What is the construction temperature requirement of polyurethane waterproof coating? Can construction be carried out at low temperature?

Generally, polyurethane waterproof coatings will freeze at 0℃ and boil at 100℃. After freezing, the adhesive ability and waterproof effect of polyurethane coating will be reduced, so it is not allowed to construct outdoors at 0℃ or below. It is recommended to use R300, a multifunctional waterproof coating for Keshun household waterproof application. Its advantages are: strong adhesion, high waterproof and impermeability; High tensile strength, good ductility and strong adaptability to base cracking and deformation; It is easy and convenient to use when the bucket is opened, and the construction period is effectively shortened; Taking water as dispersion medium, water-based environmental protection.

Construction method: the base must be solid and smooth, free from open water, floating ash and oil pollution, and the angle of yin and yang should be made into an arc angle; The nozzle, gutter, eaves gutter, and yin-yang corner nodes within the construction scope are pre-coated and sealed, and tire base materials (grid cloth and non-woven fabric) are laid and reinforced during painting; The waterproof layer should be painted by Bo Tu method for many times, and it can be finished by 2-3 times. The interval between each layer shall be subject to the fact that the previous layer is dry and non-sticky, and the next layer must be perpendicular to the coating direction of the previous layer in order to achieve the effect of uniform coating; If the reinforced tire base material needs to be placed, it must be laid flat on the wet coating without wrinkles to be dried; Then fully smeared on the tire base, so that the coating permeates to form an integrated waterproof layer, and the coating on the tire base surface should be full and flat to ensure the waterproof effect; The thickness of the upper and lower waterproof coatings on the tire base shall not be less than1.0mm; ; The complete drying time of the coating film is about 2-3 days at room temperature, and the drying time will be prolonged in unventilated or humid environment; When adding a protective layer on the waterproof layer, it must be carried out after the coating is completely dried.

Want to know more about paint, recommend consulting Keshun home waterproofing. Keshun household waterproofing has the production capacity layout of the top ten production bases in China and the rapid response logistics service system. Covering the national market through dealer channels, e-commerce channels and home improvement channels. , providing one-stop home improvement accessories solutions for thousands of households and escorting consumers' better life. View future waterproof market bonus