Brief introduction of Qingdao Hengyuan Thermal Power Co., Ltd.

Qingdao Hengyuan Thermal Power Co., Ltd. is located in the north-central part of Lingang Industrial Zone in Qingdao Economic and Technological Development Zone, at the northeast corner of the intersection of Haier Avenue and Weihe Road, No.777 Weihe Road. Xinlong Logistics Company is a green space with a width of about 100m on the east side of the factory, and Aucma Talent Apartment is located on the east side of the company, 300m away from the project. Dong Xiaozhuang Village is located at 100m opposite to Weihe Road and the green belt on the south side of the factory (the original village bungalow has been moved, and now it is several two-story duplex buildings), and Fushan Rishui Food Co., Ltd. is located at the south side of the village, about 420m away from the project, which is located at about 200m southeast of Weihe Road in Aucma Industrial Park; To the west and southwest, Haier Avenue and Weihe Road are separated by Pohang Iron and Steel Company. The north side is adjacent to the fire brigade of the development zone and You Zheng concrete industry.

The enterprise is located about 8 kilometers southeast of the city center and 4.5 kilometers east of Qianwan Port. Project content: In order to meet the increasing demand of heating for residents and production gas for enterprises in Area B, the enterprise plans to build 1× 130t/h high-temperature sub-high-pressure circulating fluidized bed boiler (UG- 130/5.3-M) and corresponding coal conveying, water supply, desulfurization facilities (double alkali method) and dust removal facilities (electric power)

The total area of this project is about 1700m m, and the main buildings and structures include boiler room, deaeration room, coal bunker room, dust collector, desulfurization facilities, slag bunker, etc.

The planned investment of the project is 6,465,438+million yuan, of which the environmental protection investment is about 1.0 1.52 million yuan.

Main pollutants: The pollutants generated by the project mainly include smoke and dust, sulfur dioxide (SO2) and nitrogen oxides (nitrogen oxides) in boiler exhaust gas; Equipment noise; Production wastewater and domestic sewage; Boiler ash, slag, desulfurization slag and domestic garbage.

Preventive measures: At present, 3×75t/h+1× 130t/h boilers all adopt double alkali desulfurization; 3×75t/h boiler adopts three electric fields for electrostatic dust removal, and 1× 130t/h boiler adopts four electric fields for electrostatic dust removal. After transformation, the newly-built 1× 130t/h boiler adopts electric bag compound dust removal and double alkali process for desulfurization; Take comprehensive control measures such as vibration reduction, noise elimination and sound insulation for the main noise sources; Production wastewater and domestic sewage are discharged up to standard after treatment; Comprehensive utilization of boiler ash and desulfurization slag solid waste. By taking the above measures, the discharge of various pollutants can be effectively controlled. The company has developed a circulating water heating project, which is the first clean development mechanism (CDM) project approved by Qingdao. In order to further strengthen enterprise energy management, improve and optimize enterprise energy conservation and emission reduction, the company implemented a pilot project of circular economy. At present, as one of the key pilot projects, the renovation project of enterprise slag cooler has been completed. In this project, the circulating fluidized bed boiler (the temperature is generally 900℃) is manually deslagging, and the residual heat of slag is heated to desalt water by installing a slag cooler, which improves the boiler efficiency by 1-3%, and solves the potential safety hazard, energy waste and environmental protection problems caused by manual deslagging. The project investment is 850,000 yuan, which can save 700 tons of standard coal every year.