Agricultural contract agreement materials

Materials of agricultural contract agreement In order to ensure that Party B earnestly performs the terms of the contract, Party A shall collect a deposit of RMB per hectare; The deposit paid by Party B shall bear interest at the current bank interest rate, and shall be returned to Party B when both parties terminate the contract. If Party B breaches the contract within the contract period, the deposit will be confiscated as liquidated damages. The following is the agricultural contract agreement materials compiled for everyone, providing reference, and welcome everyone to read.

Agreement materials of agricultural contract 1 This contract is concluded in accordance with the provisions of _ _ _ _ _ _ _ _ _ _ _.

I. Both parties to the contract

Employer (Party A): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contractor (Party B): _ _ _ _ _ Address: _ _ _ _ _ _ _ _

2. Name of contracted land: the cultivated land contracted by Party A is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Three. Term of the contract: from _ _ _ _ _ _ _ _ _

Use of contracted land: planting, production and operation.

5. Land rent price: the price stipulated by _ _ _ _ _ _ _.

Time for intransitive verb to pay the rent: Party B shall pay the rent to Party A in cash before _ _ _ _ _ _ _.

Seven. Contract security deposit: In order to ensure Party B's earnest performance of the terms of the contract, Party A collects security deposit at the rate of RMB per hectare; The deposit paid by Party B shall bear interest at the current bank interest rate, and shall be returned to Party B when both parties terminate the contract. If Party B breaches the contract within the contract period, the deposit will be confiscated as liquidated damages.

Eight. Rights and obligations of both parties

(I) Rights and obligations of Party A

1. All land legally used by the employer in the Contracting State;

2. Supervise and inspect Party B's rational and effective use of land according to the purposes agreed in the contract, and stop Party B's damage to land and agricultural resources;

3. Collect the rent according to the lease price and payment method agreed in the contract;

4. Maintain Party B's land contractual management right, and shall not illegally change or terminate the contract;

5. Provide Party B with production, technology, information and other services as agreed in the contract;

6. Respect Party B's autonomy in production and operation, and shall not interfere with Party B's normal production and operation activities according to law.

(II) Rights and obligations of Party B

1. Enjoy the right to use, benefit and transfer the contracted land, and have the right to independently organize the production, management and disposal of products;

2. Party B has the right to refuse the party responsible for the contract to change the contract content or unreasonable apportionment;

3. If the contracted land is requisitioned and occupied according to law, it has the right to obtain corresponding compensation according to law; When the contract expires or is terminated for any reason; the contracted land shall be restored of its original state.

4. To maintain the agricultural use of land, it shall not be used for non-agricultural construction and shall not cause damage to land resources;

5. Pay the rent according to the land rent price agreed in the contract, the time and method of paying the rent.

Nine. Transfer of land contractual management right

1. With the consent of Party A, Party B may transfer the contracted land by subcontracting, leasing, exchange, etc., and the transfer proceeds shall be enjoyed by Party B;

2. Both parties to the land transfer must sign a written contract and report it to Party A for the record;

3 land transfer period shall not exceed the remaining period of the contract period;

4. After the land is transferred, the land rent, the term and the way to pay the rent shall still be executed by Party B according to the contract.

X. liability for breach of contract

1. When Party B fails to seriously perform the terms agreed in this contract and fails to pay the rent and contract deposit in full within the agreed time limit, Party A has the right to take effective measures to protect its rights and interests;

2. During the lease period, if Party B interrupts the lease, or abandons farming, wastes, changes use or damages land resources, Party A has the right to recover the land, terminate the contract, and confiscate the contract deposit paid by Party B as liquidated damages, and severely punish it if the circumstances are particularly serious;

3. If one party's breach of contract causes economic losses to the other party, the party at fault shall compensate the other party for economic losses according to the degree of loss;

4. During the contract period, Party A shall not unilaterally recover the leased cultivated land. In case of unforeseeable events such as land requisition for national construction, unified planning of farmland capital construction, land development and comprehensive management, Party A and Party B shall settle them through consultation in accordance with relevant state regulations, and Party A shall be responsible for making appropriate adjustments to the farmland rented by Party B according to the situation.

