The festival of 20__ is coming to an end. Looking back on the past year, under the correct leadership of the Nuozhadu Project Department of the Corps, the Quality and Safety Unit of the detachment and the leaders of the project department, all the staff of the department gave guidance according to the quality and safety work arrangement formulated by the project department at the beginning of the year. Through one year's efforts, the Quality and Safety Department, as a functional department, has played its due role and achieved results, which has been recognized by the Nuozhadu Project Department, the owner and the supervisor of the Corps. It laid a solid foundation for the smooth completion of construction quality and safety, and made positive efforts to create a good social reputation for the project department. The following is a summary of the work done by the Ministry in the past 20__ years:
First, quality and safety work starts from scratch.
In 20__ _ _, the project construction of the project department was all high-altitude and high-slope construction, and the quality and safety situation was extremely severe. In view of this situation, the project department strictly implements the rules and regulations of on-site safety and quality management and various safety assurance measures during the on-site construction, and insists on the "three-work" system, so that there are arrangements before the work, inspections during the work and comments after the work. At the same time, the relevant personnel of the project department conduct irregular inspections to prevent inertia violations and strictly implement the reward and punishment system. The project department arranges special personnel to conduct special quality and safety education courses for the construction personnel of the cooperative team every week, which greatly improves and strengthens the quality and safety awareness of the construction personnel.
Second, improve the system and enhance the concept of quality and safety.
We will continue to improve the management system of our department and fulfill its functions and responsibilities. During this year, the staff of this department will treat the quality and safety work of the construction site enthusiastically, seriously and realistically, truly reflect the actual problems and current situation of the quality and safety of the construction project, serve the quality and safety of the first-line construction seriously and enthusiastically in line with the concept of "creating excellent projects", strengthen the awareness of engineering quality and safety, and improve the technical level of engineering quality and safety. Eliminate and control quality and safety hazards, and lay a good foundation for the smooth progress of the project.
Third, based on their own duties, due diligence
In one year's work, all the staff of the department actively obey the distribution, work hard, go deep into the construction line, earnestly perform their duties, give play to the role of quality and safety inspection of the Quality and Safety Department, and participate in the quality and safety control and acceptance of the blue prints.the design of each working face and cooperative team. In terms of quality, this year's project acceptance includes: fair-faced concrete above emergency gate well EL8 15, concrete above emergency machine repair gate well hoist frame EL835, emergency gate second-stage concrete, slope support and anchor cable at the entrance of spillway tunnel, etc. The above projects have passed the one-time acceptance, with the quality qualification rate of 100% and the excellent and good rate of over 90%. Safety acceptance includes: erection and dismantling of load-bearing scaffolding above EL835 for emergency maintenance gate shaft hoist, anchoring scaffolding for left side slope of spillway tunnel entrance, anchoring scaffolding for right side slope of spillway tunnel entrance, concrete load-bearing scaffolding for No.4 diversion outlet gate chamber phase II, and concrete scaffolding for maintenance gate shaft phase II.
The fourth is to create high-quality projects through quality and safety supervision and inspection.
1) Guide the construction with quality and safety and Quality and Safety Management Measures, seek credibility with quality and safety, strengthen various quality and safety inspections of construction projects, actively participate in various inspections organized by the owner, supervisor and the project department of the Corps, and carry out a month-long national quality month activity and a month-long safety month activity. Through the usual inspection and the activities of quality month and safety month, the quality and safety awareness of all personnel has been improved, and the quality and safety of the project have been further improved.
2) Each working face of the Project Department shall be provided with special quality inspectors and safety officers to discover and solve the quality problems, safety problems and potential safety hazards found in the construction project in time, which shall be recognized and agreed by the owner, the supervisor and the Project Department of the Corps. This year, the quality and safety of the project was accident-free, and the quality and safety objectives of the department were achieved.
The above is the work of the Quality and Safety Department for 20__ years. Through the efforts of Qi Xin, the staff of all departments, and the strong support of the leaders of the project department, they are conscientious and hard-working, fighting in the front line of construction all the year round, and paying hard sweat for the achievements made by the project department in engineering quality and safety, which is also their responsibility. The year 20__ is coming. Think back, sum up experience and make persistent efforts. In the new 20__ years, according to the new work arrangement and the actual situation of the project department, do a good job in quality and safety.
