Department in charge: Shanghai Dacaojing Project Preparation Office
Main equipment required: (for reference)
Four pipeline fittings \ water treatment, condensate fine treatment, primary fan, induced draft fan, various valves, transmitters, industrial TV, water ring vacuum pump, condensate pump, heating network heater, turbine bypass device, roof ventilation, coal conveying equipment, coal pulverizer, coal feeder, slag removal system, deaerator, air preheater, crusher, pneumatic ash removal system, bag dust collector, flowmeter, compensator and crane.
The main products are 2× 1 10,000 kw ultra-supercritical coal-fired generator sets.