What does the second phase project of Malaysia United Steel include?

1. It is planned to produce production lines, bars and profiles. The construction scale is about 2.6 million tons of billet/year, and the reserved site is developed to 5 million tons of steel/year.

2. After the project is put into production, the daily output of qualified pellets is 2,200 tons, and the compressive strength is over 2,000 N, which can effectively improve the burden structure of 3.5 million tons blast furnace in Ma Zhong Guan Dan Industrial Park and solve the problem that pellets need to be imported from abroad.