What is the responsibility and important role of Party A in construction management in the new period?

With the rapid development of China's social economy, the scale of China's construction projects is also increasing, and the requirements for the construction quality of construction projects are becoming more and more strict. Party A needs to do a good job in the management and supervision of the on-site construction management of the construction project, strictly control the project quality, and make corresponding adjustments to the construction progress. As an important part of project management, the management and supervision of Party A runs through the whole process of project construction. The representative of Party A refers to the person who is solely responsible for the supervision and management of construction projects. The work scope of Party A's representative is relatively large and plays a very important role in the supervision and management of construction projects. In order to play a role in project management, Party A's representatives need to have rich knowledge and high personal quality. In the continuous development of current construction projects, relevant laws and regulations are constantly improved, the construction management methods of project projects are gradually popularized, and the requirements for Party A's representatives are getting higher and higher. In order to effectively ensure the quality of construction projects, we must do a good job of Party A's representative from all aspects of construction management.

1 Party A's responsibilities in construction management in the new period. In a narrow sense, Party A's representative is the legal representative of investors, including the government and real estate developers, but in a broad sense, Party A's representative refers to the representative who is resident in the construction site to handle daily affairs, which is usually called Party A's representative. With the gradual implementation of current construction project management, Party A's representative has gradually become the subject of legal responsibility. The responsibilities of Party A's representative are mainly based on the contract, which clearly stipulates the responsibilities of Party A's representative. This contract mainly stipulates the responsibilities of Party A as follows. 1. 1 Liaison and coordination responsibilities. In the construction of building projects, information communication and exchange are very important, which requires the representative of Party A to play the role of a bridge to promote effective communication and exchange of information between the two parties. The main body of information exchange mainly includes the information exchange between the construction unit, the construction unit and the supervision unit on material supply and quality inspection. The overall construction scale of building engineering is large, and the construction site is chaotic. When performing personal duties, Party A's representatives need to adhere to the principle of fairness and justice, do a good job of coordination between the two parties, and put forward corresponding solutions to various problems existing in the project in time. For some major problems in the project, it is necessary to inform the other party in writing in time, so as to provide convenience for the construction unit and supervision unit in time and ensure the smooth progress of the project. 1.2 Do a good job in the construction scheme of the building project. For the construction management of building engineering, it is necessary to make a clear project construction plan to ensure the smooth progress of the project. It is necessary to have a special project plan implementation department to realize the dynamic management of the project plan, and at the same time, it is necessary to adjust the project plan according to the actual situation of the project. In view of the construction management of building engineering, there should be corresponding plans to assist the implementation of the project at any stage of project management. In order to effectively ensure the realization of the project planning objectives, Party A's representative needs to understand the project plan, supervise the completion of the plan and do a good job in the management and control of the construction site. 1.3 control the safety responsibility of the construction site. In the supervision and management of the construction site, Party A's representative needs to be familiar with the environmental conditions of the construction site first, and do a good job of coordination to ensure the smooth implementation of the project. Party A's representative needs to know some factors that may be affected in project construction management and be familiar with the objectives to be achieved by the project. The safety management of the construction site in the construction industry is very important and should be paid full attention by the construction party. It is necessary to establish relevant safety management institutions under the supervision of Party A's representatives, implement relevant safety management systems, take timely measures to control some major accidents according to the characteristics of engineering construction, and do a good job in supervision and management. It is necessary to plan the safety management of the whole project, analyze some dangerous problems that may occur in the construction process, and formulate corresponding emergency plans. 2 The important role of Party A in the management of the construction site The construction of the construction project is a long-term work, and the management of the construction site is relatively complicated, involving many management links and many external influencing factors, which makes the management of the construction site relatively difficult. In the management of the construction site, Party A needs to play an important role in building materials and safety. 2. 1 plays an important role in data management. Information management is very important in the construction management process. Party A plays a very important role in the management of building materials. It is necessary to sort out and record the construction materials in time, select the price and model of the materials needed for construction, ensure the scientific management of the construction materials, play an important role in the smooth construction of the project, and provide valuable experience for the design of the project in the future. The management of data can often solve the problems and settlement disputes in the later stage of the project. 