XI。 If there are any matters not covered in this contract, both parties will sign the contract through negotiation.

12. The original of this contract is in triplicate, one for each party and one for the grass-roots unit.

Party A (employer): _ _ _ _ _ _ _ _ _ _ _ _

Person in charge of contract awarding (signature): _ _ _ _ _ _ _ _ _ _ _

ID number of the person in charge: _ _ _ _ _ _ _

Date of Signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Signing place: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (signature of the contractor): _ _ _ _ _ _ _ _ _ _ _

ID number: _ _ _ _ _ _ _ _ _ _ _ _ _

Date of Signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Signing place: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Material II of Agricultural Contract Agreement Party A (Owner): ContractNo.: Party B (Contractor): Signing place:

In accordance with the Contract Law of People's Republic of China (PRC) and the Land Administration Law of the People's Republic of China, in order to clarify the rights and obligations of both parties, Party A and Party B, on the basis of equality and voluntariness, adhere to the principle of paid use, and conclude this contract on the issue that Party A contracts the land to Party B for farming and Party B contracts the land to Party A..

Article 1 The location (location), category, area and use of the contracted land.

1. The land contracted by Party B is located in: city, town and village, with topographic map attached, and the contract unit price is as follows: ha, yuan/ha year;

2. Land category: The land area contracted by Party B is * * * hectares, including paddy field hectares and dry land hectares.

3. After Party A and Party B sign the contract, Party B only has the right to cultivate the land, which can only be used for cultivation permitted by law. Party B guarantees that the land shall not be transferred, leased, deserted or used for non-agricultural construction, or converted into homestead, other permanent buildings or used for other purposes without the written consent of Party A and the approval of relevant departments according to regulations.

If it is necessary to change the land type, such as changing from drought to water, changing from water to drought, etc., it must be reported to Party A in writing, and the construction can only be started after obtaining the written consent of Party A, and all expenses shall be borne by Party B. Party B is also responsible for dismantling the facilities that Party B has invested in the construction of the expired land. If it is not demolished, it will be handled by Party A, and the expenses incurred will be paid by Party B. ..

4. Upon the expiration of the contract, Party A has the right to recover the land, and Party B will unconditionally return it on schedule. If Party B needs to continue the contract, it must submit a written application to Party A three months before the expiration of the contract, and enjoy the priority of contracting at the same price when participating in the new round of land bidding.

Article 2 Term of contracted land

The land contract period is * * * years. From year month day to year month day.

Article 3 Land contract fees and payment methods

1. The total annual contract fee for this land is RMB (in words).

2. The contract fees shall be paid in cash, and Party B shall pay all the contract fees within 5 days from the date of signing the contract. If the payment is not made within the time limit, this contract will automatically become invalid, and all losses caused thereby shall be borne by Party B. ..

3. The contract fee for the next two years shall be paid in cash, and the contract fee for that year shall be paid before March 15 every year. If the contract fee is not paid on time, the contract will be terminated automatically.

Article 4 Rights and obligations of Party A

(1) has the right to supervise, inspect and guide Party B's production and operation activities in accordance with national laws and regulations, and ensure the rational use of Party B's land according to the purposes agreed in the contract.

(2) Ensure that Party B operates independently and does not infringe upon the legitimate rights and interests of Party B. If the crops planted are infected, Party B has the right to ask Party B to treat the crops planted, and the expenses and risks arising therefrom shall be borne by Party B..

(III) In order to ensure the improvement of soil fertility and the appreciation of land assets, Party A's agricultural machinery operation team is responsible for subsoiling and preparing the land contracted by Party B ... and charging Party B the mechanical farming operation fee according to the local subsoiling (harrowing) operation price.

(4) Guide and supervise Party B to complete the planting area agreed in the contract, and have the right to survey and measure the land contracted by Party B. During the operation period, assist and coordinate Party B's related affairs with local land, agriculture and other relevant departments.

(5) Party B is encouraged to return the straw to the field to improve the soil fertility. However, when planting high-stalk crops such as corn and sorghum, Party B shall return the straw to the field after crushing. If it cannot be crushed and returned to the field, Party B shall be responsible for cleaning the straw in the last year of the contract period. Otherwise, Party A has the right to charge Party B the straw cleaning fee.

