20 1 1 The 30MW tidal flat photovoltaic power station invested by Jiyang, Sheyang, Jiangsu Province is the largest single commercial photovoltaic power station invested by private capital in China, with a total area of more than 700 mu. Ji yang 285W polycrystalline module 24.2MW, 240W polycrystalline module 1.5MW and 185W single crystal module 4.3MW are used in the power station. It is estimated that the total power generation during the operation period will be 882935MWh, with an average annual power generation of 353 17.4MWh and an average annual utilization hours 165.
From the perspective of saving land resources and maximizing income, the power station creatively applied the concept of compound ecosystem. By drilling more than 65,438+8,000 special cement piles with a length of more than 6 meters on the fish pond, and installing battery panels on the cement piles, the fish pond can continue to raise fish and the battery panels can generate electricity normally, which better solves the contradiction between developing new energy and occupying a lot of land. The power station is located under the high-voltage outlet corridor of Sheyanggang Power Plant. Among them, 28.5MW adopts fixed type, and 1.5MW adopts oblique uniaxial automatic tracking type. The automatic sun-chasing system designed and manufactured in the quarter increased the power generation by 30%.