Construction agreement

In daily life and work, agreement plays an increasingly important role, and signing an agreement can solve disputes in real life. How should we draft an agreement? The following are six construction agreements that I have compiled for you. Welcome to share.

Construction Agreement 1 Party A: Name (or name):

Address:

ID number:

Telephone:

Party B: Name (or name):

Address:

ID number:

Telephone:

Through negotiation between both parties, Party A contracts the construction project of self-occupied house to Party B, and both parties reach the following agreement on the construction contract of the construction project:

1. The contracting method for the building construction of this house is Party B's contracting for labor and materials. Party B shall be responsible for the construction and solve all the equipment needed for the construction and all the raw materials used for the construction by itself. The water and electricity expenses required in the construction process shall be paid by Party B, and the accommodation of the construction personnel shall be borne by Party B. During the construction process, Party B shall pay attention to the construction safety and take full responsibility for the construction safety. Party B shall bear all the responsibilities for the casualties caused by the operation errors of construction equipment and Party B's personnel. If personal and property damage is caused to a third party other than the construction personnel due to Party B's negligence in the management of the construction site, Party B shall take full responsibility. The construction drawings shall be signed by both parties and shall not be changed casually. If changes are needed, they should be agreed by both parties through consultation.

2. The building area of the house to be built is square meters, and Party A will contract all the house construction projects including ground beams to Party B (including interior and exterior wall tiles, indoor floor tiles, stairs and their ancillary facilities, bathroom floor tiles, kitchen console, carpentry, water and electricity pipeline installation, etc.). ). The unit price of Party B's construction contract is RMB per square meter, and the total project price is RMB.

Third, the construction requirements

① Geotechnical foundation: 70 cm deep, 60 cm wide and 40 cm wide inside.

(2) Wall, external wall, internal wall, internal wall, and internal and external staggered joints of masonry are generally made of cement mortar, and the strength should reach (150). There are constructional columns at the four corners and internal sample changing places generally need 80 gongs with two 6mm mortar with tie rods, and the fullness must reach the trinity masonry method (one quick brick, one shovel and one squeeze) and the bricks must be soaked before use.

③ Ring beam: the height of ring beam is not less than 12 cm, the diameter of reinforcement is not less than 10 mm, the diameter of rigid hoop is not less than 6 mm, the spacing is not more than 250 mm and the height of ring beam is not less than 200 mm. ..

(4) The roof should be hemmed first, and the reinforcement should not be 12mm, and the spacing should be 16cm. 150 level roof, the height of mixed mortar before ash is 25cm, and the height of post ash is 15cm. 5cm and 2cm mortar plastering with mixed mortar on the ash 1/3.

⑤ The price of black and white floor tile 6060 10 yuan shall be selected by Party A.. If it is made by 10 yuan, Party A will pay for it, and Party A will choose the black and white bathroom wall tiles, which shall not be less than 1.8 yuan. The interior of the wall is painted with room pool paint, with 4 square meters of copper core wire in each room, a hot lamp socket and a switch.

6 doors and windows: interior doors, solid wood doors and windows. Party B shall ensure the quality of plastic steel conch brand external doors and security doors during construction. During the construction, Party A and Party B negotiated.

⑦ Party B is responsible for indoor tap water and sewer pipes. The project duration is: year, month and day (Gregorian calendar/lunar calendar)-year, month and day (Gregorian calendar/lunar calendar), calculated according to the calendar duration. Party B shall carry out the construction on time. If the construction period is delayed due to Party B's reasons, the salary will be deducted by RMB per square meter for each day of delay. Except for delays caused by irresistible objective reasons such as heavy rain.

⑦ Party B shall ensure the construction quality according to Party A's housing quality requirements. After the house is completed and delivered, Party A shall conduct acceptance inspection according to the construction requirements. In case of building quality problems in the house, Party B shall repair it again until it meets the quality requirements of Party A, and compensate all losses caused to Party A due to the building quality problems. All maintenance costs (including materials used for maintenance) shall be borne by Party B. ..

