How to write a project extension report

Template:

Project Extension Application Report (No.)

Contractor: ContractNo.:? Supervision unit:? Make up? Number:

To the chief supervision engineer? Sir:

Due to the extension of the contract period, I applied for an extension of the construction period, which is now submitted to you for approval. ?

Attachment:

1, the time, reason and voucher of the deferred event; (Internal reasons of the company)

2. Extension time and timetable. ?

Contractor:

Date:

Opinions of resident supervision engineer:? Sign? Word: date:?

Fan Wen:

CSR Logistics Scan Code Wireless AP Weak Current Project? Application report for extension of construction period?

China South Locomotive Company Limited:

The total number of APs in the weak current project of CSR logistics code scanning wireless AP undertaken by us is 1 17, and the original planned construction period is from May 22nd, 20 15 to June 30th, 20 15; Our company officially started construction on May 22, 20 15. By June 23rd, 20 15, 89 AP points had been accumulated, but 28 AP points were not completed.

Since the project department of our company entered the workshop and organized the construction on May 22nd, the following problems have affected the normal construction and progress of this project of our company:

1. Influence of various factors on the entry and stop of bogies: (1). Our company communicated with the person in charge of the bogie division for four consecutive days from June 9, 2006 to June 23, 2006. Due to the fault of the construction party, the person in charge of the bogie failed to sign the AP distribution diagram, and the work stopped continuously from June 9, 2006. (2) The core problem of shutdown is mainly composed of two parts. First, the Bogie Division requires that the optical fiber backbone network be re-moved from the office network room to the workshop of the big iron room. Second, it is required to expand the coverage and AP point of the workshop of the big iron house.

2. Impact of backbone network equipment: During the construction process, through our judgment and communication with the network center, we found that many original backbone network switch equipment was damaged and replaced, which affected the construction progress of some AP outlets. At present, some AP network switch access points have no WLAN (wide area network) upload, and are communicating with the information center to solve it. ?

3. Changes in equipment and materials: Most of the cable sleeves of the original bogie division were PVC pipes, which were changed to galvanized pipes at the strong request of the person in charge, greatly increasing the working hours (the sleeves of workshop monitoring and phase I AP logistics code scanning system were all PVC pipes).

In view of the above situation, considering the later construction comprehensively, we also actively took corresponding measures, adjusted the original construction plan, installed one as soon as possible, and accelerated the construction progress of the project as much as possible. However, in order to ensure the engineering quality and construction safety of this project, we hereby apply to your company to extend the effective construction period of this project by 10 day and postpone the completion time of this project to 20 15 July 10 day. Please give an answer from the leader of your company. Thank you very much for your support of our work. ?

Salute!

Zhuzhou hongrunda trading co., ltd. projects department

2065438+23 June 2005

Extended data:

The delay of project progress is generally divided into project delay and project delay, and their responsibilities and handling methods are different.

(1) Project extension. The extension of construction period due to the contractor's own reasons is called project extension. All losses caused by the project delay shall be borne by the contractor himself, including the increased cost of measures taken by the contractor to speed up the project progress with the consent of the supervision engineer.

At the same time, due to the extension of the construction period caused by the project delay, the contractor will also pay the owner compensation for the delay loss. The extended time due to the delay of the construction period does not belong to the contract construction period.

(2) Project delay. The extension of construction period due to reasons other than the contractor is called project extension. After the extension is approved by the supervision engineer, the extended time is part of the contract period, that is, the completion time of the project is equal to the time specified in the bidding documents plus the extended time approved by the supervision engineer. The reasons that may lead to the delay of the construction period include the increase of engineering quantity, failure to provide drawings to the contractor on time, bad weather conditions, interference and obstruction by the owner, etc.

The general principle for judging the project delay is the delay or interruption of the project caused by any reason other than the contractor himself. Whether the project delay in the project belongs to the project delay is very important to both the contractor and the owner. Therefore, according to the relevant contract conditions, we should correctly distinguish between project delay and project delay, and reasonably determine the time of project delay.