2. The customer communicates with the designer, introduces the general situation and preliminary intention of the project, and agrees on the measurement time.
3. The designer made a door-to-door survey to further understand the customers' needs and intentions.
4. Agree on the deadline of the draft design.
(Design draft: graphic design scheme, style positioning, material selection and reference effect II. Draft design, contract signing. 5. At the appointed time, the customer came to the company to see the design draft, and a designer explained the design draft in detail and discussed it with the customer, and recorded the customer's opinions and suggestions. 6. The customer was satisfied with the draft design and adopted it. After the two parties reach an agreement, they sign a design entrustment contract, and the customer pays the down payment for the design (50% of the total design cost) and enters the scheme stage.
◆ A. If the customer is not satisfied with the design draft, he/she will inform the designer of his/her detailed thoughts and intentions through discussion and communication with the designer; The designer adjusts the secondary design scheme and makes an appointment with the customer to see the scheme again.
◆ B. When the customer is satisfied with the design draft and adopts it, the two parties discuss the design cost, sign a design entrustment contract after reaching an agreement, and the customer pays the design down payment (50% of the total design cost) and enters the scheme stage.
Iii. overall scheme 7. The design scheme includes renderings and construction drawing design renderings: each space and each design highlight are in accordance with the contract.
Construction drawing: drawing cover, drawing catalogue, design description, electrical design description, material description, original structure drawing, floor plan, wall dimension drawing, floor paving drawing, top plan, (top plan), comprehensive ceiling drawing, switch diagram, lamp position connection drawing, electrical layout drawing, electrical system drawing, elevation construction drawing, node drawing and details drawing.
8. After the design scheme is completed, the customer pays the final payment of the design (50% of the total design cost), and the customer takes away the design scheme drawings.
4. Construction Guide 9. If you need construction guidance, the customer should inform our designer two days before going to the site to arrange the time.
The construction guidance fee shall be calculated separately at the rate of 200 persons/day/person-time.