(6) Charge according to the contract.

Article 5 Rights and Obligations of Party B

(1) Strictly abide by the laws, regulations and policies of the state and the relevant agreements in this contract, and independently cultivate and manage the contracted land according to the purpose and time limit agreed in the contract.

(two) enjoy the right to contract land revenue. Have the obligation to maintain farmland, facilities and forest belts in the contracted area, and shall not destroy or cut them down. During the contract period, the packaging materials of pesticides and fertilizers that meet the national standards shall be burned and buried in time, and shall not cause pollution to farmland. Party B must follow the regulations of Party A.. Without Party A's consent, Party B shall not carry out the land preparation work, and shall harvest the crops within the time specified by Party A. If Party A fails to carry out the land preparation work normally due to the untimely harvest of Party B's crops, it will be regarded as Party B's breach of contract (except that the crops cannot be harvested due to special weather reasons), and Party A will charge a penalty of 3% of the land contract price.

(3) During the contract period, the machinery and equipment, field water conservancy projects, houses, temporary buildings and water conservancy equipment purchased by Party B shall be built, maintained and kept by Party B itself. After the expiration of the contract, Party B shall recycle and dismantle it by itself, and the expenses for recycling and dismantling shall be borne by Party B. If it is not dismantled, Party A will dispose of it forcibly, and all consequences and losses shall be borne by Party B. ..

(IV) Party B shall strengthen the safety education for itself and its employees, and earnestly implement various mechanical safety operation procedures. Party B is responsible for handling personal and industrial injury insurance for itself and its employees. During the contract period, Party B shall take full responsibility for all safety consequences (including employees and third parties) such as personal injuries and mechanical accidents, and shall also bear civil liability and compensate losses for various economic disputes during the contract period.

(5) Party B shall not use the land that Party A has obtained the contracted management right for guarantee or debt repayment, and shall not change the nature of the land.

(VI) When planting land, Party B shall handle individual voluntary planting insurance with the local insurance company. If an individual goes to the local insurance company involuntarily for planting insurance, Party A will not bear any responsibility in case of various natural disasters.

Article 6 Liability for breach of contract

(1) Party B shall pay the annual land contract fee as of March 26th this year. If Party B fails to pay the land contract fee on time, the bid bond will not be returned, and Party A will not contract the land, and the land contract will be automatically terminated. Party A has the right to contract out the land separately, and all economic losses arising therefrom shall be borne by Party B. ..

(2) After the contract is signed, Party B shall not create wasteland or abandon land for any reason. Have the obligation to maintain farmland, facilities and forest belts in the contracted area, and shall not destroy or cut them down. Otherwise, economic or criminal responsibilities shall be investigated according to relevant laws and regulations. If farmland is converted into dry land, it must be approved by Party A in writing. Otherwise, Party A has the right to recover the land, and Party B shall bear the losses and consequences caused thereby.

(3) If Party B subcontracts the contracted land to others, it must obtain the written consent of Party A.. If Party B subcontracts others to farm or engage in other businesses without Party A's consent, Party B shall bear all the responsibilities and terminate the contract from the date when Party A finds out.

Article 7 Conditions for exemption

In case of irresistible natural disasters, land requisition by the state or major adjustment of superior policies, this contract will be terminated, and both parties are not responsible for each other.

Article 8 Modification and rescission of the contract

(1) Once the contract is signed, it has legal effect, and neither party may breach it. In case of breach of contract, the breaching party shall bear the liability for breach of contract.

(II) During the performance of this contract, neither party may terminate or change it without authorization. If it needs to be changed or terminated, it must be settled by both parties through consultation. Otherwise, the breaching party shall bear the liability for breach of contract.

Article 9 Supplementary Provisions

(1) This contract shall come into effect as of the date of signature and seal by both parties. For matters not covered in this contract, Party A and Party B can reach a supplementary agreement through consultation ... The supplementary agreement and annexes are an integral part of this contract and have the same legal effect as this contract. However, the supplementary agreement shall not conflict with the main terms of this contract.

