Model essay on librarian career planning (1)
1. As a budget officer of the engineering department, I can finish the operation and management of the project department on time according to the rules and regulations of the company and the project department.
1, Internal Skill. According to the requirements of the company, the actual construction output value and cost analysis of the month are counted at the end of each month. Participate in the cost analysis meeting in time, make an analysis report on the monthly profit and loss of the project department, prepare the budget for the construction stage according to the actual situation of each sub-project on each floor, print all the quantity analysis, and distribute it to the production manager as quota labor and quota materials. In the actual construction process, according to the actual situation on site, the quantity and content of the quota will be adjusted scientifically and reasonably as the basis for manual control and distribution of the engineering task list, and the quota materials will be used as the warehouse of the quota. At ordinary times, I always actively cooperate with the project manager in contract management, participate in some subcontracting negotiations, and draft some subcontracting contracts according to the company's regulations and the actual situation of the project department. After the subcontract is signed, I will track and manage the subcontract, complete the actual construction work of the project department last month (including the rough work of subcontractors) at the beginning of each month, count the quota materials, submit relevant reports to the company, submit the main material plan for next month to the company at the end of each month, and estimate the construction output value of next month. In the process of construction, the quota acquisition and cost tracking control are implemented to provide some reasonable guarantee measures for the cost control of the project department, provide some business information and data for the project department in time, and do a good job in project cost accounting in time. Attend project meetings on time and be on duty according to company rules and regulations.
2, foreign (to the owner and supervision) work. Submit the construction progress report to the owner and supervisor at the end of each month as the basis for paying the project progress payment, check the engineering quantity with the investment supervisor in time, and cooperate with the project manager to urge the owner to pay the project progress payment last month after the progress output value is determined. Issue the engineering visa to the owner in time, do a good job in quoting some claims, especially some engineering materials, and quote them to the owner and supervisor in advance, so that after the owner's review, the materials engineer of our construction party can purchase them in time and make the project construction smooth. In short, adhere to the business policy of maximum income and minimum expenditure. Internal work shall be timely, accurate and realistic, and the quota shall be grasped and the quantity shall be controlled; The field data is complete and applicable, and the relationship between the owner, the supervisor and the contractor should be handled properly. Sometimes, if you encounter some difficulties in your work, contact the leaders in time to report, so as to better solve the problem and strive for the maximum profit of the company.
Second, actively do a good job in engineering audit.
Third, obey the work arrangement of the company leaders and actively do a good job outside the project department. I always put the overall situation first in my work. Actively participate in the company's bidding work and other budget work. No matter how busy my project department is, I always obey the work arrangement of the company leader. At that time, there were many events in the project department, so I always worked overtime and used my time reasonably and scientifically, which not only completed the events in the project department, but also completed the tasks arranged by the company.
Fourth, actively adapt to and abide by the implementation of the company's various management system reforms, and further strengthen the sense of responsibility. Since the beginning of this year, the company's rules and regulations have been improved or further improved. I always actively adapt to this situation, based on the company's current rules and regulations and the professional ethics of budget officers, strengthen my sense of responsibility, do my work well in time, and try my best to serve the enterprise.
Fifth, use the rest time after work to strengthen study. At ordinary times, we should pay attention to collecting the current relevant quota documents in Fuzhou and strengthen the study of business knowledge such as engineering quantity calculation skills. Study computer knowledge hard and improve your work efficiency. Usually pay attention to collect relevant current quota documents and market information, and strengthen the study of business knowledge such as engineering quantity calculation skills and cost software use, and constantly improve their work efficiency and voluntary efforts.
The above is a rough summary of my personal work for one year, please review it by the leaders. If there are any shortcomings in my work, please point them out so that I can correct them in time and work better.
Model essay on librarian's career planning (2)
My internship unit is an affiliated company. I didn't know what an affiliated company was before. Now I understand the affiliation refers to some enterprises (units), social groups or individuals, in the early stage of investment or development, for a certain purpose, with enterprises of different economic nature. Most of the affiliated persons and the affiliated persons have signed the affiliated agreement, and the affiliated person pays the management fee to the affiliated person. The related party does not have any investment in the related party, but does not ask about the related party's business situation, creditor's rights and debts. Generally, it is only responsible for handling business licenses, tax registration and other licenses for affiliated personnel. The name of the company is Guangxi Huahang Construction Engineering Co., Ltd., and I am doing water conservancy projects in Hezhou. I just work in the project department, not in the head office.
