How long will it take for Houying Datun Iron and Steel Plant to produce?

Houying Datun Steel Plant has never stopped production and has been producing.

Datun Branch of Houying Group Haicheng Iron and Steel Co., Ltd. is a subsidiary of Houying Group, which was established in March 2007 and located in Qiujiagou Village, Datun Town, qianshan district City, Anshan City. According to the geographical advantages of iron ore owned by the Group, on March 1 day, 2007, we invested 165 billion yuan to build two modern production lines from deep processing of iron ore powder to finished billet. The first phase was put into production in March 2008 and the second phase was put into production in mid-July 2009. The main products are continuous casting billet, hot rolled bar HRB400, 400E 8mm~ 12mm (coil), 14mm ~ 28mm (straight bar) and high-speed wire rod HPB3006.5mm ~ 65438.

Datun Branch has a raw material factory, two sintering machines (1105m2,1180m2), two100m2 pellet shaft furnaces and two 580 m? Blast furnace, four 300m? Lime kiln, two 1 00t converters, two continuous casting machines, two steel rolling production lines (1 800,000t and 500,000t respectively) and two gas holders (150,000 m? Dry blast furnace gas holder and 1 20000m? Converter gas holder) and other supporting facilities. The annual output is 2 million tons of pig iron, 2.6 million tons of billet, 900,000 tons of bar and 800,000 tons of wire.

In 2065,438+08, Datun Branch of Houying Group Haicheng Iron and Steel Co., Ltd. realized a revenue of 5.2 billion yuan, paid taxes of 600 million yuan, a profit of 85,654.38+0.07 million yuan and an output value of 490,654.38+0.64 million yuan. 20 19 overall capacity replacement and upgrading project investment, a modern, beautiful and safe new steel enterprise will soon be available.