(2) Since the land area needs to be reconfirmed, if Party A conducts a general survey of the land area contracted by Party B, it shall be implemented according to the actual area reconfirmed after the general survey. The contract fee paid by Party B shall be calculated according to the newly determined area, and the overpayment shall be made and the underpayment shall be made. If Party B fails to pay the contract fee according to the re-determined actual area, Party A has the right to terminate the contract unilaterally, and all the consequences arising therefrom shall be borne by Party B itself, and Party A shall not bear any responsibility.

(III) In case of any conflict between this contract and the relevant national policies, the relevant national policies shall prevail.

(4) Any contract dispute arising from this contract shall be settled by both parties through consultation. If negotiation fails, the court will decide.

This contract and its annexes are made in quintuplicate, four for Party A and one for Party B. ..

Party A: (Seal) Party B: (Seal)

Legal representative or person in charge (signature): legal representative or person in charge (signature): entrusted agent (signature): entrusted agent (signature): signing date: signing date: signing date.

Agricultural contract agreement materials triple with the same number:

Party A (Employer) Tel: Address: _ _ _ _

Party B (contractor) ID number: Tel: Address:

In order to strictly regulate the management of state-owned assets of Dongfeng Farm and ensure the preservation and appreciation of state-owned assets, Party A and Party B, through equal and voluntary negotiation, have reached the following agreement on Party B's contracting of fish pond culture of Party A..

Article 1 The use of fish ponds is restricted. The fish pond is only used by Party B for breeding according to law, and its use shall not be changed without the written consent of Party A. ..

Article 2 Contracted area and location The fish pond contracted by Party B for Party A is located in the reclaimed fish pond on the sand ridge of Dongfeng Farm, with a total area of 35.825 mu. The four boundaries are: east from the brick factory wall 1 m, south from the stone edge of the reservoir, south from the stone edge of the water conservancy embankment, west from the base edge of the factory building in Dong Tang, and north from the foundation center of the original Zhisheng restaurant reservoir.

Article 3 The term of the contract is two years. From _ _ _ _ _ year 65438+1 October1day to the end of _ _ _ _ _ year 65438+February, if it is necessary to terminate the contract due to the adjustment of national policies, both parties agree to terminate the contract, and the rent will be calculated until the date of termination.

Article 4 Contract fees, performance bond and payment requirements

1. contracting fee: contracting fee 1600 yuan/mu/year. The annual general contracting fee is fifty-seven thousand three hundred and twenty Yuan only (57 320 yuan);

2. Submit the requirements (press? Give first and then reproduce? (1) On the date of signing this contract, Party B shall pay Party A the contract fee for the first year in one lump sum. (2) The contract money from the second year shall be paid before 1 of that year.

3. On the signing date of this contract, Party B shall pay a performance bond of RMB five thousand Yuan only (¥ 5,000) to Party A. Upon the expiration of the contract, Party A will return it to Party B without interest within 10 working days after Party B has paid off the relevant expenses and fulfilled the contractual obligations.

4. The contract fee and performance bond shall be paid in cash. If Party B needs to issue invoices, the taxes and fees shall be borne by Party B. ..

5. Place of payment: Dongfeng Farm Finance Office.

Article 5 Rights and obligations of Party A and Party B

(I) Rights and obligations of Party A

1, exercise the right to contract and supervise fish ponds.

2. When Party B fails to perform the contract, it has the right to take back the contracted fish pond.

3. Stop Party B from destroying fish pond resources and other farm assets.

4, after the termination of the contract period, have the right to put forward new contract awarding standards, choose to determine a new contractor.

5. During the fish pond contract period, Party A is the beneficiary of the government's policies of benefiting farmers and supporting agriculture, unless otherwise stipulated by the government.

6. Maintain the relevant legal rights and interests of Party B. ..

7. Provide existing irrigation and drainage facilities to Party B for irrigation and drainage.

(II) Rights and obligations of Party B

1. Enjoy the right to use and benefit from contracted fish pond resources according to law. If, within the contract period, the facilities of the contracted fish pond are reconstructed with the written consent of Party A, the reconstructed property invested by Party B has the right to be disposed of within the contract period. If the contract is not disposed of at the expiration, it shall be deemed that Party B has given up the right to dispose of its property, and Party A has the right to clean it up. The cleaning expenses and losses caused to Party A due to Party B's failure to clean up in time shall be borne by Party B. ..

