The Development Course of Guangzhou Water Supply Engineering Company

Guangzhou Water Supply Engineering Company was established in 196 1 year, and is the backbone member of Guangzhou Water Investment Group Co., Ltd., with branches both inside and outside the province, with a registered capital of1139.93 million yuan. It has passed the certification and registration of ISO900 1 quality management system, OHSAS 1800 1 occupational health and safety management system and ISO 1400 1 environmental management system. He holds the first-class qualification of general contracting of municipal public works approved by the Ministry of Construction, and the first-class qualification of professional contracting of pipeline engineering, mechanical and electrical equipment installation engineering and architectural decoration engineering, and has many part-time qualifications such as general contracting of hydropower and water conservancy projects, urban landscaping, professional survey and design of municipal industries (drainage engineering and water supply engineering), surveying and mapping, quality inspection of construction projects, and foreign contracted projects. It has been responsible for the emergency repair of flood control and water supply and drainage leakage in Guangzhou, and is the second mobile flood control rescue team in Guangzhou and the three-prevention rescue team in Guangzhou. In recent years, the business scope has expanded to many fields, such as sewage pipe network disease detection, pipeline maintenance, toxic gas detection, river silt treatment, water purification, pressurization, water terminal maintenance and installation services.

Over the years, the company has undertaken a large number of key projects in Guangzhou and even the whole country, such as Zhou Nan Water Plant, which uses the most advanced technology in China to produce drinking water, and Guangzhou Xizhou Water Plant, which has a water supply of 500,000 cubic meters per day. Especially since 2008, the Jingxi Advanced Membrane Bioreactor (MBR) underground water purification plant, which has been recommended by the Guangzhou Municipal Construction Committee and other government departments as the construction enterprise for the comprehensive improvement of the urban environment of the Asian Games, has undertaken the construction of the DN3600~4800mm pipeline and the production of steel pipes and fittings for the Xijiang Water Diversion Project, and the fourth phase project of Emei Liede Sewage Treatment Plant is 65438+ 1 100 million m/d, which is the first underground water purification plant in Guangzhou to undertake the regional sewage pipe network. In the past 30 years, more than 5,000 kilometers of municipal pipelines and river-crossing pipelines have been installed.

The company has always adhered to the market-oriented, quality-oriented, honesty-based, user-centered and self-built large-scale municipal public works, all of which are well-known throughout the country for their excellent quality, guaranteed construction period and in-place service. A number of provincial and municipal high-quality municipal projects, safe and civilized construction sites, excellent structural projects and excellent model projects have been created, and the achievements of several QC teams have won excellent quality management awards for municipal engineering construction in Guangdong Province and the whole country. It has been rated as one of the top 100 enterprises with comprehensive construction strength in China, one of the top 10 enterprises in Guangzhou, an excellent unit of municipal engineering equipment management in China and an advanced unit of Guangdong Municipal Industry Association for many times. He is a member of China Construction Association. It has been rated as a "contract-abiding and credit-abiding" unit in Guangdong Province for 20 consecutive years, and has been rated as an AA-level credit enterprise by China Construction Bank for 6 consecutive years.