I work as an information officer in Hezhou Project Department. Although I prefer the internship position of budget officer, I will take advantage of the opportunity to learn. When I first started making materials, the leaders felt that I had just contacted them and didn't give me any difficulty. They showed me the relevant drawings of Baima and Dachong Reservoir in Pinggui Management District of Hezhou City, so that I could get to know the general situation of the reservoirs first and save the general situation of the project in an electronic document. Whenever I encounter something I don't know, I will first ask myself if I can. If it really doesn't work, I'll ask the leader. When I saw the general situation of the project on the drawings, I knew: I would look for something I didn't understand first, and there would always be unexpected gains; If you really can't find it, ask someone. No big deal. Ask if you don't understand.
In fact, I found the workflow of looking for librarians online, including: pre-construction data, quality acceptance data, sub-test data, certification data of materials, products and components, construction process data, supplementary data when necessary, and completion data.
Preparation materials before construction include: bid-winning notice and construction permit, construction contract, supervision contract of entrusted supervision project, approval letter and report of construction drawing review, quality supervision register, geotechnical engineering investigation report, joint review record of construction drawing, construction organization design or construction scheme approved by the supervisor (or owner), and commencement report. What I came into contact with was the construction organization design scheme. According to the previous model essay, the construction organization design scheme of Baima Reservoir and Dachong Reservoir is revised. There are quite a lot of contents in the group. There are general construction instructions, overall project planning (the organization chart of the project manager and their respective responsibilities are required), construction layout and temporary project construction scheme, construction progress and time limit guarantee measures (the main mechanical equipment and labor plan are listed), main project construction scheme (demolition project, earthwork excavation construction, new drainage culvert, reinforced concrete lining construction, masonry engineering, drilling grouting engineering, culvert sealing and slope protection construction), construction measures in winter and rainy season, and project quality management and guarantee. Most of them can be obtained from online search, as long as they are slightly modified. Of course, there are also some problems in the process of compiling. For example, I don't know much about the organization chart, which wastes time in the process of slowly exploring; I don't know the specific situation of this reservoir. It is the most nerve-racking when Baidu is not there, especially when the leader is not there, so I can only do something else first. Waiting is also a kind of suffering and exercise.
There are many special construction schemes for water conservancy projects. I thought there was a special plan in the construction team, so I didn't have to do anything else. Actually, I was wrong. If the main project of Baima Reservoir is a tunnel construction process, special construction schemes such as flood control scheme, slope protection and grouting should be added, as well as special safety construction scheme and quality assurance measures.
Students who practice in water conservancy engineering companies should have been exposed to the water conservancy and hydropower construction evaluation form, which contains quite a lot of content. I have never been exposed to these forms, and I was shocked after receiving the task. With the help of Baidu and Documentary All-in-One, I found the model. I admire the power of Baidu!
The dam site of Baima Reservoir is located in Ma Bao Village, shatian town, Pinggui Management District, Hezhou City. The designed irrigated farmland is 80,000 mu, and the actual irrigated area is 60,000 mu. The geographical location of the reservoir is 1 1 1? 27? 00? , 24 north latitude? 18? 50? , is a small "II" reservoir mainly for flood control and irrigation. The reservoir engineering category is Class V, and the main building level is Grade 5; The reservoir started in June 1965+ 10, and was completed in June 1970+065438+ 10.
The reservoir is located on the tributary of Hejiang River in the Pearl River Basin, with a rainwater collection area of 2.20K? The original design has a total storage capacity of 800,000 m3, and the basin in the reservoir area belongs to subtropical climate with mild climate. The reservoir hub project consists of dam reinforcement project, spillway reinforcement project, drainage facilities reinforcement project, flood control highway reconstruction project, new duty room construction project, metal structure equipment and installation project. The original river bottom elevation in the dam site area is 105. 16m, the river bottom bed width is about 1 10m, and the river valley is? u? Zigzag, the mountains on both sides of the strait are gently undulating. The barrage directly crosses the river bed, and the dam axis is arranged in the north-south direction. The main construction projects of Baima Reservoir reinforcement project include dam reinforcement project, spillway reinforcement project, drainage facilities reinforcement project, flood control highway reconstruction project, new duty room construction project, metal structure equipment and installation project.