2. According to the requirements of the farm, the fish pond independently arranges the breeding methods according to law and bears all kinds of risks arising from the contracting process.

3. Fish ponds shall not be subcontracted during the contract period. After the expiration of the contract, under the same conditions, Party B has the priority to continue to contract the original fish pond.

4. Maintain the purpose of fish pond culture. During the contract period, Party B shall bear the maintenance expenses of the fish pond.

5. Implement the regulations of the government and Party A on family planning, comprehensive management and stability, environmental protection, prohibition of pesticide use and safe production according to law, and assist Party A in the above management.

6, the implementation of national and farm fish pond management policies and regulations, the protection and rational utilization of fish pond resources.

7. It is not allowed to open rafters, holes, block the inflow (outflow) of drainage channels or occupy drainage channels for shed farming. At the same time, be responsible for all the expenses of repairing or replacing the drainage tanks and trays in the fish pond area.

8. The products planted by Party B shall not violate the standards of the Food Safety Law, and the varieties prohibited by law shall not be planted. If Party B affects Party A's goodwill, it shall compensate Party A for the loss of goodwill of 20,000 yuan and take back the fish pond unconditionally.

9. Party B's disposal of dead fish shall meet the requirements of the Animal Quarantine Law and shall not be discarded; Otherwise, a one-time penalty of RMB 65,438+0,000 shall be paid to Party A, which shall be deducted from the performance bond, and the expenses for handling the dead fish shall be borne by Party B..

Article 6 Liability for breach of contract

1. During the contract period, except for the factors stipulated in the contract and the policy adjustment of the state and governments at all levels, neither party shall change or terminate the contract at will. In case of breach of contract, the breaching party shall bear the economic losses of the other party. If both parties are at fault, they shall bear corresponding liabilities for breach of contract. If Party A and Party B are unable to perform this contract due to force majeure, or this contract really needs to be modified or dissolved, this contract can be modified or dissolved according to legal procedures after negotiation by both parties, and the economic losses caused thereby shall be borne by both parties themselves or solved through negotiation.

2. If Party B fails to pay the contract fees on time, Party A will charge Party B a late fee of 0.3% of the total amount owed every day.

3. In any of the following circumstances, Party B shall be deemed to have breached the contract, and Party A has the right to unilaterally terminate the contract. If losses are caused to the farm or the third party in violation of the law, the corresponding legal and economic responsibilities shall be investigated: (1) Party B fails to pay the contract fee on time, which is 30 days overdue; (2) Party B subcontracts fish ponds privately; (3) Party B violates national and farm fish pond management policies and regulations; (4) Party B violates the regulations of the government and Party A on family planning, comprehensive management and stability, environmental protection, prohibition of pesticides and safety in production; (5) Without the consent of Party A, Party B opens rafters, holes and blocks the water intake (drainage) of the drainage channel without authorization; (6) Farms or third-party (crop) workshops are flooded due to excessive water inflow in fish ponds; (7) For whatever reason, the growth of crops in farms or third parties is affected by the salt water discharged from fish ponds; (8) Cross-border agriculture; (9) Party B damages farmland water conservancy facilities and other facilities in the farm.

Article 7 Ways to settle disputes During the performance of the contract, in case of disputes, both parties shall settle them through consultation. If negotiation fails, a lawsuit can be brought to Nansha District People's Court in Guangzhou.

Article 8 Other matters

1. This contract is made in quadruplicate, with Party A holding three copies and Party B holding one copy, which shall come into effect after being signed and sealed by both parties.

2. The annex to this contract is an important part of this contract and has the same legal effect as the main terms of this contract.

3. If the government expropriates or the farm needs to use the land, the young crop subsidy shall be owned by Party B, and the land compensation fee shall be owned by Party A. The compensation standard shall be implemented according to the documents of Nansha District Government.