Guangzhou Zhujiang Power Plant is currently the largest power production base in Guangzhou, located in Nansha Economic Development Zone, Guangzhou, with a total installed capacity of 4*300MW. The power plant will be built in two phases. The first phase is Guangzhou Zhujiang Electric Power Co., Ltd., which is equipped with two 300,000 kW domestic imported gas turbine generator sets with a total investment of 2.375 billion yuan. Construction started in May 1990, and was put into commercial operation in June 1994+0. In the second phase, Guangzhou Dongfang Electric Power Co., Ltd. installed two 300,000 kW domestic imported gas turbine generator sets with a total investment of 3 billion yuan. 1993 started construction in the third quarter, and officially put into commercial operation in June1997+February 3 1. Guangzhou Zhujiang Power Plant is the largest energy infrastructure project in Guangzhou since the founding of the People's Republic of China, accounting for 56% of the installed capacity of coal-fired power generation in Guangzhou at present, and the annual on-grid electricity consumption can exceed 7 billion kWh. It is the most important power supply source in Guangzhou, and plays an important role in promoting the social and economic development of Guangzhou, improving the regional investment environment and ensuring people's lives.
1996 was awarded "1995 Safe and Civilized Production Enterprise" by the Ministry of Electric Power Industry; 1998 was awarded "Double Civilization Unit of the Year1996-1997" by the State Power Company; 1999 was awarded the honorary title of "first-class thermal power plant" by the State Power Company; In 2000, it passed the ISO9002 quality certification of Guangdong Quality Certification Center and Moody's International Company. In 200 1 year, China Water Conservancy and Electric Power Quality Management Association awarded the title of "China Electric Power Unemployed Advanced Enterprise with Quality and Benefit".