When making the project quality evaluation table, we make our own evaluation according to the unit project. For example, the quality evaluation table of consolidation grouting unit of rock foundation is used for filling grouting; Curtain grouting unit engineering quality evaluation table of rock foundation for curtain grouting; Quality evaluation table of earthwork excavation soft foundation and bank slope excavation unit; Concrete unit engineering quality evaluation table is used for concrete slope protection and bottom plate; Quality evaluation table of unit project of sand and gravel cushion and filtration engineering; Quality evaluation table of mortar masonry tooth wall and mortar masonry pier unit engineering, etc. Important concealed unit projects (key unit projects) also have quality grade appraisal tables, which are mainly used to identify filling grouting and curtain grouting. After completing the evaluation form and appraisal form, there is also a three-inspection form for the construction quality of water conservancy and hydropower projects, which is used for the initial inspection, re-inspection and final inspection of special unit projects.
I searched online for the requirements for the contents of the contractor's monthly construction report:
1. The contents, methods and copies of the monthly construction report must meet the requirements of the owner (generally, we, the supervisor and the owner each have one copy).
Second, the contents of the construction monthly report shall meet the following requirements in addition to the requirements of the owner.
(1) monthly construction introduction
(II) Introduction to the implementation of the construction progress plan
Description of the implementation of the production plan last month. Requirements according to the culvert, bridge and unit engineering number sequence.
Analyze the reasons why the plan is ahead of schedule or behind schedule, focusing on the impact on the total construction period.
Explain the production plan for next month (the monthly production plan must be signed by the project leader). The original production plan for next month requires 1 copy (main station) and 1 copy (sub-station); Requirements according to the subgrade, culvert, bridge and unit engineering number sequence, (subgrade unit engineering for continuous construction section; The culvert unit project is based on each culvert; Pier and abutment as the compilation unit of bridge unit project).
Description of allocation of construction resource elements next month:
1) List the construction machinery invested, including name, model, quantity and intact condition (list each item).
2) List the main consumables, quantity and origin (listed by project) for next month's construction.
3) The list shows the list of special types of workers who will be employed in the construction next month and their certificate numbers (listed by bureau and project).
4) List the construction safety management personnel to be employed in the next month's construction and their certificate numbers (listed by bureau and project).
5) List the quality inspection engineers who will take up their posts next month and their certificate numbers (listed by bureau and project).
6) List the number of managers, technicians, special types of work and workers on the job next month (by bureau and project).
(3) Description of the quality of the construction project
The list shows the inspection of the inspection lot of the completed project and the quality evaluation of the sub-projects and sub-projects The inventory requirements are the same as those in Article 3 (2).
The list shows all kinds of tests and tests completed this month. According to different materials, different varieties, different types, different specifications and different test methods, it is required to be listed in the table in chronological order.
General situation of construction inspection plan for next month.
The list shows the quality problem notifications and rectification received this month.
(4) Introduction of construction safety.
The list shows the safety problems (accidents), the rectification notices of potential safety hazards and the rectification situation received this month. Can be the same as item (3) point 4.
(5) Introduction of construction environmental protection.
(6) Introduction of design changes.
The table format shows the reports that need design changes this month, the design change numbers received and the contents of the reports that have not completed design changes.
(7) The list of progress obstacles indicates the progress obstacles.
(eight) the construction unit needs to ask questions.
With the main contents and templates, the monthly construction report will be completed soon. Among them, when I was making a monthly report on the use of materials, I was worried because I didn't know how much materials I had purchased and consumed. After consulting the leader and thinking for myself, I understand that the material consumption is based on the workload completed this month. Just multiply this amount by the material consumption in the unit price analysis table. My contractor will print it out, and the project manager will sign and seal it and send it to the supervision organization and the construction unit.
Through this construction practice, I have a more comprehensive understanding of the direction of future efforts. In fact, it is really difficult to learn more knowledge and skills in such a short construction practice. However, in the construction practice in the past few days, I have clearly recognized the direction of future water conservancy projects from a more comprehensive perspective. As leaders and engineers said in their internships: What do you need to be modest to learn carpentry after graduation? .