Four. mode of payment

One-time payment starts 40%, masonry 40%, painting 40% and completion 70%. Also reputation% one-year maintenance clearance.

5. This agreement shall come into effect as of the date when both parties sign (seal) the text of this agreement. This agreement is made in triplicate. Party A and Party B each hold one copy, and the witness holds one copy.

By mutual agreement, the details are as follows:

Signature (seal) of Party A:

Signature (seal) of Party B:

Signature of witness (signature):

Signing time: year, month and day (Gregorian calendar/lunar calendar)

Signing place:

Article 2 of the construction agreement: Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _

In order to implement the national laws, regulations and rules on production safety and the production safety policy of "safety first, prevention first, comprehensive treatment", clarify the objectives and responsibilities of production safety management of both parties, ensure construction safety and prevent the occurrence of safety accidents, both parties signed a site construction safety agreement at the same time as signing the project construction contract. Specific liability clauses are as follows:

I. Project situation

1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. Project scope: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

4. Project duration: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Second, the management personnel

In order to ensure the safety management of the construction site and clarify the safety responsibilities, it is necessary to clarify the site management personnel of both parties:

1. On-site management personnel of Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. On-site management personnel of Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Three. Party A's Safety Responsibility

1. Seriously implement the laws and regulations on labor protection and safety in production promulgated by People's Republic of China (PRC), People's Republic of China (PRC) Fire Protection Law, People's Republic of China (PRC) Environmental Protection Law, People's Republic of China (PRC) Occupational Disease Prevention Law and Labor Law, and urge Party B to implement them.

2. Before the commencement of construction, Party A shall make technical disclosure on construction safety to Party B, and have written records or materials.

3. Party A shall require Party B to formulate construction safety measures before commencement and report them to Party A for the record.

4. Party A has the obligation to assist Party B in safety production, fire control management, supervision and inspection. Party A has the right to inspect and urge Party B to implement the relevant work regulations on safe production, stop and correct Party B's behavior that does not conform to safe and civilized construction, and issue a safety rectification notice until exiting.

Four. Party B's Safety Responsibility

As the contractor of this project, Party B shall be responsible for personal injury and equipment damage accidents during the construction. Party B shall earnestly perform the following safety responsibilities:

1. Relevant qualification certification materials required for contracting projects provided by Party B shall be true, legal and effective.

2. Party B must implement the national laws and regulations on production safety and formulate the corresponding safety management system; Strictly implement the Safety Production Law of People's Republic of China (PRC), Regulations of the State on the Administration of Safety Production in Construction Projects, Excerpts of Telecommunication Project Construction Safety and other relevant safety construction laws and regulations.

3. On-site construction shall comply with national and local laws, regulations and rules on labor safety and employment, and ensure the legality of employment. Party B must provide personal insurance for the construction personnel in accordance with relevant national regulations, and equip them with qualified labor protection articles and safety appliances.

4. Before starting work, Party B shall organize all construction personnel to carry out safety education. Special operations personnel must hold qualified and effective qualification certificates issued by relevant departments.

5. Party B must accept the "supervision and inspection" of Party A and promptly rectify the safety rectification opinions put forward by Party A. ..

6. During the construction period, Party B shall take good care of Party A's facilities and equipment. It is forbidden to steal, misappropriate or destroy the safety protection facilities, warning signs, materials, mechanical equipment and fire fighting equipment on the construction site. If Party B's personnel violate this clause, once found, they will be punished twice and dealt with severely. If the circumstances are serious, it will be sent to the public security organ for handling.

7. In case of casualties, equipment accidents or unsafe conditions endangering production and operation during construction, Party B shall immediately report to Party A and actively cooperate with the investigation.

8. Party B shall submit the accident investigation report of the accident investigation team and Party B's handling opinions on the accident to Party A for the record.

Verb (abbreviation of verb) liability for breach of contract

1. If the other party or the third party suffers personal injury, equipment damage and other property losses due to the responsibility of Party A or Party B, the responsible party shall bear the corresponding responsibilities and compensate the other party or the third party for all losses caused thereby.

