Examination and approval procedures for capital construction projects (1) Examination and approval procedures for government-invested projects (1) Examination and approval procedures: examination and approval of project proposal-examination and approval of project feasibility study report-examination and approval of project preliminary design (2) Application materials: (1) Materials to be submitted for examination and approval of project proposal 1. The approval document of the project proposal approved by the project owner unit after the examination and approval by the competent department; 2 the text of the project proposal, large and medium-sized projects and projects with special provisions should be accompanied by a pre-feasibility study report; 3 industry review opinions of the competent department of industry; 4. Initial financing plan. (2) Materials to be submitted for the approval of the project feasibility study report 1. The document of the project owner applying to the competent department for approval of the feasibility study report of the project; 2.? The text of the engineering feasibility study report prepared by the corresponding engineering consulting qualification institution; ? 3 planning and site selection opinions issued by the planning management department; 4 issued by the competent administrative department of environmental protection at the same level of environmental impact assessment approval opinions; 5. Pre-examination opinions on land use for the project issued by the land and resources management department; ? 6.? Large and medium-sized projects should have the evaluation report of engineering consulting institutions with corresponding qualifications or the expert evaluation opinions of demonstration meetings; 7.? Industry review opinions of the competent department of industry; 8.? Credit certificate, including financial capital commitment letter, unit's own capital certificate, bank loan fund letter of intent and other relevant capital certificates; 9.? Project bidding form (see attached table); 10.? Manage the project and put forward the plan for the establishment of the project legal person; 1 1.? The seismic safety evaluation stipulated by laws and regulations involves pre-approval documents such as civil air defense, fire protection, cultural relics protection, pre-evaluation of labor safety, health and epidemic prevention (pre-evaluation of occupational hazards), shoreline planning, sea area use, forest land requisition, water intake permit, soil and water conservation, flood control planning consent of water conservancy projects, comprehensive river basin planning consent and flood control review consent of river-related projects, overall planning approval, demolition planning documents of old city reconstruction projects approved by the province, and real estate development projects. 9 high-tech industrialization projects must be accompanied by a certificate of achievement appraisal. (3) Materials to be submitted for approval of the preliminary design of the project 1. After the application for examination and approval of the preliminary design of the project put forward by the project owner unit is examined and approved by the competent department; ? 2. The text of the survey report and preliminary design documents prepared by qualified institutions that meet the depth and requirements stipulated by the state; ? 3. Consulting design units with corresponding qualifications carry out preliminary design and budgetary estimate of the project.