Indeed, after graduating from college and taking up a new job, we are faced with a blank sheet of paper. Everything is new, and everything is waiting for us to work hard. So in the face of so many colleagues who have been engaged in water conservancy projects for a long time, their work experience is richer than ours, their knowledge is more solid than ours, and their knowledge is deeper than ours. Only by patiently asking them for advice and learning with an open mind can we make greater progress, and we will also have greater gains in this difficult and challenging field of water conservancy projects.
In addition, in this graduation internship, I also found some shortcomings and deficiencies, mainly the following two points:
First, the mastery of professional knowledge is not comprehensive enough. Although I have studied professional knowledge seriously at school, my current knowledge is not wide enough to be easily qualified for water conservancy projects. Therefore, although I will take up my job in the near future, I will take my job as the beginning of a new study. Only by studying in practice can I master more professional knowledge and skills.
Second, professional practical experience is far from rich. Due to the lack of professional practice time, it is difficult to apply what you have learned to practice, and the experience gained through practice is even scarcer. Therefore, in the future, we must seize the opportunity to learn from the predecessors engaged in water conservancy projects, and at the same time, we must change our own learning methods and attitudes, change the passive absorption learning style that relied too much on teachers in the past, actively learn from others and ask for advice, and at the same time strengthen our self-learning ability and problem-solving ability.
In a word, I will experience the results of this internship well, which I believe will be of great help to my future work.
Model essay on librarian's career planning (3)
At the beginning of the new year, summing up the upcoming xx years, from the initial inexperience of the engineering maintenance department and archives to the present handy, can not be separated from the correct guidance of department leaders and the enthusiastic help of colleagues.
I remember when I first came to the company, I was very worried about how to get along with my colleagues and how to carry out my work. However, after nearly half a year's work and study, I found that what I was worried about at first was superfluous. The relaxed and harmonious working atmosphere of the company, the corporate culture of unity and upward, and the enthusiasm of helping each other among colleagues made me quickly integrate into the big family of Zhu Jiang and gave me higher work enthusiasm.
In the engineering department for nearly half a year, I tried my best to do my job well. My main work and summary this year are as follows:
A, collect information generated by the engineering department.
1, responsible for collecting the distribution, recycling, borrowing and circulation of documents and materials of this department. The documents and materials received every day should be processed on the same day, and other materials should be processed within one or two days if there are no special circumstances. The materials that need to be scanned should be sent to relevant personnel for scanning and uploading in time, and there should be no data backlog. A detailed registration account has been established for the information between various departments within the company and the construction unit.
2. Responsible for receiving and tracking maintenance data. In the aspect of maintenance data arrangement, a detailed receiving and dispatching account (handwritten and electronic version) has been established. The filing of maintenance data is lagging behind, because the application form for engineering maintenance needs to go through the online approval process, which is slow. Some engineering maintenance application forms have been submitted for several months (the reporting time of engineering maintenance application form with the number yh20xx-006 1 is 20xx.07. 10), and the online approval process has not been completed so far, which has affected the acceptance of engineering maintenance and the filing of materials (see
3. The materials generated by this department are set up with special file boxes according to the receipt, delivery list, engineering maintenance application form, engineering maintenance acceptance form, engineering maintenance notice and engineering maintenance waste handover form, with a clear electronic volume directory, and each box has a clear file back for easy searching.
Second, the file data arrangement
For the arrangement of archives, firstly, the archives are classified according to the block types of Zhuhai section and Jiangmen section, and each block is classified, boxed and displayed in the cabinet in detail by receiving, issuing, changing, measuring and drawing.
I) Material arrangement of Jiangmen section
1, the phenomenon of sending and receiving documents in each bid section
Some documents in Jiangmen are lost and copied, especially with government departments. Most of them are copies, and some documents are missing attachments. The attachments of the documents are as follows
There is no signature confirmation, many documents have no processing table for company document review, and the format of document approval form is not uniform. All kinds of documents are available, and the documents are incomplete, which does not meet the acceptance conditions of completion data. In terms of document number sorting, there is also a phenomenon of missing documents in documents issued by Jiangmen Section Company. The document number sorting is somewhat confusing, and there is a phenomenon of duplicate document numbers, and some documents lack attachment materials.