2. During the performance of the contract, if the relevant qualification materials provided by Party B are found to be invalid, Party A has the right to terminate the contract, and all losses caused thereby shall be borne by Party B..

3. If Party B's on-site operators are found to have violated regulations, Party A will deduct the amount of similar violations from Party A's employees according to Party A's safety production reward and punishment regulations, and bear the corresponding liquidated damages.

Liability for accident claim of intransitive verbs

For accidents that occur in the construction process and cause personal injury or death, the insurance company shall be responsible for claims settlement according to relevant regulations and limits, and Party A shall not be liable for compensation.

Seven. The place of conclusion of this Contract is: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Eight, both parties must strictly implement this agreement, the legal effect of this agreement is independent of the main contract.

Nine. This agreement shall come into force after being signed and sealed by the legal representatives or entrusted agents of both parties.

X this agreement is made in duplicate, with each party holding one copy.

Party A: (signature) _ _ _ _ _ _ _ _ _ _ Party B: (signature) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party B.

Phone number: _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Article 3 of the construction agreement: In order to ensure the construction safety, Party A and Party B * * * reach the following agreement through negotiation according to the Rules for the Safety Management of Business Line Construction No.37 of Shenyang Railway Bureau, the Rules for the Safety of Train Operation System No.80 of Shenyang Railway Bureau and the Regular Meeting System of Business Line No.73 of Shenyang Railway Bureau:

I. Overview of the Project:

1. construction project: the waiting hall of Shenyang Railway Station will be used as a key passenger rest area.

2. Work content: Construction of key passenger rest areas.

3. Construction site: a beautiful service desk in the waiting hall of Shenyang Railway Station.

4. Construction time: September 3, 20xx to September 5, 20xx (the specific construction time is mainly provided by the Technical Department of Shenyang Railway Station).

5. Scope of influence: the beautiful service desk in the waiting hall of Shenyang Railway Station.

Second, follow the technical standards, procedures and specifications:

During the construction, the Detailed Rules for the Construction and Safety Management of Business Lines of Shenyang Railway Bureau, the Detailed Rules for the Construction Safety Management of Train Operation System of Shenyang Railway Bureau, the Regular Meeting System for the Construction of Business Lines of Shenyang Railway Bureau, the Law of People's Republic of China (PRC) on Safety in Production, the Regulations on Railway Safety Protection, the Regulations on the Technical Management of People's Republic of China (PRC) Railway, the Traffic Organization Rules of Shenyang Railway Bureau and the Safety Technology of Railway Engineering Construction shall be strictly implemented.

Third, the content of safety protection

1, the construction materials are protected and kept by special personnel.

2. The designated construction area for equipment installation (south of the beautiful service desk in the waiting hall of Shenyang Railway Station)

3, fire bucket, fire extinguisher

Fourth, measures:

1. When the equipment comes into the site for handling, the construction unit shall assign special personnel to install and protect the station equipment and passengers.

2. Before installing each point, the designated personnel should set up a safe area.

3. When the equipment is installed, there are safety protection personnel around the safety area to ensure that passengers are far away from the installation site.

4, when hot, dynamic welding has special protection.

Combine some work:

1. Party A introduces the construction contents and Party B checks the construction scheme.

2. Party A is responsible for putting forward the request of blockade or opening, and Party B is responsible for handling the procedures of construction blockade and opening.

Verb (abbreviation of verb) The safety responsibilities, rights and obligations of both parties.

1. Party A and Party B * * * shall implement measures to ensure absolute construction safety in accordance with the relevant construction safety management regulations of the competent department and our bureau.

2. Party A: To ensure the normal order of passengers waiting at the station, strictly perform the safety responsibilities during the construction period.

3. Party B: has the right to inspect the construction work within the construction scope of Party A.. According to the construction plan, check the scope of influence, safety measures and safety protocols.