Personal work experience of quality department II
Time flies, time flies, and I ended my study career for nearly 20 years in a blink of an eye. 1, 20__, one day in July, I entered the south of MCC and started a new chapter in my career. Here are some insights and summaries on my internship, entry and work for more than half a year.
First, internship training
In February 2000, I received an interview notice. I applied for the position of BIM design assistant in Communications Municipal Branch. After selection, I received the employment notice in March. In mid-April, the company sent me to Huake Youjian Company, Building B5 12, Financial Port for training and study. From those who have never heard of the word Revit at first to those who have a certain degree of proficiency in Revit software, from their ignorance of the construction industry to their understanding of BIM, a new technology of engineering management application, they have gained a lot in their study in the past three months. Of course, I have to thank the company for cultivating and trusting me, and I am willing to give such a "layman" such a rare learning opportunity. At the same time, I also see the gap, the gap with professionals-Huake Youjian is an excellent team in BIM modeling, BIM application, project management and other related fields, and their employees have solid professionalism. Of course, becoming an excellent BIM engineer is my career planning goal in recent years, and I will unswervingly follow this direction.
Second, induction.
After the internship from April to June, I reported to the company compound in July this year and officially took up my post. When I first came to the company, I fell in love with it-just like a beautiful park, quiet and serene, with birds and flowers. It is very pleasant to think that I can work in such an environment every day in the future. Company leaders are approachable, guiding me forward as a mentor in my work and life; Colleagues in the company are always ready to help others. Every time I ask them questions, my seniors patiently and unreservedly explain them to me. There are three people in our BIM team. In the past six months, we have focused on software learning and in-depth understanding of BIM concepts. In addition to some learning materials provided by Huake Youjian during the training period, we have also searched relevant learning materials on the Internet to share, summarize and communicate with each other and improve each other. During this period, I also participated in some projects, mainly cooperating with various design institutes and information companies to make some BIM models, including roads, bridges and pipe corridors. Although we do some auxiliary modeling work, it is still very helpful to improve our professional quality.
At present, the project tasks assigned to us by the company are not very heavy. I also know that while completing the tasks entrusted to us by the company leaders, we need to learn and explore to lay a solid foundation for the company's municipal BIM. The road to BIM is not easy, and it needs to be gradual, from shallow to deep. We deeply feel that we have a long way to go, turn pressure into motivation, be down-to-earth and forge ahead.
Third, the existing problems
For urban construction companies, BIM has been dabbled in before, but its weight is not heavy, which leads to the lack of BIM professionals after the company is newly established, and the importance of BIM in municipal engineering applications is increasing day by day. The contradiction between the scarcity of BIM professionals in the company and the expansion of BIM application in municipal engineering arises. BIM is not Revit, not only 3D modeling, but also a process and technology. However, relying on our "novice" BIM team, it is difficult to apply this technology to municipal engineering. At least for now. On the one hand, our BIM team needs to constantly explore, forge ahead, accumulate experience and improve their quality. On the other hand, we also hope that the company will increase its investment in this area, such as organizing professional skills training and purchasing the latest books and videos. Company leaders give us confidence and support, and we study hard and make continuous progress. I think the BIM of urban construction company will get bigger and bigger, and it will get better and better.
Four. working face
Generally speaking, since I joined the company on July 20, 2000, I have learned a lot: I have learned about the municipal industry, BIM technology, and some BIM-related software …
Looking back, I still have regrets and gained a lot.
Looking ahead, there is a long way to go.
The year of 20__ is coming, and I have made some plans for myself:
① Software: At present, I am only proficient in Revit, the core software of BIM, but I am not proficient yet. The goal of 20__ years is to master completely and understand thoroughly from all aspects; Then we have a deeper understanding of BIM-related software such as Navisworks, Infraworks and Hongye series BIM design software.
②BIM Certificate Examination: There is a BIM professional examination specially organized by the Ministry of Industry and Information Technology, which is divided into three directions-BIM modeling technology, BIM project management and BIM strategic planning. The latter two need a certain number of years of work, and I plan to get the professional certificate of BIM modeling technology in 20__.
③ Participate in the project: complete the tasks assigned by the leaders with good quality and quantity, actively cooperate with the work needs of other professional colleagues, give full play to their professional expertise, and strive for perfection to complete the work needs;
4 theoretical study: theory is fundamental, and learning cannot be forgotten. Keep a heart of continuous exploration, fully understand the construction industry and the technology of BIM. I will always pay attention to the industry trends, the latest published literature, make progress in continuous learning, and strive to achieve my goal as soon as possible and become an excellent BIM engineer.