2.2 the important role in quality management. In the early stage of project construction, Party A needs to control and manage the project in all directions, grasp every management detail and reduce accidents: ① In the process of project management on the construction site, it is necessary to do a good job in training technicians before taking up their posts and strengthen the sense of responsibility of construction personnel, and the overall construction progress of the project is closely related to the working attitude of employees; (2) In the field construction management, it is also an important premise to check the construction data in advance and strengthen the strict control of the problems existing in the construction site, and the effective management of the construction data is also to ensure the construction quality of the project; (3) Party A's representative needs to strengthen communication with relevant technical personnel of the construction unit, check the construction plan of the construction unit in advance, understand the construction progress of the project, and solve various problems in time. 2.3 the important role in the construction site management. At present, the competition among construction enterprises is becoming increasingly fierce, and various behaviors of construction enterprises need to be constantly standardized. Party A plays a very important role in improving corporate culture and management, and can provide a good working environment for the construction unit and let the construction personnel devote themselves to the construction. Party A needs to strengthen supervision and management in construction, improve its own management ability and level, and promote the orderly construction of construction projects. 3. Role of Party A in construction project management 3. 1 Role of Party A's representative in design stage. 3. 1. 1 Issue the design task book in advance. Party A's representative needs to be familiar with the contents and requirements of the project construction in advance, and issue a "design task book" to the design unit according to the actual situation of the project. The design unit shall do a good job in design according to the contents of the task book, the requirements of the relevant construction units for the project, the construction period and the geological survey data. 3. 1.2 construction drawing review. Construction drawing review is an important part of building construction. After the design drawings are completed, Party A's representatives need to review the construction drawings in time. For the preliminary design, it mainly reviews the design of the construction outline of the whole project, including the general plan, plan and profile. , check whether it meets the construction standards, and rectify the existing problems; In addition, for the review of construction drawings, it is necessary to review the specifications of building materials, building components and designs, and carefully review the specific contents in the drawings. 3. 1.3 Control of design change. Design changes have a great impact on the project, and Party A's representative is required to strictly control the design changes. After the design drawings pass the examination, it is necessary to reduce the changes to the drawings and avoid increasing the project cost. However, there are serious defects in the design, and the construction technology level can not meet the design requirements. After the design changes, the contractor must be informed in time. 3.2 Management function of Party A's representative at the construction site. 3.2. 1 site construction safety management. The construction scale of building engineering is relatively large, and the on-site construction is rather chaotic. The management of the construction site is mainly to put safety in an important position. Party A's representative needs to play an important role in ensuring site construction safety. Party A's representative needs to urge Party B to do a good job in safety training for construction personnel, set up safety signs at the construction site, make the construction personnel have a certain sense of safety, and at the same time do a good job in on-site inspection to find out existing problems in time and eliminate potential safety hazards at the site. 3.2.2 Construction quality management of building engineering. In the construction management of building engineering, it is the important duty of Party A's representative to manage and control the construction quality. For every link of on-site construction, Party A's representatives need to visit every construction link in person and pay attention to the supervision of construction procedures. Party A's representative needs to be familiar with the relevant design and specifications, master the relevant knowledge of engineering construction, supervise the construction unit to carry out the construction according to the operating specifications in actual construction, and always clarify their responsibilities and obligations to ensure the effective control of construction quality. 3.2.3 Construction progress management of building engineering. The construction progress of construction projects plays a very important role in the overall benefit of construction enterprises. The representative of Party A shall effectively control the construction progress of the site project, promote the construction progress on the premise of ensuring the construction quality, supervise whether the construction unit implements the project according to the construction contract, catch up with the construction period on the premise of ensuring the construction quality, and complete the project according to the construction period stipulated in the contract. 3.2.4 Construction project cost management. The construction scale of building engineering is large and the construction period is long. In the whole construction of the project, it needs to consume a lot of manpower, financial resources and material resources, and the cost is relatively large. Party A's representative needs to effectively control the construction cost of the project, verify the material cost and personnel cost, and put an end to the waste of construction materials. For example, under the premise of ensuring the quality and progress of engineering construction, the expenditure of personnel expenses should be reduced, and the selection of building materials and mechanical equipment should be coordinated with guaranteed manufacturers to prevent damage and avoid increasing costs. In the construction of building engineering, data management runs through the whole construction process, and it is also an important data to record the whole construction process, which plays a very important role in the future construction, and requires the representative of Party A to collect and sort out relevant data in the construction stage. 