Article 4 of the construction agreement: xx Feng Bin Real Estate Investment Development Co., Ltd.

Contractor: xx Wenjie Advertising Co., Ltd.

Based on the principles of voluntariness, equality, fairness, honesty and credit, the Employer and the Contractor have reached the following agreement on the construction of anti-aircraft gun billboards:

1. Project content: anti-aircraft gun billboard construction (both sides), including foundation construction.

Production requirements:

1, the total height of the billboard from the ground to the top is 22m, and the size of the double-sided signboard is 2m× 7m.

2. The diameter of steel pipe column is .22m, and the wall thickness of steel pipe is .2cm. ..

3. The color steel plate on the billboard surface has a thickness of 0.425, including maintenance channels, lamps and cable supports.

4. Painting of steel frame column: once with antirust paint and once with gray topcoat.

5. The concrete foundation is excavated to a depth of 9m, and the elevation of the upper opening of the bearing platform is 0㎝ lower than that of the surrounding sidewalk slabs.

6, anti-aircraft gun billboard foundation and welding construction, must be carried out in strict accordance with the construction specifications, anti-aircraft gun stability must meet the requirements of wind resistance level 2 and earthquake resistance level 8.

2. Project location: the intersection of xx Qiaotouji Road and Guhe Road, the location designated by the owner.

3. Contracting method: contracting for work and materials.

4. Construction period: xx years after signing the contract. In the first year, if there are quality problems, such as rust reversion and desoldering, Party B will repair unconditionally, except for natural irresistible factors. After one year, Party A will arrange maintenance by itself every year. If Party A fails to finish it on schedule, the contractor will not be responsible for the future quality problems of anti-aircraft guns.

10. Matters not covered in this contract shall be settled by both parties through negotiation. If negotiation fails, you can bring a lawsuit to the local court.

XI。 This Agreement is made in quadruplicate, three for Party A and one for Party B, and shall come into force after being sealed and signed by both parties.

Employer (seal)

Employer's signature:

Contractor (seal)

Signature of contractor:

Xx Feng Bin Real Estate Investment Development Co., Ltd.

Anti-aircraft gun billboard construction contract

Project name: Anti-aircraft gun billboard construction agreement

Construction unit: xx Wenjie Advertising Co., Ltd.

Article 5 of the Construction Agreement: Owner: _ _ _ _ _ _ _ _ Construction and Installation Engineering Company

Contractor: _ _ _ _ _ _ _1# Construction Project Department

Insurer: _ _ _ _ _ _ _ _ (Group) Company

In order to fully mobilize the autonomy and initiative of all employees in the construction project department, maximize work efficiency, and ensure the timely completion of the Oasis 1# building project, the following liability contracting agreement is reached through tripartite consultation:

I. Scope, contents and indicators of the contract (delivery):

(1) Basic information

1. project overview: this project is located in _ _ _ _ _ _ _, and it is a 26-story frame-shear wall structure residence with two floors underground;

2. Contract contents: ① All construction and installation works and supporting works according to the requirements of construction drawings; (2) The interior and exterior decoration of the main body is indoor wool wall, outdoor cement plastering and painting, and some exterior walls are pasted with mushroom stones;

(2), technical and economic indicators:

1, quality index: one-time qualified rate100%;

2. Safety index: serious injury and above accidents are 0 (according to relevant national policies);

3. Cost indicator: 1) Control the cost according to 97% of the preset value of the project; 2) Engineering materials shall be controlled according to 97% of the comprehensive budget; 3) Turnover materials, machinery and equipment are approved in the form of lease according to the construction period.

4. On-site management: meet the requirements of civilized construction;

5. Project progress: The effective construction period is 26 months.

1), piling will be completed before the end of 20xx, and raft foundation will be completed before the end of 20xx;

The subject has been accepted at the end of 20xx;

3) Complete the indoor and outdoor decoration and installation project before the end of June, and reach the turnkey condition before the end of August.