I will always keep an optimistic attitude, work hard and contribute my meager strength to the development of the company and urban construction.
Personal quality department work experience 3
Time flies, time flies, and 20 years have passed in a blink of an eye. Looking back on this year, as an inspector in the company's quality inspection department, I have made a lot of progress, but there are also some shortcomings. Over the past six months, with the care and guidance of the leaders and the support and help of my colleagues, I have not only completed my job diligently and practically, but also successfully completed all the temporary tasks assigned by the leaders, and improved in all aspects. In order to do better in the future, sum up experience and draw lessons, I summarize the work in the first half of the year as follows.
First, the work harvest
In the past few months, as a quality inspector, I have carefully studied the company's quality management control process, and according to the requirements of my job responsibilities, I have got the following points:
1. I inspected the first piece in strict accordance with the requirements of the control plan, and did not miss the inspection, but inspected many pieces.
2. Patrol inspection is a meticulous work. Details determine success or failure. During the inspection, the products circulating in the process must go through the relevant formalities according to the Product Circulation Control Procedure before being released, and the system that the previous procedure is responsible for the next procedure and the next procedure is rechecked is implemented to ensure the checks at all levels.
3. Abnormal feedback In production, due to equipment or employees, various abnormalities often occur, ranging from the damage of a single component to the damage of a batch of components. If there is any abnormality, I will inform my superiors at the first time and deal with the problem in time.
4. I strictly follow the company's management requirements for sampling and storage of raw and auxiliary materials, so as not to miss more. Understand the physical and chemical properties of various raw materials and store them reasonably.
5. Sample inspection is a fine inspection process. "Details determine success or failure". I do every experiment well with a rigorous working attitude during the experiment. At present, I have mastered the inspection methods and steps of all raw materials. Thanks to my master and my colleagues, you taught me this.
6. Data Processing When recording data, I record, summarize and report every experimental data based on the principle of "seeking truth and being pragmatic". Make no mistakes and make false reports.
Second, feelings and experiences.
1, attitude determines that all work must be meticulous and meticulous. You can't always make mistakes. If necessary, check the results of your work to make sure that your work is foolproof. After work, we should always sum up work experience and lessons, constantly improve work efficiency and sum up work experience. Although I will make some mistakes in my work and be criticized by my leaders, I don't think this is a shameful thing, because I think these mistakes and criticisms can help me avoid similar mistakes in my future work and make me grow faster in my work. During working with you, I was deeply impressed by their rigorous and serious work style, and I also learned a lot from them that I lacked.
2. Being diligent in thinking is complicated in daily work, which requires us to be diligent in thinking, improve working methods, improve work efficiency and reduce working hours.
3. Constantly learning and constantly enriching your professional knowledge and skills will make your work more handy. If a person wants to make a difference in his post, he must be familiar with the professional knowledge of the post and broaden his knowledge in continuous learning. I am like a blank sheet of paper. I just entered the company and said nothing. Up to now, the handwriting on the paper is neat. Leaving school, my unit is Class Two. There is no end to learning, and work is another way of learning. After several months of laboratory study, I have now reached the working level of a regular employee.
Third, its own shortcomings.
1. Occasionally I will make mistakes in my work because of carelessness, which will bring unnecessary trouble to my work. In the future, I will finish my work seriously with a rigorous working attitude.
2. It is necessary to further strengthen the systematicness and scientificity of component inspection and improve the ability of comprehensive analysis and problem solving.
3. On the basis of completing the tasks assigned by the leaders, give full play to their own advantages, continue to strengthen the study of professional knowledge, and further improve the inspection skills of various components.
Four, 20__ year work plan
In the new year, I am determined to seriously improve my work level and contribute to the development of the company. In the future work, we should learn from other colleagues with an open mind, learn from good working methods, and constantly improve our own quality, so that our comprehensive quality can be improved to meet the development of the company and the needs of society. It is necessary to further strengthen the professionalism, enhance the sense of responsibility and improve the level of work completion.
Working experience in personal quality department 4
Spring goes to winter, and cold and heat change. In a blink of an eye, 20 years have quietly ended, and we will enter a temporary new year. Looking back on the coming 20__ years, under the correct leadership of the company's leaders, all the staff of our quality department worked hard to overcome various difficulties and ensured the certification and follow-up of the ISO220__:20__: 20 _ _ _ food safety management system.
