bridges and tunnels in most expressway projects reaches 40% ~ 60%, and some sections exceed 90%. There are many high piers, long-span bridges and long tunnels, so it is difficult and risky to control quality and safety. In order to improve the efficiency in the project management process, enhance the quality and safety management effect, and strengthen the concept of supervision during and after the event, the platform was developed.
Highlight 1: it can realize the visualization and simulation of engineering design and preliminary work, and provide a basis for rational division of bid sections and planning of preliminary work such as transmission lines, engineering sites, beam slab prefabrication plants and mixing stations; By identifying the bad geology and environmental protection scope, the line selection and structure selection are realized; Simulate change and improve design scheme and cost, and strengthen design change management and project cost control.
Highlight 2: Monitor the construction process of key projects such as bridges and tunnels in real time, guide the standardized production, intelligent control and standardized assembly of components according to the design information carried by BIM model, and implement the control of concrete strength, subgrade and pavement compactness and early warning and pre-control of quality and safety risks according to the design technical requirements carried by BIM model, so as to realize the quality and safety management from "measurable" to "controllable" at the component level.
Highlight 3: Combined with the three-dimensional space scene, monitor the setting of on-site safety facilities, dynamically track the action route and trajectory of special operators or equipment, and send work instructions in time to effectively prevent safety accidents.