4), the whole community in 20xx before the end of May all delivered;

Second, the way and conditions of contracting (sending):

(a), the way of contracting:

1, the construction team is determined through negotiation by the contractor * * *, and in principle, the contractor is dismissed;

2. Jian 'an materials, turnover materials and mechanical equipment shall be supplied by the owner according to the budget and construction organization plan;

3, within the scope of responsibilities, in the form of a salary contract, monthly salary according to the company's salary standard, according to the actual number of project department;

(2) Conditions of contract:

1, equipped with necessary construction management personnel, * * * seventeen people, specifically equipped with:

Main contractor (and project manager) 1.

1 chief engineer or technical director

Steel foreman (and safety officer) 1 person.

Woodworking foreman (and security officer) 1.

1 pipeline installation foreman

Electrical installation foreman 1.

1 concrete foreman

Technician (and librarian) 1.

Technician (part-time budget officer) 1

1 quality inspector

Warehouse keeper 1

Material accounting 1

Two doormen

Night watchman 2 people

Kitchen room 1 person

The above personnel are paid according to the standard, and the monthly salary is * * million yuan, and the project will be used by the project from the date of delivery.

2. The contractor has the right to adjust the work content of the project management personnel, and can reduce staff and increase efficiency by overtime, overtime and part-time. The salary of half of the personnel can be paid to relevant personnel on a monthly basis and settled after the project is completed. But the warehouse keeper, material accountant, doorman and night watchman shall not work part-time or be replaced. For employees who don't obey the distribution and don't work hard, if there are sufficient reasons, they can return the relevant personnel to the company and make other arrangements;

3. The contractor's project payment shall be paid to 60%~70% according to the schedule, and the rest shall be paid after the completion acceptance settlement;

4. Business entertainment expenses are RMB _ _ _ _ _, including the balance of all foreign reception and information consultation fees (including quality inspection stations);

5, to create a safe and civilized construction site fee and civilized construction measures fee according to the actual settlement.

Three, risk of mortgage, reward and punishment conditions:

(1) Risk mortgage:

1. When this agreement comes into effect, the contractor shall pay the risk premium of RMB.

2. After the contract expires or the project is completed, it will be evaluated according to the terms of the agreement and the balance will be returned.

(2) Reward conditions:

1. Complete the contracted indicators and settle the floating wages by stages;

2. Except for the individual floating salary, the rest of the commission or reward can be distributed independently, but the contractor (or contractor) shall not exceed 60% of the surplus accumulation, and the rest shall be distributed in the form of table and reported to the company's finance.

3. Reward for saving engineering materials: control 97% of the budgeted amount, and deduct 20% of the saved part. When the main project is completed, the material saving part of the main project will be settled, and when the project has the completion conditions, the material saving part of the decoration and installation project will be settled;

4, turnover materials, machinery and equipment according to the time limit for a project in the form of lease for approval, save part by 30% commission;

5, after the completion of safety indicators, the project reward _ _ _ _ ten thousand yuan;

6, was rated as "safe and civilized construction site" or high-quality model construction site, after the completion of the project reward _ _ _ _ ten thousand yuan;

7, such as business entertainment expenses within the prescribed scope, saving by 40% commission;

8. 20xx shall meet the turnkey requirements before the end of August, and shall be delivered in full before the end of May. All project personnel shall be rewarded with two months' salary (excluding floating salary) one month in advance.

(3) Punishment conditions:

1. If the contractor fails to complete the target by stages, the floating salary will not be estimated, the corresponding individual reward will be rejected, and the total progress index will be reissued;

2. If the contractor fails to complete 80% of the progress by the end of 20xx, he will leave automatically and reduce the loss of RMB _ _ _ _ _ million from the mortgage payment according to the percentage of the difference;

3. In case of serious personal and equipment accidents, except the part that should be borne by the contractor team, the expenses incurred shall be shared by the contractor and the employer according to the ratio of 4: 6;

4. Waste of engineering materials: control 97% of the budgeted amount and the excess consumption.

According to 10% fine;

5. Turnover materials, machinery and equipment shall be submitted for approval in the form of lease according to the construction period, and the excess part shall be fined at 15%;

6. If 20xx cannot meet the turnkey requirements before the end of August, and 20xx cannot be delivered in full before the end of May, all project personnel will be fined one month's salary (excluding floating salary) for each month's delay.