I. Review of Main Work of Quality Department in 20 Years
20__ is an extraordinary year for the company, an unforgettable year, and the most arduous and arduous year for the quality department. Under the correct leadership of the company's leaders, all the staff of the quality department focus on ISO220__:20__: 20 _ _ food safety management system certification and product quality, vigorously build a food safety management system, actively and conscientiously perform the duties of the food safety management system, and strive to improve the supervision and technical service capabilities. It has played an irreplaceable role in the company's food safety management system certification and production quality management system construction, and the production quality supervision and service have achieved remarkable results.
(a) actively promote the implementation of ISO 220 _ _ 20 _ _ food safety management system certification.
Since the company started the certification of food safety management system in April, the quality department, as the core department of the certification system, has actively performed its duties around the overall situation of certification.
First, the process control points in the workshop are tracked and inspected, and the cleaning of each working procedure is checked, and the quality of production water is checked to ensure the operation of the system;
Second, the acceptance of raw materials, strengthen the acceptance of raw materials, and strictly control each batch of raw materials according to the acceptance standard of bone particles. * * * 4 17 batches of bone particles and 775 batches of auxiliary materials have been accepted. Rejected if it is unqualified (provided that it will not affect production), and there are 13 batches.
Thirdly, the production process and key control points were verified, and six verification schemes and reports were compiled. 760 batches of microorganisms were sampled at key control points to ensure abnormal gelatin production. 389 batches of drugs were prepared for the inspection of intermediate control points.
Fourthly, in order to sell products, we cooperated with the sales department to send 203 batches of samples, and communicated with customers to solve the inspection problems of freezing force, ash, chromium and microbial indicators. In order to improve the level of inspection technology, we have sent employees out to study five times.
Five, sewage acceptance, sewage *** 1400 batches.
Sixth, complete the application for food safety management system certification, submit the certification materials of food safety management system, and actively cooperate with the certification requirements of China Quality Certification Center to ensure the successful completion of certification.
Seventh, in August, personnel above the team leader were organized to carry out training on program documents, food safety management norms, pest control, process inspection operation procedures, food safety laws, etc.
Eighth, internal audit. 1October 22-23 10 conducts internal audit on the food safety management system of various departments, and issues non-conformities to all departments, and the nature of non-conformities is general. Each department made a serious rectification and summary report on the operation of the food safety management system, and then the leader of the food safety management team organized a management review and summarized the management review.
Nine is external audit. 1October 9165438+February 9 12- 13 cooperated with China quality certification center to review our company's food safety management system.
(2) Strengthen the supervision of food management system.
After the certification of food safety management system, the focus of work will shift from process verification and trial production to daily supervision capacity building, and the whole process quality control will be implemented in raw material procurement activities, inspection and product release. First, strictly control raw materials, especially mildew, maggots, pupae, large particles and other phenomena, and immediately report the situation to the purchaser, who will decide to deal with it. Put an end to unqualified raw materials from the source into the production workshop and ensure the use of qualified raw materials in production. The second is to conduct on-site assessment of raw material suppliers to ensure the supply of qualified raw materials for production. Fourth, carry out internal audit activities of food safety management system on a regular basis, and promote the continuous improvement of food safety management system through the implementation of rectification and preventive measures.
(3) Pay close attention to industry trends and actively carry out related technical activities.
1. The approval document for drug re-registration has been processed (drug approval number F20070006 is valid for 20__- 12- 18). Second, actively respond to the policy of the provincial bureau on food and drug management, and participate in the training of laboratory technicians' qualification certificate in Gansu Province 1 time, with 2 people; Attended the internal auditor training of China Quality Certification Center 1 time, with 6 people.
(4) Actively cooperate with relevant inspections by provincial and municipal bureaus to urge the effective implementation of rectification. Since February, except for the on-site audit of food safety management system certification, the rest * * * have been inspected by provinces, municipal bureaus and customers for ***5 times, urged to rectify, and submitted 5 rectification reports, which promoted the relevant implementation of various rectification measures and played a technical support and leading role for the department.
Second, the current problems in the quality department
The quality management department is the core department of the company, and the food safety management system gives it an independent quality veto power, which is in a very important position in the operation of the quality management system. Due to many objective factors, it has affected the full play of its functions. The overall performance is as follows:
(a) Institutional reform and capacity-building are at the initial stage of development and improvement.