2. The phenomenon of changing the design notice.
The design change notice issued by the design institute is divided into three types: bridge change, ground change and line change. Among them, the notice of bridge design change is seriously lost, and some originals in the existing materials have been lost, only copies are available. There are only 20 1 line transformers, and 1 to 200 line transformers are not. I don't know if they exist, but I don't know. The notice of design change omission has been uploaded to the design institute and has not been replied yet.
3, engineering change phenomenon report
Many engineering change application reports submitted by construction units in Jiangmen section are stored in the archives without approval, which does not meet the conditions for storing data in the archives. The unapproved engineering change application report has been sent to relevant departments for approval. The company shall keep an approved application report for engineering change, and the rest shall be returned to relevant units or departments for preservation, but not returned.
4. The phenomenon of data arrangement in measurement.
The measurement data of each bid section of Jiangmen section, whether it is the measurement data of each period (including attachment data) reported by the construction unit or the monthly payment report of measurement that the company should return to the construction unit, are lost to some extent. Monthly payment statement in six copies, one of which should have been returned to the construction unit and the other one has not been returned.
5, the phenomenon of the bidding drawings.
The arrangement of drawings is classified according to preliminary design, two-stage construction drawing, two-stage construction drawing modification and geological survey. Because there are too many drawings, the cabinet is not enough and it is not convenient to find, so it is temporarily put on the ground in turn, which is a bit messy and does not meet the requirements of file placement.
6. Handover of Completion Data of each Bid Section of Jiangmen Section
At present, there are only three blocks in Jiangmen section that hand over the completion data to the archives room, namely, Jiaoan Bid 5, Bid 6 and Bid 1, and the rest have not been handed over. Due to cross-construction, the handed-over completion data is incomplete.
2) Information collation of Zhuhai section
1, every bidding document, design change notice, engineering change report and survey data arrangement of Zhuhai section, such as Jiangmen section, are lost, duplicated, unapproved and incomplete. Among them, the geological change of the notice of design change begins with No. 6 1, it is not clear whether the geological change design notice exists fromNo. 1 to No.59. The missing engineering change design notice has been uploaded to the design institute together with the missing Jiangmen section, and there is no reply.
2, the phenomenon of the bidding drawings.
The drawings of Zhuhai section are the same as those of Jiangmen section, and are placed on the ground according to the bid sections and categories. In the process of sorting out, it is found that the drawings of Hemaxi Bridge in the second bid section of Zhuhai section are only preliminary design drawings and scheme design drawings, and all other drawings have been lost.
3. Handover of Completion Data of Zhuhai Section
Up to now, there are five bid sections for Zhuhai section to hand over completion data to the archives room, namely the fourth bid section, the tenth bid section, the thirteenth bid section, the second bid section of Jiaoan and the third bid section of pavement. Among them, the materials of Zhuhai 13 bid and Jiaoan 2 bid were only handed over to an original without binding; As-built drawings of Zhuhai 10 are not packed according to the requirements of as-built drawings. There is cross construction in Zhuhai section, so the handed-over completion data is incomplete.
Construction data of expansion joint bid section have been handed over to the archives room.
3) Information borrowing and collection in the archives.
Actively cooperate with various departments or individuals to borrow and consult the materials in the archives. If there are materials they want in the archives (because the materials stored in the archives are incomplete), they will get them at the first time. If there is no information in the file, give them a clear answer. No, in order to prevent the file from being lost in the process of borrowing, there is a detailed borrowing registration account for the file borrowing. In order to avoid the situation that materials are lost after collection but not collected, a detailed record account is also kept for the collection of materials in the archives.
Third, shortcomings in the work.
Because it is the first time to contact with engineering maintenance data, I am in a state of learning by doing in practical work, and the arrangement of data is not as smooth and ideal as the construction data and completion data in the construction process. In addition, there are many kinds of materials in the archives, and the contents are complex, which is confusing when I first took over, and it is relatively difficult to sort out the materials. All the data need to be entered into the computer to establish an electronic version of the registered catalogue, so the entry of the electronic version of the registered catalogue is a bit slow.
Four. Xx year work plan
1. Track and collect the engineering maintenance data of the maintenance unit, further improve it and file it in a unified way.
2. Speed up the entry of the directory in the archive volume and make it as complete as possible.
3. Assist the construction unit to hand over the completion data.