Precautions for lifting telephone poles and cement poles are aimed at China Tower Network.

1. When lifting poles and cement poles, it is necessary to slide ropes, so choose the lifting point position. When lifting poles, it is 10-20cm. When it is confirmed that there is no abnormality through vehicle inspection, the lifting can be continued.

2. When placing telephone poles and cement poles, put them down slowly. After confirming that the telephone pole and cement pole are placed stably and firmly, you can loosen the hook, and the telephone pole and cement pole will tilt over and hurt people.

3. In the process of lifting, the operator shall not approach the stressed rigging, especially the inside of the stressed rigging.