First of all, due to the drawing of monocrystalline silicon rods, the production cycle is 72 hours, which is very sensitive to the environment inside and outside the furnace. Therefore, in order to minimize the production loss caused by shift change (as everyone who studies physics knows, the more factors and links a system introduces, the worse its controllability). So we all work 12 hours 24 hours a day. For example, 1 Go to work from 8: 00 am to 8: 00 pm, then get off work at 8: 00 pm, and work the night shift at 8: 00 pm on the 2nd until 8: 00 am on the 3rd.
The world is very hard, in fact, it is constantly on the day shift and night shift, and it is the night shift of Changbai squad leader.
After a class, I can only have a good rest at home for 12 hours. Theoretically, you can go out to play or something after 12 hours, but it's not. Because 12 hours has to work for the next shift, you dare not go out for a stroll or something after 12 hours, so you should stay at home and rest and recharge your batteries.
I don't know if you can adapt to this kind of life. I resigned in less than half a year.
I hope it helps you. After all, this is my personal experience. By the way, I am talking about the production workshop, because I am an undergraduate and engaged in production technology. At first, I should be familiar with the workflow and master the technology with the operators.