4. The practice of Party A's management in the construction site in the new period. 4. 1 On-site management practice in the construction preparation stage. 1) Before the start of the construction project, Party A's representative needs to know the work contents related to personnel transfer and material selection in the field construction in advance, and do a good job in reviewing Party B's relevant technical data in time to ensure that the overall engineering construction technology meets relevant technical requirements and standards. At the same time, it is necessary to do a good job in the management of on-site construction personnel to ensure the effective arrangement of project management personnel. The management personnel of Party A need to carry out strict inspection. 2) Before the construction of the project, Party A's management personnel should do a good job in technical training and safety awareness training of construction personnel in time, improve the safety management awareness of construction personnel, and avoid all kinds of unsafe accidents in time. 3) The relevant construction scheme provided by Party B requires Party A's management to do a good job of auditing in time to ensure efficient construction. In view of various problems existing in the construction, the construction unit needs to make reasonable adjustments to ensure the smooth progress of the whole project. 4.2 Construction site quality management practice. During the construction management of on-site projects, Party A's personnel will not participate in the specific project construction process, and Party A's representatives will only play the role of supervising and managing the construction site, paying attention to standardizing the safety, construction progress and quality of the construction site and ensuring the effective implementation of the project. In the construction site management in the new era, Party A's representative should not only do his own job well, but also pay attention to improving the project management level while ensuring the construction quality. 1) Control the quality of materials in site construction. If there is something wrong with the material quality, it will seriously affect the engineering quality. Party A's representative needs to strictly check the construction materials in time to ensure that there will be no mistakes in the quality of the materials. 2) Manage the construction process. In the process of building construction, there are many engineering construction processes, and each construction process is interrelated. To ensure the quality of each construction process, timely supervision and acceptance, to ensure the quality of each step. 3) Quality management of project completion acceptance. After the project construction is completed, Party A's representatives need to check and accept the project quality to ensure the construction quality of the whole project. During the acceptance, it is necessary to point out the unqualified places in time, and the relevant person in charge needs to take responsibility and do a good job of revision. 4.3 Practice of construction budget management. Pre-settlement management in engineering design stage, before investing in project construction, it is very important to do a good job in quality control in engineering budget management stage, which requires Party A's management personnel to analyze and study relevant design drawings, engineering cost and material consumption to control engineering cost. Pre-settlement management in project bidding stage. In the bidding stage management of the project, Party A's management personnel need to control funds according to the budget situation, strengthen supervision and management, fully understand the construction conditions, the expected target of the project cost and the preparation of the design drawings of the construction project, and do a good job in the corresponding budget management. Party A's representative should be able to effectively control the construction progress of the site project, promote the construction progress of the project on the premise of ensuring the construction quality, supervise whether the construction unit implements the project according to the construction contract, catch up with the construction period on the premise of ensuring the construction quality, and complete the project according to the construction period stipulated in the contract. Pre-settlement management in the construction management stage of building engineering requires Party A's management personnel to effectively control funds according to the pre-settlement, strengthen supervision and management in construction, and reasonably control the project. In view of the budget expenditure beyond management, it is necessary to keep it. If the later project changes, Party A's management personnel need to strictly review the project budget, and at the same time do a good job in on-site visa management to ensure its use in the later project claims. Pre-settlement management in the completion stage: After the project is completed, Party A's representative needs to ask the construction party for the project settlement report, and the relevant project cost engineer will review the project cost and project settlement. Party A's representative needs to keep all the project data properly to facilitate the later verification of the project. Conclusion Party A's representative plays an important role in the construction management of the project, and plays an important role in the preparation stage, site construction stage and later completion stage of the construction. Party A's representative needs to be familiar with the construction content of the project, control the cost, safety and quality in the construction, give full play to its management function in the construction project, clarify its own responsibilities, do its own work on the construction site, ensure the construction quality of the construction project and ensure the interests of the construction enterprise.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd