How to order cabinets?

1, after fully understanding the market, fully comparing the word-of-mouth of cabinet manufacturers, product quality, workmanship details, service, installation and after-sales, and having a clear understanding of styles, you can determine the manufacturers, and then sign a bill to pay the deposit from 300 yuan to 500 yuan in advance. This deposit will be returned to the cabinet contract after signing the contract, and the deposit sheet will be kept properly.

2. After signing the bill, it will generally be recorded in the computer of the cabinet merchant. When the room is ready for decoration, the telephone manufacturer can ask the cabinet designer to make a home measurement (it is generally best to make an appointment two days in advance to avoid temporary arrangements to delay the decoration progress). Because designing a kitchen is a professional job, finding an experienced designer can get twice the result with half the effort.

3. On the day of the cabinet designer's door-to-door measurement, the customer and the cabinet designer need to jointly plan the kitchen layout and determine the location of waterways, circuits and electrical appliances. At the same time, the designer will give the customer a scheme of waterway and circuit transformation within 2 days, and agree with the customer to print it out and hand it over to the hydropower construction personnel for construction according to this scheme.

4. When the waterway, circuit and wall and floor tiles (in order to speed up the construction period of the cabinet, you can stick the wall tiles first and then the floor tiles) are all in place, you can ask the cabinet designer to come to the door to resize. At this time, the measured size is the most accurate, which can ensure the seamless fit of the whole kitchen (at the same time, the customer should provide the cabinet designer with the detailed dimensions of electrical appliances, range hoods, cookers and basins). It should be noted that:

1), whether there is enough space in the cooking area, washing area, storage area and cooking area.

2) Whether the height of the hanging cabinet and the height of the countertop conform to ergonomics and the actual needs of future home cooks.

3) Whether the space outside the cabinet can guarantee the normal operation requirements.

5. After the design scheme is determined, a detailed supply contract shall be signed. This contract needs to be signed with the designer at the store in advance. At the same time, a detailed list of every relevant detail is generally made, and every clause in the contract should be marked, which is also a guarantee for after-sales service in the future.

Pay for the cupboard after signing.

6. The delivery and installation of cabinets are generally free. Before leaving the factory, the factory staff will make an appointment with customers for delivery and installation in advance according to the time agreed in the contract. According to the installation quantity, it usually takes 1-2 days to install the cabinet first, and then install the countertop (before installing the cabinet, the kitchen should be hung up first, and if the smoke pipe of the range hood is a ceiling, the smoke pipe needs to be brought back and installed with the ceiling. )

7. After the installation of the cabinet staff is completed, the customer will conduct a comprehensive inspection of the whole cabinet and pass the acceptance (if there is any balance, it needs to be paid in one lump sum).

8. The kitchen is a comprehensive space integrating water collection, electricity and gas, and after-sales service is very important. When signing a contract, it is best to clearly stipulate the warranty time promised by the manufacturer and the time limit for answering customer questions in the contract, so that once the manufacturer fails to solve the problem in time, it can restrain the behavior of the manufacturer.