The company has just passed the certification of food safety management system, but it is still a long-term and arduous task in the future to truly update the old concepts of traditional management, accept and understand and firmly establish the new concepts of food safety management system, because the standardization and procedures of work need employees to complete voluntarily on the one hand, and the constraints of external management system on the other hand to regulate their behavior. At present, there is still a big gap in quality supervision ability, technical service level and R&D innovation ability compared with the same industry, and institutional mechanism reform and capacity building are in the initial stage of continuous exploration and improvement.
(b) The whole quota management is weak and lacks vitality.
Quality management is an important part of the company's management activities, and the supervision responsibility is great. It is the key department for the company to give full play to its functions and technical support. However, the responsibility is not equal to the power given, and the management mode of emphasizing obligations over rights has obviously affected the work efficiency.
(3) The overall quality of personnel needs to be further improved.
The second edition of China Pharmacopoeia (20__ edition) puts forward higher requirements for the operating skills and comprehensive quality of inspectors, and our inspectors need to further improve their operating skills and their own quality. QA personnel lack practical experience, the ability to judge, analyze and solve problems independently in the process of production quality management, and the ability to innovate.
(D) Independent performance of the quality veto is not in place.
The company does not give enough support to the supervision of the quality management department, and occasionally only considers the immediate economic interests of the company and abandons the quality principle, which makes the daily supervision of the quality management department flawed and a mere formality.
Three, 20__ years of key work
(A) improve the quality of quality management personnel
First, establish a regular learning and training mechanism to improve the quality of inspectors; Second, continue to stabilize the quality inspector team, so that it can strictly control the quality of products and materials, prevent unqualified materials from being put into production and unqualified intermediate products from flowing into the next working procedure, and prevent unqualified products from being sold out of the factory.
(2) Strengthen supervision and management.
In strict accordance with the provisions of the Food Safety Management Law and the good manufacturing practice, strengthen daily supervision and inspection in the production process, urge and supervise the organization of production in strict accordance with the requirements of the food safety management system, strengthen quality control in all aspects of procurement, production, inspection and sales, and implement quality management to ensure product quality.
(3) Adhere to GMP training to play a role in improving the management level of the company and improving the quality of employees.
The mission of quality management is related to honor and responsibility. With the correct leadership of the company and the joint efforts of all employees, let's further cheer up, unite as one, ensure product quality with a better mental state, a more solid and meticulous work style and faster work efficiency, and play a greater role in ensuring product quality and safety and promoting the company's entrepreneurship and make new contributions.
Personal work experience of quality department 5
20__ years have come, and a new year has come. At this moment when we bid farewell to the old and welcome the new, we can review the work process of the past year and sum up the experience and lessons in the past year, so as to make greater progress in our future work. The company and the project department have always attached importance to quality work and always regarded quality work as a major event. The quality management work in the past year is summarized as follows:
First, the understanding of engineering quality and the formulation of related measures
Understanding of engineering quality;
According to the deployment of the provincial quality supervision station and the owners in Cheng 'an and Chongqing, the project department carefully organized and carried out a great discussion on emancipating the mind. In-depth study of Notice of Provincial Communications Department on Concrete Quality _ Jiaohan [20 _] _ "and Notice on Special Inspection of Highway and Waterway Engineering in the Province" (Jiaohan Quality Supervision Letter [2004]20 1No.) [20 _] _) is the ideological basis.
1. Quality is the lifeline and facade of an enterprise. Good construction quality is the foundation of enterprise development. Strengthen quality management, refine the construction scheme, prevent quality deviation in construction production, and find and correct hidden dangers in construction production quality in time.
2. Enhance the awareness of quality responsibility in construction production, clarify the construction standards and quality inspection methods, strengthen the summary management of construction details and processes, pay attention to full participation, increase penalties for violations, seize key links, and implement the quality management responsibility system.
3, establish and implement the quality is the guarantee of the construction progress and benefit, prevention first, people-oriented, earnestly perform the duties of supervision and management.
4, unified thinking and understanding, so that the government decrees are smooth, and no one can only pay attention to immediate and local interests and ignore the high standard requirements of engineering quality.
Specific implementation measures:
1, which supplements the personnel in the organization and quality management system, increases the personnel in key positions, re-divides the work, and clarifies the positions and responsibilities; Check and correct the effective operation of the quality system and adjust unreasonable links.
