Daguangdingzi Tourist Scenic Spot is located in Zhirui Town, Keshiketeng Banner, Chifeng City, Inner Mongolia Autonomous Region, and is named after Daguangdingzi Mountain, the highest peak in Chifeng City. The scenic spot is adjacent to Songshan District and Wengniute Banner in Chifeng City, with a total area of more than 400,000 square meters. It is the first comprehensive scenic spot in the world with the theme of "wind" and "Fengshen" culture. The scenic spot * * * will be built in three phases, highlighting the creation of "Feng" and "Fengshen" cultural brands, and building it into a unique comprehensive leisure tourism resort integrating theme amusement park, hotel catering and leisure entertainment. It can meet the diversified tourism and holiday needs of tourists, such as "off-peak amusement, getting close to nature, eating, living and traveling", and strive to build a one-stop comprehensive tourism and holiday destination.
According to legend, the second princess of Di Ku has Zhu Di of _ [s not ng], where she gave birth to the ancestor of Shang Dynasty [Xiè], "Qi Xuanwang, born and bright. Living in the stone, moving to the business ",the stone is the Daguangdingzi Mountain, and the worship of You's deity began to spread outward with the rise of the Shang Dynasty.
As the consulting service center of the scenic spot, the tourist service area is isomorphic with Fengshen Town and Fengshen Ski Resort, forming Fengshen Amusement Park. A poorly conceived amusement park promoting white tea Sichuan rock paintings; Ancient and modern Chinese and foreign popular science and the angel paradise of Shen Feng culture; A happy world where laughter and laughter gather; Qinglong amusement park with immersive audio-visual experience; Seven-star Aobao Amusement Park, which has the original "Fengshen Pushing" culture and Fengshen musical instrument display, has jointly formed a windmill kingdom full of magical fantasies. In order to let tourists better experience the culture of "wind" and "Fengshen", the scenic spot also launched performing arts activities such as float parade, theater performance, light show, sound of the wind concert and so on.
Second, the project investment situation
The total planned investment of the project is 3.48 billion yuan, including 620 million yuan in Phase I, 65.438+0.465.438+0.00 billion yuan in Phase II and 65.438+0.45 billion yuan in Phase III.
Third, the content of the project construction
1. The main construction contents of the first phase project include: Qi Xuan Palace (visitor center); Qi Xuanwang Commercial Street; Heating station and heat storage station of Fengshen headquarters; Large indoor color slide project; Fengshen ticket office; Windmill kingdom ticket office; Large-scale outdoor image grassland performance project; Construction of indoor large-scale amusement facilities (vertical ring sports car); Indoor interactive shooting project workshop; Devil slide amusement facilities, indoor vertical drop of nearly 20 meters, * * * three sets of slides; The largest scenic spot logo "Fengshen" and supporting water supply, power supply and some road hardening projects in the scenic spot.
2. The main construction contents of the second phase project include: Snow Kingdom Project (snow gear rental and service function), with a construction area of 185 1 m2; Blizzard World Construction Project (large-scale catering), with a construction area of 2,284 square meters, which can accommodate 300 people for dining at the same time; Display of large parts of fan; Large float parade (similar to Shanghai Disneyland float parade); Professional stage performance projects; Indoor colorful slideway construction project with a construction area of 335 1 m2, which can accommodate 1.500 people at the same time; Five-color wind cultural center construction project; Fengshen pushes a large bonfire romantic project; Supporting building facilities for Daguang T-shaped Grassland Music Festival; Large-scale light show (including "five-color windmill array", night light show of various buildings and light show of building facilities); Large fireworks display, etc.
3. The third phase of the project will mainly build Fengshen Town, Daguang Town and travel on the road.
Four. Project progress
1, the first phase of the project has completed a total investment of 350 million yuan, including 250 million yuan in 2020 and 202 1 billion yuan. At present, Fengshen Amusement Park (including two ski slopes and 1 children's ice and snow amusement park) and its supporting infrastructure are being renovated and completed on July 65438. After the opening of the park, the tourist center, commercial street (shopping center), indoor colorful slide entertainment center, windmill kingdom dining area, indoor shooting hall, devil slide paradise, float parade and light show will be put into use. By then, the average daily catering reception will reach 2,000 people (which can accommodate 500 people at the same time) and the average daily tourist reception will reach 20,000 people.
2. The second phase of the project has completed the preliminary procedures and started construction in April 20021year. It is planned to be fully put into use by the end of 2023.
3. The third phase of this project is currently being planned. 202 1, the main work is to plan the project construction and prepare all supporting documents before the land is submitted for approval, including forest and grass procedures and environmental protection procedures.