Beijing Decoration Steps Beijing Decoration Lite Decoration Process

1. Find a decoration company-finding a good decoration company will lay a good foundation for house decoration.

At the same time, the owner can also consult the decoration staff about the design style, cost and cycle of home improvement.

2. Determine the design scheme-the decoration company will make an appointment with the owner to measure the house, and then communicate with each other to formulate the design scheme and home improvement design drawings that satisfy the owner.

3. Evaluate the budget-get the design scheme and drawings that have been worked out, and after feedback from the owner, evaluate the budget and get a general idea of the cost of house decoration.

4. Signing a contract —— On the premise that both parties confirm the design scheme and budget, sign a contract for the construction of family room decoration project to clarify the rights and obligations of both parties.

When changing the contract, we should pay attention to not only reaching an agreement orally, but also signing a written change contract in time.

5. On-site disclosure-In the whole process of home improvement, on-site disclosure is the first step before the construction starts after the home improvement contract is signed. Here, both parties to the contract can clarify some problems that are not easy to explain clearly in the contract.

6. Acceptance materials-material acceptance. After all kinds of materials purchased by decoration personnel are sent to the site, they must be accepted by users.

Similarly, the user's materials have to be accepted by the decoration staff.

The construction can only be started after the signature of both parties, and the materials that have not been accepted shall not be started.

If the construction is carried out without acceptance, the decoration personnel shall be responsible for the losses caused.

7. Demolition/Concealed Works-Demolition and transformation of the main body, mainly including wall demolition, wall building, wall covering, heating removal, replacement of plastic-steel windows, etc. The purpose is to put up the framework of the construction site first.

8. Make clear the area involved in the renovation process-before the workers enter the site, it is best to personally measure all corners of the house, write it down with a pen ruler, mark it clearly, and be sure not to be lazy.

The measurement contents mainly include: tile area, wall paint area, wallpaper area and floor area; Determine the main wall size.

Especially it is necessary to design the wall size of furniture in the future.

9. Demolition and transformation of the main body-the main body demolition and transformation is the first project, which mainly includes wall demolition, wall building, wall covering, heating removal, plastic steel window replacement, etc.

Remove the garbage in time to ensure the cleanliness of the room, but also for the convenience of construction.

At this time, it is time to settle the product door. At this time, it is best to browse the cabinets, range hoods, cookers and water heaters to make sure.

10. hydropower transformation-before hydropower transformation, the cabinet designer should make measurements first to help you determine the transformation scheme of power supply and waterway.

Water heater, it is also best to send someone to design the position of power supply and interface according to the model you determine.

1 1. Tiling-before tiling, buy a floor drain.

Buy a special washing machine or floor drain for the shower, and deodorize it.

After waterproof napping, we are ready to stick bricks.

In addition to the normal precautions for sticking tiles, the tiles are soaked in water and dried in the shade; Leave the broken tiles for cutting, and please make the rest before buying bricks.

At this time, the basin and faucet should be determined, and the cabinet designer should be invited to the door for the second time. At the same time, paint (ready mixed paint or varnish), wall paint, nitro paint, diluted water, etc. For example, wallpaper should be determined first.

12. painting-painting the wall has nothing to say. Leveling, grinding and rolling must depend on the skill of your oiler.

Need to remind everyone that if you want to paint the wall, you must pay attention to color matching. The adjusted color is lighter than the color card, and it must not be the same as or darker than the color card, otherwise you will regret it.

13. wallpaper work-after the wall paint is painted, the oil trade union will paint the place where the wallpaper needs to be pasted, and the paint can be dried thoroughly the next day, and then the master can be invited to paste the wallpaper.

At first, I was worried that pasting wallpaper would stain the painted white wall, but later I realized that pasting wallpaper was really a clean job! There is absolutely no need to worry. 14. Install the socket panel-it is best to buy a socket with switch function, especially in the kitchen, where rice cookers and microwave ovens can be controlled by switches, and at the same time, pay attention to practicality.

15. kitchen and bathroom ceiling-install water heater and yuba first. After installation, the ceiling edge can better semi-package the water heater, that is, the connection is more beautiful.

It's best to buy aluminum button ceiling, even if it is demolished many years later, it's worth a lot of money to sell scrap aluminum.

On the other hand, pvc gusset plates look good, but the quality and performance are average, and plastic things are worthless even if they are sold as waste.

When buying a gusset plate, ask the price of the whole package clearly, and don't buy the gusset plate and the corner separately.

But the installation fee is extra.