2. According to the characteristics of the project, the construction progress has been readjusted.
3. Send more skilled and high-quality professionals to the construction site. And with the progress of the project, relevant personnel will be increased to meet the needs of the project.
4, increase penalties, strict quality details in the process of construction management, and strengthen process inspection. Strictly implement the "three inspections" system of supervision engineer's self-inspection, re-inspection and final inspection.
5, do a good job in the implementation and effective implementation of various rules and regulations. Strictly implement the technical and safety disclosure system. Technical disclosure shall be made to the construction management personnel of all major sub-projects and sub-projects, including construction procedures, technological processes, operating points and quality standards. It should be defined and implemented as required.
6. Create a good working environment. In order to facilitate the specific work management, the Quality Management Assurance System, the Engineering Quality Inspection and Acceptance System, and the Material Procurement and Entry Acceptance Quality Management Responsibility Letter were compiled in combination with the site.
7. Link everyone's income with the project quality, give full play to the subjective initiative of managers, and form a good atmosphere within the scope of the project department, work area and engineering department.
Second, the organization project quality special inspection
Carry out special inspection of engineering quality. In order to further improve the engineering quality level, quality
Code that quantifies behavior. The prevention measures of common quality defects have been implemented, and the concrete has been cast in layers strictly, thus eliminating the quality problems such as formwork expansion and slurry leakage in construction. Strengthen quality management, carefully formulate construction measures and plans, form a feasible construction plan, prevent quality deviation in construction production, find and correct hidden dangers in construction production in time, and ensure project quality.
Third, the quality inspection work
In the field management, in order to ensure the quality inspection in place, the quality control procedures are strengthened through daily inspection, weekly inspection and monthly inspection.
The project department requires the work area to hold various forms of quality education activities such as engineering quality analysis meetings and quality on-site education meetings on a regular basis, so that everyone can realize ideologically that "if the quality is not good, you can't keep your job, and if the quality is not good, you can't create it". The current "active" emphasis on quality has been implemented by "quality dynamics", thus increasing the control of on-site construction quality.
Ensure that "problems found on the same day are solved on the same day", reflect the problems found in the on-site inspection to the on-site construction personnel at the first time, and solve related problems as soon as possible.
Four, the selection of advanced, set a good example.
In order to give full play to the role of engineering quality management personnel, establish a century-old plan, quality first, quality is the lifeline of enterprises. Based on the advanced mode of quality management, the selection activities of advanced quality sites and individuals were carried out in various construction sites of the project department. Select advanced quality, set up typical demonstration, mobilize the enthusiasm of site management personnel and promote the improvement of engineering quality.
Five, the same area and project quality contract.
The quality of the project shall meet the quality requirements stipulated in the contract of the construction unit.
The work area and all engineering offices must strictly follow the construction drawings, technical disclosure and relevant construction technical specifications, and accept supervision and management.
Quality rewards and punishments shall be implemented in accordance with the Measures for the Administration of Engineering Quality.
With the joint efforts of all colleagues in the project department, the quality of on-site construction has been well controlled, and good results have been achieved, which has won the honor of society and increased the benefits for enterprises.
Six, 20__ years of quality
The project department earnestly implements the spirit of the group company's documents, focuses on the development planning of the civil engineering department, diligently studies, tries many ways, firmly grasps the quality, determines the development goal, takes scientific and technological innovation as the support, takes refined management as the means, and strictly controls the quality according to the control procedures to ensure excellence as the project quality goal. In order to do a good job in quality management, the project department further increased investment, carried out quality management work in a planned, step-by-step and targeted manner, with the concept of achieving zero quality defects and the goal of striving for excellent projects, improved the quality management guarantee system, strictly realized process quality products, strengthened the awareness of quality products, accelerated the pace of development, and created greater glories.
Articles related to personal work experience of Quality Department:
★ Personal Year-end Summary of Quality Department: 5 pieces of 202 1
★ 10 quality inspection personal work summary
★ 202 1 personal year-end summary model essay of quality department
★ Six personal experiences at work
★ Summary of Personal Work of Quality Inspection Department
★ Work experience and feelings of quality inspectors
★ 202 1 Personal Summary Report of Quality Department
★ Personal summary report of employee quality
★ Work experience of quality inspector
★ Model essay on year-end personal work summary of quality department