Shortly after the founding of New China, Qingshan Thermal Power Plant, as one of the key projects of the First Five-Year Plan 156, became the first high-temperature and high-pressure thermal power plant in Shanhaiguan in 1950s. The total installed capacity of the first phase of the project was 1 1.20 million kilowatts, accounting for 6 1.36% of the installed capacity of Hubei Province at that time. The commissioning of1996 300 MW unit further established the position of Qingshan thermal power plant as the main support point of Hubei backbone thermal power plant and eastern Hubei power grid. After the construction of the seventh phase project, Qingshan Thermal Power Plant has 12 generator sets with a total installed capacity of 986,000 kilowatts. During the period of construction and development, Zhu De, Li Fuchun, Qian visited the factory successively, leaving a glorious footprint in Qingdian.
For more than 40 years, Qingshan Thermal Power Plant has supported Hubei Power Grid and Central China Power Grid, shouldering the heavy responsibility of safe power supply and thermal energy supply for WISCO, generating 94.6 billion kWh of electricity and heating 360 million kilojoules for WISCO. In the 2 1 century, Qingshan Thermal Power Plant has followed the basic principles of "market-oriented, reform-driven, benefit-centered, scientific and technological progress as the soul and management as the focus", and has carried out a series of system reforms and management innovations, and achieved initial results. It has been awarded the titles of "Two Civilized Units" and "Civilized Unit of Hubei Power System" by former State Power Company, Central China Branch of State Power Company and Provincial Power Company, and also awarded by Hubei Provincial Party Committee and Provincial Government.
Development is the last word. After the 300MW/kW unit was put into production and formed a certain production capacity, the first phase of the "oil to coal" project, namely, No.9 and 10 two 100MW oil-fired boilers were transformed into coal-fired boilers, which were connected to the grid one after another at the end of 2000, and the second phase of the "oil to coal" project included in the 200 1 national key technical transformation project was completed in 2006.
Accelerate the development of diversified industrial economy and establish Wuhan Qingyuan Group Company, with an annual profit of more than 8 million yuan. The maintenance company has gained a firm foothold in the maintenance market of Zhujiang Power Plant, Haikou Power Plant, WISCO affiliated power plant, Qianjiang Huasheng Power Plant and Ezhou Power Plant, with an annual output value of over 30 million. Breakthroughs have also been made in opening up the international market. On October 26th, 2002, 10 was awarded the technical training and commercial operation contract of Kuching Power Plant in Malaysia.
Qingshan Thermal Power Plant regards the construction of enterprise culture as the breakthrough point of the construction of two civilizations, and incorporates the construction of enterprise culture into the overall development plan, creating a management system, operation mode and spiritual outlook full of "green power characteristics", which has penetrated into specific work such as production and operation, safety and stability, internal and external communication, and code of conduct. Through the colorful cultural life of employees, it has formed a good fashion of loving their jobs, unity and cooperation, and being polite. Faced with fierce competition and severe challenges, Qingshan Thermal Power Plant, based on the situation of power system reform and the enterprise's own situation, put forward the overall development strategy of "developing both inside and outside, striving for the first class with the wings of Qi Fei". Specifically, it refers to: realizing the transformation from power generation to the coordinated development of main business and diversified operations, and taking a diversified road; While focusing on developing core business and cultivating core competitiveness, we should seize opportunities and expand diversified industries; Establish a modern enterprise system and create a national first-class power generation enterprise.
After 40 years of sowing, the green hills are greener. Facing the new situation and challenges, Qingshan Thermal Power Plant has taken active actions, thoroughly analyzed the internal and external environment, accurately grasped the conditions and opportunities, devoted itself to reform, and strived to create a bright future for Qingdian.