Selected 800-word acceptance speech

Build a project, build a monument and make friends. In the construction process, our company adheres to the policy of "safety first, quality first", strictly controls the materials entering the site together with the construction and supervision units to ensure the quality of the materials, and operates in strict accordance with the requirements of design documents and construction specifications, and timely determines the solutions to various problems encountered in the construction; Problems found in the process of self-examination are also corrected and improved in time. Next, I will make an acceptance speech for everyone to read and appreciate!

Acceptance speech 1

Leaders, experts and comrades:

Hello everyone!

Autumn chrysanthemum is fragrant and fruitful, and the wind sends good news. In this beautiful season of harvesting hope, especially under the correct leadership of provincial, city and county governments and the correct guidance of water administrative departments at all levels, we overcame the "7. 18" catastrophic flood under the guidance of Scientific Outlook on Development, and the flood control work achieved initial results. We held a grand acceptance meeting for the dam, spillway and diversion tunnel of Eping water conservancy and hydropower project in Zhuxi County here. Here, on behalf of Guodian Zhuxi Hydropower Development Co., Ltd. and the Party Committee of Guodian Zhuxi Hydropower Development Co., Ltd., I would like to extend my warm welcome and heartfelt thanks to Director Jin, leaders and experts who attended today's acceptance meeting! I would like to pay high tribute to leaders at all levels and friends from all walks of life who have cared for and supported the development of our company for many years! I would like to express my cordial greetings to the engineers, technicians, cadres and workers of the design, supervision and construction units who have worked hard for the project!

Eping Power Station started construction in June 2000, the first unit was put into operation in April 2000, and the second unit was put into operation in May 2000. Subsequently, the project was stopped.

In August of 20_, the main assets of the power station were acquired by China Guodian Corporation. 20 years1October 8th 165438, Hubei Hydropower Development Co., Ltd. Eping Hydropower Plant Continuation Project. 10 Over the past few months, with the cordial care of leaders at all levels, the strong support and help from all walks of life, and the joint efforts of all participating units, three dams, spillways and diversion tunnels have been built one after another. Today, with the care of provincial, city and county leaders and the sweat of leaders and employees of all participating units, the project has passed the acceptance and put into normal use. After the project is put into normal use, it can not only reduce the flood peak and bring into play the flood control benefits, but also effectively peak-shaving and dry electricity.

We will take this project acceptance as an opportunity and take Scientific Outlook on Development as a guide to do a good job in the production and operation of power stations that have been put into operation, the construction of power stations under construction and the development of the company's production scale, and make positive contributions to local economic construction and social development.

Here, I wish the acceptance meeting a complete success!

Finally, I sincerely wish all leaders, experts and delegates good health and smooth work!

Acceptance speech 2

Leaders:

Thank you for coming to participate in the energy-saving pre-acceptance of the self-use office building project of Shangye Machinery Factory in Beibei District of Chongqing.

The project completed all construction procedures and started construction in May 2000. During the construction, all parties have fulfilled the contract well.

Organize the blue prints.the design when the project starts, approve and issue the engineering changes and negotiations proposed by the construction unit during the construction period; Quality management: Quality management is based on the principle of "quality first". In terms of safety work, we should conscientiously study the laws, regulations and rules on safety production issued by government departments at all levels, and implement the responsibility system for safety production and safety supervision and management. In terms of construction funds, our unit raises funds through various channels to ensure that the project funds are in place.

We insist on strengthening the comprehensive supervision and management of construction units. Friendly neighborhood, harmonious public security. Here, on behalf of the construction unit, I would like to congratulate the construction unit on its safety and smoothness in the whole project construction, meeting the design requirements and completion acceptance specifications.

We would like to express our heartfelt thanks to the quality supervision, design, geological prospecting, supervision, construction and other units that gave us strong support during the construction process! Everyone has worked hard! !

Thank you!

Acceptance speech 3

Dear leaders, experts and guests,

Hello everyone!

In the autumn of October, we held the _ _ _ project handover acceptance meeting here. On behalf of the company, I would like to extend my warmest welcome to the leaders, experts and guests attending this meeting! I would like to express my heartfelt thanks to the leaders at all levels and relevant departments who have given strong support and care to the construction of this project, and to all the participating units and builders of this project!

_ _ Highway is a key project determined by the district committee and government, and it is also the first BT project of _ _ traffic construction. Our company has been working hard with the aim of "contributing to _ _ and seeking welfare for the masses". As the main body of BT project financing, actively raising highway construction funds not only ensures the normal construction, but also creates a new highway investment model led by the government, supported by superiors and operated by enterprises in the market.

Since the project started in March, 2000, it has been highly valued by the district committee and government. The leaders of the district party committee and the district government visited the site for many times, and the deputy district head in charge of transportation personally took the lead, regularly dispatched and worked on site, which greatly encouraged the morale of all builders and created a good construction environment for the project construction. The leaders of District Transportation Bureau and _ _ Company are very concerned about the construction of _ _ highway, and they have given strong support and excellent service during the construction process, laying a solid foundation for the smooth completion of the project. During the project construction, the Municipal Quality and Safety Office supervised and managed the whole process, found and pointed out the quality and safety problems existing in the project construction in time, and urged the rectification to be in place, which provided a guarantee for the quality and safety of the construction project to reach the construction goal. The construction of _ _ highway has also been concerned and supported by other relevant departments of the district and town and the people along the highway construction, so I won't go into details here.

_ _ Highway (_ _ section) was successfully completed with the concern of leaders at all levels and the support of various departments. We will take the commissioning and trial operation of _ _ Road as an opportunity to urge the construction unit and supervision unit to pay close attention to the operation status of _ _ Road in the next two years, extensively collect opinions and suggestions on the use of _ _ Road, actively improve and perfect the service function of _ _ Road, and provide good transportation services for the social and economic development of _ _ District and the people's travel. _ _ Company will continue to contribute to the construction of _ _ District and _ _ City!

Thank you!

Acceptance speech 4

Leaders, experts and comrades:

Hello everyone!

The sun is like fire, peaches and plums are fragrant. When the Party came, the leaders and experts of the Municipal Acceptance Committee came to the site to carry out the completion acceptance of the Central Yunnan Expressway, which was a long-awaited event for us in Central Yunnan. Today, after careful examination by leaders and experts, the Yunnan-China Expressway successfully passed the completion acceptance. It can be said that this satisfies a wish of our loyal people. Here, on behalf of all employees of Dianzhong Company, I would like to express my heartfelt thanks to the leaders and experts of the Acceptance Committee for their hard work and efforts in the acceptance of Dianzhong Expressway! I would like to express my heartfelt thanks to the Chongqing Municipal Government, the Municipal Development and Reform Commission, the Municipal Communications Commission and relevant departments for their strong support and concern for our company over the years.

As we all know, the Yunnan-Central Expressway is a section of the Shanghai-Chongqing Expressway in Chongqing, starting from Zhongxian County in Chongqing and ending at Mingyue Mountain at the junction of Sichuan and Chongqing, with a total length of 75. 168 km. The construction of this project officially started on October 20th, 2000 165438, which lasted for three years and was completed on February 28th, 2000. The completion and opening to traffic of this project ended the history that there was no expressway in Zhongxian County, shortened the driving time from the main city of Chongqing to Zhongxian County from 5 hours to less than 2 hours, and played a positive role in building a rapid transportation network in eastern Chongqing, increasing Chongqing's economic radiation, and driving and promoting the economic development of eastern Chongqing, western Hubei and even the whole western region.