Four. Responsibilities of both parties:

(a), the employer's responsibility:

1, responsible for coordinating the material supply department to supply materials to the designated place with good quality and quantity as planned;

2, responsible for guiding the contractor to carry out the internal management of the project;

3, responsible for the supervision and management of project safety, quality, progress and other construction organizations;

4, responsible for cooperating with the general contractor to carry out external coordination;

5, responsible for guiding the technical work of the project, and check the construction technology;

6. Be responsible for creating conditions for project management in the management of contracting teams, and ensuring the smooth implementation of government decrees in project construction management;

7. Be responsible for approving and coordinating relevant departments to timely allocate the project progress payment and living expenses to the general contractor team.

(2), the contractor's responsibility:

1, responsible for preparing the construction organization plan, and organizing its implementation after being approved by the Employer;

2, responsible for the preparation of materials, turnover materials, machinery and equipment use plan;

3, responsible for the management of the general contractor team, timely handle and solve all kinds of contradictions and disputes;

4. Be responsible for the construction organization of the whole project to ensure the quality, safety and timely completion of the project;

5. Be responsible for the adjustment and solution of construction organization caused by water cut, power cut and waiting for materials in the construction process;

6, responsible for the organization and management of all project managers;

7. Responsible for the safety disclosure, safety education and publicity of all staff of the project, and strictly implement the safety technical standards;

8, responsible for the project site materials, turnover materials and mechanical equipment management;

9, responsible for reporting merit plan or "safe and civilized construction site" plan.

Verb (short for verb) Other:

1, the contractor shall actively cooperate with other relevant departments of the company to reduce the construction cost;

2. Relevant departments of the company should actively support the work;

3. The contractor shall carefully coordinate external relations and receive foreign inspectors.

Employer: _ _ _ _ _ _ _ _ Contractor: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contact: _ _ _ _ _ _ Contact: _ _ _ _ _ Contact: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 6 of the construction agreement Both parties to the agreement:

Party A: XXX, XXX, born on XX, XX, with the ID number of xxxxxxxxxxxxxxx.

Party B: XXX, XXX, born on XX, XX, with the ID number of XXXXXXXXXXXX.

XXX, XXX, XX was born on XX, XX, and his ID number is XXXXXXXXX.

Party B is the wife and children of XXX. Xxxx (employee of Party A) was electrocuted while working for Party A (former employer of xx) on XX, XX. In order to solve the problem of compensation after XXX's death,

Party A and Party B reached the following agreement through consultation:

1.XX's family came to Shanghai to take care of XX's funeral, and the travel, accommodation and living expenses of the deceased before cremation shall be borne by Party A..

2. Party A shall bear the funeral expenses of ×××××× during his stay in Shanghai. ..

Three. The above items 1 and 2 shall be settled by Party A according to the payment voucher provided by Party B. ..

Four. Party A shall pay death compensation to Party B: ××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××

5. The compensation mentioned in Article 4 above shall be deposited by Party A into its deposit account opened in the bank on XX at the latest. When Party A pays the compensation to the depositor in the deposit account under its name, Party B shall issue a receipt to Party A. ..

Both parties agree that after Party A has fulfilled all the above payment obligations, Party B shall not demand compensation from Party A for any other reason.

7. This agreement is made in triplicate, with each party holding one copy. Shanghai Notary Office keeps a copy for future reference. This agreement shall come into effect as of the date of signature by both parties.

Eight. Disputes arising from the performance of this agreement, if negotiation fails, shall be under the jurisdiction of xx Municipal People's Court.

Consent:

Party A: Party B:

Date of signature: XX, XX, XX, XX.

Signing place: