Introduction of Longqing Expressway?

After three years of intense construction, on June 25th, 20 13, the section from Longquan to Qingyuan (Zhejiang-Fujian border) of Changshenguo expressway network was finally completed and opened to traffic, which means that Qingyuan ended the history of no expressway and started the happy road and ecological journey of Mushroom Town. Zhong Da Consulting Company introduced the following related information to it.

brief introduction

The route of Longqing Expressway starts from Damaoting, Chengguan Town, Longquan City, connects Lishui to Longquan Expressway, passes through Lan Ju Township, Chatian Town and Xiaomei Town of Longquan City, huang tian zhen and Zhukou Town of Qingyuan County, and ends at Xinyao Village of Qingyuan County (at the junction of Zhejiang and Fujian), connecting with the main skeleton "No.1 Vertical" (Songxi to Jian 'ou Expressway) of Fujian Province, with the main line length of 54.764. This project adopts two-way four lanes, the subgrade width is 26 meters, the design speed is 100 km/h, and there are interchanges at Longquan, Yangmei, Tea Field, Huangtian and Qingyuan (New Kiln) on the whole line.

Start construction

The construction of Longquan-Qingyuan section of Changshen Line of Zhejiang National Expressway Network started on 20 10 and 18.

Longquan-Qingyuan Expressway in Zhejiang Province is the southernmost section of the third longitudinal "Changshen Expressway" in the national expressway network planning. It is the extension line of the second expressway "Li Long" in the main skeleton of "two verticals, two horizontals, eighteen links, three detours and three passages" in the highway and waterway traffic construction plan of Zhejiang Province (2003-20 10), and is connected with the "one verticals" (Songxi-Jian 'ou expressway) in the main skeleton of Fujian Province. It connects northeast China, Beijing-Tianjin-Hebei, Bohai Rim, Yangtze River Delta, Pearl River Delta and Haixi Economic Zone, and it is also the most convenient transportation trunk line connecting Jiangsu, Zhejiang, Shanghai, Fujian, Taiwan Province and Guangdong, Hong Kong and Macao in southeast China. Compared with taking the Shenyang-Shanghai line, it can shorten the mileage by more than 200 kilometers and occupy an important position in the national and regional trunk highway network. In August 2006, the project proposal was approved by the National Development and Reform Commission; The feasibility study report of the project was approved by the National Development and Reform Commission in July 2009, and the preliminary design was approved by the Ministry of Transport in June 2009. 20 10, 1, through the project construction and construction supervision bidding.

Qingyuan is the most remote county in southwest Zhejiang, bordering Longquan and Jingning in the north and Fujian in the southeast and west. Located in a remote corner, far away from large and medium-sized cities, with inconvenient transportation, it is more than 220 kilometers away from Lishui and 580 kilometers away from Hangzhou, and its economic development is relatively underdeveloped. The construction of this project will improve the national and Zhejiang expressway backbone network, improve the regional traffic conditions, further implement the strategic goal of "three major constructions" in our province, connect the economic zone on the west side of the Taiwan Strait, strengthen regional ties, transform the resource advantages along the route into regional competitive advantages, promote urban and rural development, regional development, economic and social development, harmonious development between man and nature, strengthen national defense transportation, and ensure national security and unity.

Completed and opened to traffic

20 13 At 20: 00 on June 25th, after more than three years' efforts, Longqing Expressway was officially completed and opened to traffic.

Longqing Expressway starts from Damaoting, Chengguan Town, Longquan City, and is connected with Li Long Expressway which has been completed and opened to traffic. It passes through Lan Ju Township, Chatian Town, Xiaomei Town, huang tian zhen and Zhukou Town of Qingyuan County, and ends at Xinyao Village, Qingyuan County (at the junction of Zhejiang and Fujian). It is connected with the main skeleton of Fujian Expressway (Songxi to Jian 'ou Expressway), with a main line length of 54. Longquan, Meiyan, Chatian, Huangtian and Qingyuan (Huangtan) interchanges are set up on the whole line. Qingyuan is 21.1.98km long with a total investment of 654.38+57 million yuan.

The above is the introduction of Zhong Da Consulting to Long Qing Expressway. If you want to know more about highways, please pay attention to the architectural knowledge column of Zhong Da Consulting.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.