However, because the company's request to the Ministry of Environmental Protection was not approved, the Yunnan-China Expressway has never been completed and accepted since it was put into operation. Therefore, for many years, expressway in central Yunnan has been put into use without completion and acceptance, which has failed to give full play to the comprehensive functions and benefits of expressway in central Yunnan, and also affected and restricted expressway in central Yunnan to play a better role to some extent.

The completion and acceptance of the Yunnan-China Expressway has always touched the hearts of leaders of relevant departments directly under the municipal government, such as the Municipal Development and Reform Commission and the Municipal Communications Commission. In the process of organizing the completion acceptance, leaders at all levels in Chongqing actively helped to coordinate and solve various difficulties and problems, communicated and coordinated the relationship between various departments, and did a lot of work for the completion acceptance. Today, the successful completion and acceptance of the Central Yunnan Expressway project is a great event and a happy event for us in Central Yunnan. In the future, we will take this inspection of expressway in central Yunnan as an opportunity to realize scientific maintenance, further improve the operation and management of expressway in central Yunnan, constantly improve the system and improve the service quality. Maximize the transformation of resource advantages into economic advantages, and create conditions and provide support for promoting economic and social development in northern Fujian.

Leaders, experts and comrades, the completion of the expressway project in central Yunnan has devoted their efforts and wisdom and benefited from their concern and attention. It can be said that this is a special gift given to our loyal people and even the people in northern Fujian by the leaders and experts of the expressway Project Completion Acceptance Committee in central Yunnan, Chongqing, on the occasion of the Party's convening. Here, on behalf of more than 200 employees of Dianzhong Company, please allow me to express my heartfelt thanks to the leaders and experts of the Provincial Acceptance Committee, and to the leaders and comrades at all levels who have worked hard for the construction and operation of expressway in central Yunnan!

Finally, I sincerely wish all the leaders and experts a smooth and happy work in Chongqing.

acceptance speech

Dear leaders and delegates,

Good afternoon, everyone. Welcome to the single acceptance meeting of network equipment and other service procurement projects (A and B). I'm Li, the representative of the engineering supervision unit. Entrusted by the Local Taxation Bureau of Guangxi Zhuang Autonomous Region, the supervision unit organized this single acceptance meeting. First of all, please allow me to introduce the main leaders attending this meeting: Chen Zhijun, He Fan, Wang Qili, deputy director of the Information Center of the Local Taxation Bureau of Guangxi Zhuang Autonomous Region, and Liu Ying, an engineer; Kong Youming, supervision engineer of Guangxi Taiji Kensijie Information System Consulting Co., Ltd.; Zhu Qitai and Lareina C, engineer of the contractor Zhongke Software Technology Co., Ltd..

The acceptance team of this single acceptance meeting consists of deputy director of the Information Center, He Fan, Wang Qili, engineer Liu Ying, supervisor Li, Kong Youming and contractor Zhu Qitai. It is suggested that the director of the array should be the leader of the acceptance team. The acceptance basis, scope and content of this single acceptance meeting are put forward as follows.

According to the Interim Measures for the Administration of National E-government Construction Projects (Order No.55 of the National Development and Reform Commission) and the Bidding Contract for Procurement Projects of Network Equipment and Other Services (ContractNo.: gxzc20 _-g1-11232-yl-1-a) According to the requirements of Contract B for Procurement of Network Equipment and Other Services (ContractNo.: GXZC20 _-G1-KLOC-0/232-YL-2-B) signed by both parties, the single acceptance contents include: installation, deployment and trial operation of all hardware and software equipment upon arrival; Acceptance of project completion data. The arrival of all hardware and software equipment and the installation and deployment of equipment within the scope of contracts A and B were completed in August, 2000, so this single acceptance meeting only includes the acceptance of project construction achievements and completion data.

The following formal acceptance of individual work.

800-word selection of relevant articles in the acceptance speech:

★ Selected 800-word speeches at semi-annual meetings

★ Five 800-word speeches in basketball match

★ Highlights of speeches by leaders of insurance companies